Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Federal Regional Center-1 LP-1001CA Antenna Maintenance

Active
WX03353Y2026TFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Homeland Security → Ms - Mission SupportView Agency

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

44780, MA, USA

Set-Aside

SBA

Documents

(3)

Wage+Determination+2015-4055.pdf

PDF

Maynard+RLP+Maintenance++_SOW_20260511_v1.pdf

PDF

2.2.1+RFQ_sam.gov+Package+Maynard+Antenna+repair+package.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseCombined Synopsis
Posted

Combined Synopsis

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Ms - Mission Support
Contacts1 person available
OfficeWashington, DC, 20472, USA
Organization / Agency
Department Of Homeland Security → Ms - Mission Support
View Agency Profile
Office AddressWashington, DC, 20472, USA
Contacts

Full Description

Show more

You are requested to provide firm-fixed pricing for the services specified in the Statement of Work (SOW). Funding has been obtained for this proposed procurement in an amount equal to or greater than the Independent Government Cost Estimate (IGCE). The Government requests pricing for the services listed in the SOW to be in effect for thirty (30) days after the date of your RFQ response. Award will be made to the lowest priced, technically acceptable proposal. The technical approach should not include prices. The price breakdown should be provided as a separate document. 

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Federal
Z2DA--519-20-200 VABS Replace Boiler Plant Solicitation 36C25726B0006The solicitation for the replacement of the boiler plant at the West Texas VAMC in Big Spring, Texas, under contract number 36C25726B0006, is a sealed-bid construction project issued by the Department of Veterans Affairs through its Network Contracting Office 17 in San Antonio, Texas. The solicitation, first posted on April 21, 2026, and amended four times through June 12, 2026, is structured as a Service-Disabled Veteran-Owned Small Business Set Aside under NAICS code 237130, with strict compliance required for subcontracting limits: no more than 85% of the government-paid contract amount (excluding materials) may be paid to non-certified subcontractors, with similar restrictions applying to special trade construction. Offerors must be certified SDVOSBs, registered in SAM.gov with an active UEI and CAGE code, and must affirmatively represent their socioeconomic status, with false certifications subject to criminal penalties under 18 U.S.C. § 1001. Proposals must be submitted as a single electronic PDF via email to Horacio.Fernandez@va.gov by the August 17, 2026, deadline, with no exceptions allowed for late submissions. The Government places sole responsibility on offerors to monitor SAM.gov for all amendments, clarifications, and updates, and failure to do so renders a bid non-responsive with no recourse for relief. The contract is awarded on a Lowest Price Technically Acceptable basis, meaning technical acceptability is determined but price is the only factor in selection. The scope encompasses complete demolition of the existing boiler plant and installation of new packaged fire-tube boilers, associated piping, fuel trains, feedwater and condensate systems, and all mechanical and electrical upgrades, while maintaining uninterrupted facility operations through temporary boiler support. Performance is subject to strict construction standards including VA Master Specifications, VHA Directive 1810, OSHA, ASTM, NFPA 99, and ICC codes. Acceptance occurs on-site with joint responsibilities between the contractor and Government, including factory and field inspections, commissioning, and operator training. Invoicing must be submitted exclusively through the VA EIPP system via Tungsten Network using X12 EDI format; paper, email, and fax submissions are prohibited. The contractor must also comply with VA-specific clauses on ICT accessibility, personnel vetting, and security prohibitions,
257-NETWORK Contract Office 17 (36C257)

POSTED

1 day ago

DEADLINE

in 27 days
View Details
NAICS: 237130
New
Federal
Solar Construction on New BuildingThis solicitation, numbered 1232SA26Q0880, is a combined synopsis and request for quotation for the installation of a new 12.47 kV solar array on the rooftop of an existing building at the Southwest Watershed Research Center in Tucson, Arizona, with associated patch and repair work to the roof membrane. The procurement is structured as a Total Small Business Set-Aside under NAICS code 237130, with a small business size standard of $45 million, and is open only to responsible small business concerns. The contract will be awarded using the Lowest Priced Technically Acceptable methodology, with technical acceptability, past performance, submission completeness, and amendment acknowledgment serving as mandatory pass/fail gates. Failure to meet any of these criteria renders an offer non-responsive. The scope includes full electrical installation to the existing transformer, project management, quality control, and compliance with stringent environmental, safety, and labor standards. All materials must be delivered in unopened manufacturer-sealed containers with clear labeling, and equipment must be affixed with official manufacturer nameplates—not those of distributors—while field-fabricated nameplates must adhere to specific ASTM D709 standards for thickness, finish, and lettering. Performance is expected over a 200-calendar-day period from the Notice to Proceed, with final acceptance contingent on successful punch-out, pre-final, and final inspections attended by designated contractor and government personnel. The offeror must submit an SF 1442, a summary cover letter with SAM UEI and TIN, and all attachments, including the Statement of Work, project specifications, PV drawings, a pricing schedule, and the applicable wage determination for Arizona. Compliance with labor standards is mandatory under the Davis-Bacon Act, requiring certified payroll records and adherence to the AZ20260040 wage determination. The Contractor must also maintain an on-site superintendent with five years of relevant experience and familiarity with EM 385-1-1 safety protocols, appoint a formally designated Site Safety and Health Officer, and submit a Site-Specific Safety Plan within ten days of award. Insurance and performance and payment bonds as required by FAR 52.228-15 are mandatory, and bid bonds using SF 24 from a Treasury-listed surety are required due to the project’s value exceeding $35,000. All pricing must remain firm for 90 days post-submission deadline, and invoices must
USDA Ars Afm Apd

