Pacific Gas & Electric Company Rio Dell Feeder 352395524 Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves the installation of 2,800 feet of 16-inch high-density polyethylene conduit beneath the Eel River near Rio Dell, California, using two separate Horizontal Directional Drilling (HDD) operations—one eastern and one western—each spanning 1,400 feet. The work will be conducted using American Auger DD-330 and DD-200 HDD rigs, with pilot holes drilled from entry pits to exit pits using steerable drill stems and bentonite-based drilling fluids. At each end of the route, an 11-foot by 11-foot bell hole will be excavated to house drilling equipment and receive the reamer, which will enlarge the borehole as the HDPE casing is pulled through from the exit point. All activities are confined to previously disturbed areas within PG&E’s right-of-way or on private land, with no tree removal or vegetation clearing beyond light mowing required. Equipment staging and storage will be arranged to avoid any discharge into the river or riparian zones, and access will be maintained via existing routes. The bore will be drilled to a minimum of 50 feet below the riverbed, with all excavated pits to be properly backfilled and compacted upon completion. The contracting agency is the California State Lands Commission, with environmental oversight provided by the California Department of Fish and Wildlife, which has approved the project under a Mitigated Negative Declaration pursuant to the California Environmental Quality Act (CEQA). No formal contract value, payment details, invoicing procedures, or clauses under the Federal Acquisition Regulation are specified in the documentation, and there are no identified evaluation factors, delivery schedules, or performance incentives. No contract clauses, representations, certifications, or special requirements such as security clearances or organizational conflict of interest provisions are included. The project lacks standard procurement elements typically found in federal solicitations, such as CLINs, solicitation numbers, or submission instructions, and is structured as a forecast notice with descriptive specifications only. Key equipment includes HDD rigs, a backhoe, excavator, vacuum truck, mud recycling unit, pressure washer, and Vec-loader, all to be operated in accordance with CEQA compliance and environmental protection measures to prevent contamination of the Eel River and its surrounding ecosystem.

General Info

Install 2,800 feet of 16-inch HDPE conduit under Eel River via two HDD operations with strict environmental protections.

Agency

California State Lands Commission

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Rio Dell, CA

Set-Aside

NONE

Documents

(1)

EPIMS-HUM-60863-R1C Notice of Determination for Rio Dell Feeder Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia State Lands Commission
Contacts2 people available
OfficeN/A
Organization / Agency
California State Lands Commission
Office AddressN/A
Contacts
Jonathan HollisEnvironmental Scientist

Full Description

Show more
The Project is limited to two borings (Eastern HDD and Western HDD), each of which will facilitate the installation of 1,400 feet of underground conduit for 12kV transmission lines under the Eel River using Horizontal Directional Drilling (HDD) methods. Specialized drilling machines (American Auger DD-330 and DD-200 HDD Rigs) will be used to directionally bore the conduit along a subsurface path. HDD activities will involve the use of Work Areas established to the north and south of the river channel. These areas will require light vegetation mowing; no tree trimming or removal will be required. One working area will contain an entry pit and drilling equipment, while the other working area will contain the exit pit. In this case, two 11-foot by 11-foot bell holes will be excavated, one at each end of the planned underground route. At the entry pit, a steerable drill stem will be used to bore a pilot hole to the exit pit. A drill bit will be advanced, utilizing a bentonite-based drilling fluid with additives, until it reaches the receiving point. From the exit point a reamer will be affixed to the drilling pipe, enlarging the boring as the equipment is reversed for retrieval, concurrently pulling up 16-inch diameter high-density polyethylene casings through the enlarged boring under the Eel River. The bore pits will be filled and compacted after drilling is complete. Cover depth of the drill is anticipated to be a minimum of 50 feet beneath the streambed within the river channel. Materials, equipment, vehicle staging, and storage areas will be established within previously disturbed areas within PG&E’s right-of-way or on private lands. Staging and storage areas will be situated to avoid discharge to the river and riparian area. Worksite access will be established via pre-existing access routes. Equipment required to perform the work includes: a backhoe; and excavator; a primary/pullback HDD rig; a secondary/intersect HDD rig; a 5,000 gallon vacuum truck with at least 400 feet of 4-inch diameter suction hose and sufficient disposal containers; a Vec-loader; a 1,000-gallon vacuum tank with pressure washer; and a mud recycling unit.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Keystone Power Outage Repairs
Solicitation # keystone-power-outage-repairs
The Keystone Power Outage Repairs solicitation, issued by Adams & Associates Keystone Red Rock Job Corps, seeks a contractor to perform electrical infrastructure repairs at the Keystone Red Rock Job Corps Center in Drums, Pennsylvania. The scope of work involves repairing three damaged poles, specifically poles 35, 43, and 45. Key technical requirements include the installation of one 75 kva transformer on pole 35, one 100 kva transformer on pole 43, and a bank replacement on pole 45 consisting of one 100 kva and two 50 kva transformers. Additionally, the contractor must install new polymer cutouts and 10kv lightning arresters on poles 35 and 43, implement new service drops to buildings from all three poles, install a new secondary quadplex for the main trunk line, and handle the demolition and disposal of old secondary cables. Final deliverables include the verification of voltage and proper rotation within the buildings. This opportunity is a small business set-aside open to various categories, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, under NAICS code 237130. The response deadline is September 9, 2026. Compliance requirements are stringent, requiring offerors to be registered and active in SAM.gov and to provide certified payroll in accordance with Davis-Bacon wage standards. Bidders are specifically instructed to separate labor and materials costs within their proposals. The primary point of contact for this effort is Jennie Drumheller.
Adams & Associates Keystone Red Rock Job Corps

