Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Emergency and On-Call Technical Support

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

North Carolina → City of RaleighView Agency

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and MaintenanceView NAICS

Place of Performance

NC, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNorth Carolina → City of Raleigh
ContactsNo contacts available
OfficeN/A
Organization / Agency
North Carolina → City of Raleigh
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provide 24/7 emergency response for THP system failures, including diagnostics, urgent repairs, and system stabilization during non-shutdown periods.

Similar Contracts

Same NAICS industry code

NAICS: 811310
New
Federal
49--28007 EBFD PP AUTOMATIC GREASING SYSTEM
Solicitation # 140R4026Q0086
The contract solicitation 140R4026Q0086/0001, issued by the Bureau of Reclamation’s Upper Colorado Regional Office for an automatic greasing system at Elephant Butte Dam in New Mexico, seeks a firm fixed price solution for the installation of three systems servicing 330 lubrication points across turbine units during the restricted maintenance season from October 15 to February 15. Each system must be fully integrated with existing infrastructure, compatible with VSG Green grease, and equipped with automated controls capable of weekly and monthly lubrication cycles with manual override, alarm outputs, and shutoff valves. The contractor must demonstrate a minimum of five prior installations of wicket gate greasing systems, providing verifiable customer references, and must designate a certified safety representative trained in lockout/tagout procedures who will be present for all hazardous operations. All work must comply with OSHA, NEC70E, NFPA, and Reclamation Safety and Health Standards, with electrical power infrastructure—including 230VAC cabling, breakers, and disconnects—provided entirely by the contractor, as only 120VAC is available on-site. The solicitation mandates extensive documentation including as-built drawings in .dwg format, a commissioning plan, parts lists, warranty information, and previous experience records. Delivery is FOB destination at Elephant Butte Dam, with performance beginning September 1, 2026, and ending February 15, 2027. Payment must be submitted via the Treasury’s Invoice Processing Platform, requiring electronic submission with a signed copy emailed to Samantha Colt prior to IPP submission; reimbursement is tied to successful commissioning and acceptance at the worksite. Contractors must obtain all required permits through EBFD operations, manage waste disposal at their own expense, and adhere to strict aesthetic and safety labeling standards, including MIL-STD-129 for any radioactive components. Offerors must maintain active SAM registration with valid UEI and CAGE codes, self-certify small business status under NAICS 811310 with a $12.5 million size standard, and disclose any adverse legal or contractual history per FAR 52.209-7. Special requirements include prohibitions on contractor access to EBFD equipment, no on-site housing, and compliance with EPA BioPreferred guidelines. The evaluation prioritizes technical acceptability over price, with the lowest technically acceptable offer likely to be selected, though no formal LPTA
Upper Colorado Regional Office

POSTED

about 15 hours ago

DEADLINE

in 6 days
View Details

More opportunities from North Carolina → City of Raleigh

Same awarding agency

NAICS: 811310
New
SLED
Annual Thermal Hydrolysis Process (THP) Maintenance Shutdown – Neuse River Resource Recovery Facility
Solicitation # 274-5230-604-2026-THP
The contract requires a qualified firm to plan and execute the annual maintenance shutdown of the Cambi B6-4 Thermal Hydrolysis Process at the Neuse River Resource Recovery Facility in North Carolina. The selected contractor must deploy OEM-qualified personnel to safely take the system offline, perform thorough cleaning, inspection, preventive maintenance, and any authorized repairs, followed by a safe and efficient return to operational status. All work must be completed in accordance with safety protocols and industry standards to ensure system reliability and regulatory compliance. The scope is focused exclusively on the scheduled annual shutdown, with no assurance of additional work volume beyond this defined activity. The contractor may be called upon to provide emergency or on-call support services during the contract term if requested, though such services are not guaranteed and will be issued at the discretion of the facility. The solicitation, numbered 274-5230-604-2026-THP, was posted by the City of Raleigh on August 7, 2026, with responses due by September 8, 2026. The contract falls under a state and local government procurement through the North Carolina agency, and the primary point of contact is Lanee Edwards. There is no set-aside designation, and the work is performed at the facility location in North Carolina.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

about 22 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Design Build Services Forest Ridge Park Mountain Bike Trail
Solicitation # 274-PR-2026FRPMBT-DB
The City of Raleigh is seeking a qualified design-build team to deliver a 7.5-mile expansion of natural surface mountain bike trails at Forest Ridge Park under a qualifications-based selection process governed by North Carolina’s Mini-Brooks Act. The solicitation, identified as 274-PR-2026FRPMBT-DB, issued on August 6, 2026, with a deadline of September 11, 2026, requires proposers to demonstrate team experience, corporate background, project understanding, familiarity with the local area, and overall submittal quality through a scoring system that awards up to three points per evaluation factor, with no consideration of price in the selection decision. The contract will be structured in two phases: Phase 1 encompasses design, permitting, and environmental assessments, culminating in final design and budget reconciliation, while Phase 2 involves construction using primarily bench cut methods with some lift and tilt or turnpike techniques in flatter areas, all in alignment with IMBA guidelines and other trail development standards referenced in the 2023 Forest Ridge Bike Trails Extension Design Report. Performance standards are defined by the DBIA 535 Standard Form of General Conditions, modified to reflect North Carolina statutes including GS 143-128(f1), which mandates mediation for disputes exceeding $15,000, and N.C.G.S. 143-134.1(b2), which applies retainage provisions specifically to early-finishing subcontractors such as those handling structural steel, piling, or demolition. The Design-Builder must adhere to an approved QAQC Plan, develop an Acceptance Testing Plan in coordination with the City, and complete all work by a schedule defined after contract award, with substantial completion required by a specified date and final completion no later than 30 days thereafter. The proposer must submit a comprehensive package including a cover letter on official letterhead, corporate background details with three past project references, financial statements, and a separately sealed hourly rate schedule for all proposed personnel, alongside electronic and hard-copy submissions in PDF format on a flash drive. The City will negotiate contracts exclusively with the highest-ranked proposer, moving sequentially to the next if negotiations fail. All contractual commitments are governed by specific insurance requirements including $1 million each for workers’ compensation employer liability limits, $1 million combined single limit for automobile liability, and $2 million in general liability coverage for both aggregate and completed operations, along with mandatory performance and
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details