POSTED

1 day ago

DEADLINE

in 3 days
View Details
NAICS: 237130
New
Federal
Luke AFB AUX Airfield ModernizationThe Department of the Air Force, through the 56 Contracting Squadron at Luke Air Force Base, Arizona, is soliciting proposals for the modernization of the Luke Auxiliary Airfield under solicitation number FA488726R0011. This procurement is a total small business set-aside for SBA-certified Women-Owned Small Businesses (WOSB), and only contractors with active SAM registration and current WOSB certification are eligible to respond. The work involves engineering, furnishing, installing, and testing the replacement of outdated channel banks and new fiber optic cable installation at the auxiliary airfield, with a performance period of 180 calendar days commencing upon receipt of the Notice to Proceed. All work must adhere to strict technical specifications outlined in multiple attachments including the Statement of Work, Luke Master Specifications, DAFMAN 91-203, and industry standards such as TIA-568-C, NFPA 70, and OSHA 29 CFR 1910.268. Contractors are required to comply with safety standards per EM 385-1-1, including having a Site Safety and Health Officer on-site at all times with authority to halt operations, and must submit critical lift plans, confined space permits, monthly exposure reports, and comprehensive documentation including as-built drawings, operation and maintenance manuals, and manufacturer certifications. Proposals must be submitted electronically no later than 31 July 2026 at 2:00 PM MST via DoD SAFE or email to the designated points of contact. Proposals must be structured into three clearly labeled volumes: Technical (maximum 15 pages), Past Performance (maximum 20 pages plus a one-page teaming letter), and Price (including all required SF 1442 forms), with strict formatting guidelines including 12-point font, single spacing, and one-inch margins. Evaluation will follow a Performance Price Tradeoff method, where offers must first achieve at least an Acceptable technical rating and Neutral Confidence or better in past performance to be considered; award will be made to the most advantageous offer based on the combined value of technical excellence, past performance, and price. Site visits are scheduled for 9 July 2026 with no base access restrictions, and any RFIs must be submitted by 12:00 PM MST on 17 July 2026 using the prescribed RFI Log. Payment will be processed through Wide Area WorkFlow
FA4887 56 Cons Cc

POSTED

1 day ago

DEADLINE

in 10 days
View Details
NAICS: 237130
New
SLED
Packaged SubstationPublic Utility District No. 1 of Lewis County is soliciting bids for a packaged substation including all associated equipment and delivery as specified in Exhibit C, with the project scoped for Phase 1 only and requiring the entire system to fit within a 294'x144' fence while complying with NESC code and referencing design standards JH-E-100 and JH-C-101 to 110. The substation must include transmission and distribution equipment such as circuit breakers, potential transformers, disconnect switches, bus conductors, insulators, ground grid, conduit, control enclosure, and foundation designs for all steel structures. Deliverables are split into two shipping packages: Package 1 containing anchor bolts, templates, and foundation drawings must be delivered by April 30, 2027, to 124 Habein Rd, Chehalis, WA, and Package 2 with steel structures, pipe bus, switches, and components by July 16, 2027, to 2844 Jackson Hwy, Chehalis, WA, with final delivery of the complete system required on or before February 2028. All equipment must be packaged to prevent damage, labeled with the purchase order number on every document and container, accompanied by packing lists and MSDS for hazardous materials, and shipped F.O.B. destination with risk of loss transferring upon district acceptance. Bids must be submitted by August 4, 2026, in sealed physical form to 321 N.W. Pacific Avenue, Chehalis, WA, via the procurement system, with electronic submissions allowed only through the portal and no faxes, emails, or informal quotes accepted. The solicitation requires submission of the vendor bid form, detailed bid data spreadsheet, and optional alternates on separate sheets. For bids totaling $120,000 or more, a bid guarantee of five percent of the bid amount is required, and awardees must furnish a ten percent performance bond within ten business days, acceptable as certified check, cashier’s check, irrevocable letter of credit, performance bond, or savings account assignment issued by a Washington-admitted insurer with a Best’s Rating of A-, Class VII or better. The contractor must maintain general liability insurance of $1,000,000 per occurrence and $2,000,000 general aggregate, workers’ compensation as required by law, and automobile
Public Utility District No. 1 of Lewis County

POSTED

4 days ago

DEADLINE

in 29 days
View Details
NAICS: 237130
New
SLED
IFB 2026-01 Fork Union Community Center Generator ProjectThe Offeror is responsible for delivering a complete turnkey solution for the Transitional Shelter generator project at the Fork Union Community Center in Virginia, encompassing all labor, materials, equipment, and services required from procurement to final commissioning. This includes ordering and delivering the generator, pouring and preparing a concrete pad, securing all necessary building code inspections, coordinating Dominion Power downtime, excavating and trenching for electrical conduits, burying and protecting wiring, restoring the site with seeding and recovery, terminating all electrical connections, and performing comprehensive testing to ensure full operational functionality. The Offeror must also provide hands-on operational training for Fluvanna County staff to ensure proper and safe use of the system. All work must be completed in accordance with local and state regulations, including compliance with VA 811 utility location requirements and proper coordination with utility providers. The solicitation, identified as IFB-2026-01 with reference number IFB-124625, was posted on July 17, 2026, and responses are due by August 4, 2026. The project is managed by Fluvanna County through the Virginia state government, with Linda Mills as the point of contact for inquiries. Performance is required at the Fork Union Community Center located at 5725 James Madison Highway, Fork Union, VA 23055, and the successful bidder must be prepared to manage every aspect of the project from start to finish with full accountability for timelines, quality, and regulatory compliance.
Fluvanna County

POSTED

4 days ago

DEADLINE

in 14 days
View Details