POSTED

about 8 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237130
New
Federal
SP-364 Replace Underground Cabling in SP Area
Solicitation # N4008526R0249
Solicitation N4008526R0249 is an 8(a) set-aside Indefinite Delivery/Indefinite Quantity contract issued by the Naval Facilities Engineering Systems Command Mid-Atlantic. The project, titled SP-364 Replace Underground Cabling in SP Area, involves replacing underground electrical cabling from SW 111 at SP-35 to manholes serving buildings SP-254, 257, 362, 364, and 366, as well as installing above-ground junction boxes near SP-254 and 257. Performance will take place at Naval Station Norfolk, Virginia, with a total completion period of 330 calendar days from the date of the task order award. Award will be granted to the eligible offeror submitting the lowest price based on the total sum of Contract Line Item 0001AA and the extensions of items 0001AB through 0001AE. The contractor must provide a project superintendent with at least 10 years of construction experience, including 5 years on projects of similar complexity, and a site-based Quality Control Manager. Key requirements include adherence to USACE EM 385-1-1 safety standards, the submission of a Government-approved Salvage Plan, and compliance with NETA ATS and various ASTM standards for electrical and materials testing. Invoicing is managed via Wide Area Work Flow (WAWF) using specific NAVFAC forms, and payments are governed by FAR 52.232-5 and FAR 52.232-27. Proposals must be submitted electronically through the PIEE Solicitation Module by September 7, 2026, at 1400 EDT.
Navfacsyscom Mid-Atlantic

POSTED

3 days ago

DEADLINE

in 3 days
View Details
NAICS: 237130
New
Federal
Feeder 7 Repair
Solicitation # W50S8526BA007
The U.S. Air Force, through the W7NF Uspfo Activity Miang 127, is preparing to issue an Invitation for Bids under solicitation number W50S85-26-B-A007 for the construction of Electrical Repair Feeder 7 at Selfridge Air National Guard Base in Michigan. This is a firm fixed-price contract entirely set aside for small businesses under FAR 19.5, with the NAICS code 237130 for Power and Communication Line and Related Structures, and a size standard of $45 million. The project requires the contractor to furnish all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary to complete approximately 5,706 feet of new underground and overhead conductors, demolition of existing cables, full-depth pavement repairs, mill/overlay, crack repairs, and associated site restoration work along Perimeter Road and Jefferson Ave. All work must strictly adhere to Drawings VGLZ262005 Repair Feeder #7, the Statement of Work, and project specifications, with any conflicts resolved in favor of the more stringent or higher-quality requirement. A Macomb County Soil Erosion Permit is mandatory and the responsibility of the contractor to obtain and pay for. The contract period is 240 calendar days from notice to proceed, inclusive of inspection and punch list items. The solicitation is being issued under FAR Part 14 procedures, with award determined solely on price and price-related factors. The prime contractor must comply with limitations on subcontracting, prohibiting payments exceeding 85 percent of the contract value (excluding materials) to non-similarly situated subcontractors under FAR clause 52.219-14(e)(3) with deviation 2021-O0008. All bidders must be registered in SAM.gov, and inquiries must be submitted in writing via email to TSgt Jack Garrettson. The formal solicitation is tentatively scheduled for release on July 13, 2026, with a pre-bid conference on July 22, 2026, and bid opening anticipated on or about August 31, 2026. The estimated contract value ranges between $1 million and $5 million, with the final amount to be determined upon bid submission.
W7NF Uspfo Activity Miang 127

POSTED

3 days ago

DEADLINE

in 9 days
View Details