Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on July 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Install New FOC from ITB 910 to ITB 1365

Closed
FA488726R0008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work requires the contractor to provide all labor, supervision, equipment, and miscellaneous materials to replace all structures, conductors, shield wires, and hardware. Key technical deliverables include the installation of 28 wood H-Frame tangent structures and one tubular steel monopole dead-end on a drilled pier, upgrading the conductor to 954 kcmil 45/7 ASCR Rail, and installing 0.551 diameter fiber optic ground wire and EHS steel shield wire. The project also involves tree clearing, site preparation, and the removal of existing structures and conductors. Bids are due by 2:00 p.m. CST on December 2, 2026, and must be submitted as sealed hard copies to the Procurement Department in Columbus, Nebraska. The award will be based on the lowest cost and best bid, with evaluation factors including technical conformance, schedule capability, financial standing, and past performance history. Prospective bidders are encouraged to attend an optional pre-bid teleconference and site visit on November 23, 2026. Required submission documents include a signed proposal page, a completed price quotation table, a W-9 form, and bid security in the form of a certified check, irrevocable letter of credit, or bid bond. The successful contractor must provide a performance bond and maintain workers compensation and commercial general liability insurance.
Nebraska Public Power District

POSTED

about 13 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

2 days ago

DEADLINE

in 14 days
NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers, Chicago District, is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified small business contractors for the turnkey removal and replacement of two utility feed transformers at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois. The project involves the removal and disposal of two existing 4,000/5,000 kVA transformers and the installation, testing, and commissioning of two new operational replacements. The contractor will be responsible for all labor, materials, equipment, rigging, and supervision, while existing concrete pads, cabling, and switchgear will be reused. The estimated magnitude of construction is between 500,000 and 1,000,000 dollars, with an estimated project schedule of 365 calendar days. Interested firms must demonstrate technical capabilities in medium-voltage electrical work, including pre-energization electrical acceptance testing in accordance with NETA ATS and IEEE C57 standards. Key requirements include the ability to supply biobased dielectric insulating fluid and steel enclosures with recovered materials, as well as strict adherence to USACE EM 385-1-1 and NFPA 70E safety standards. Applicants must provide their small business status under NAICS code 237130, proof of bonding capacity, and up to three relevant project examples from the last five years. Responses, which should not include price quotes, are due by November 5, 2026, and must be submitted using the provided response template.
W072 Endist Chicago

POSTED

2 days ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The Department of the Air Force, through the 56 Contracting Squadron, is soliciting proposals under solicitation number FA488726R0008 for the installation of new fiber optic cable from Information Transfer Building 910 to ITB 1365 at Luke Air Force Base, Arizona. This procurement is a Women-Owned Small Business (WOSB) set-aside, exclusively limited to contractors certified by the SBA as WOSBs, and all offerors must be actively registered in the System for Award Management (SAM) with a valid Unique Entity ID. The solicitation has been amended once, extending the proposal submission deadline from June 30, 2026, to July 13, 2026, at 2:00 PM MST, with a second amendment expected to include responses to RFIs and other updates. A mandatory site visit occurred on June 9, 2026, requiring all visitors to meet at the South Gate Visitors Center at 8:00 AM with REAL-ID compliant identification or two forms of unexpired alternative ID for base access. RFIs were due by June 15, 2026, using the approved RFI Log format, and late submissions will not be considered. Proposals must be submitted electronically via email or DoD SAFE and must be organized into three separate volumes: Volume I (Technical) capped at 15 pages, Volume II (Past Performance) at 20 pages plus one additional page for teaming letters, and Volume III (Price) containing only pricing information. Technical proposals must demonstrate understanding of the Statement of Work, including compliance with NFPA 13, TIA, UFC, OSHA, and other applicable standards, and must include a detailed Construction Work Plan, Quality Control Plan, and schedule. Past performance will be evaluated based on relevancy, recency, and an Integrated Performance Confidence Assessment, with at least Neutral Confidence required for eligibility. Pricing is assessed for realism, reasonableness, and balance. The evaluation is a Performance Price Tradeoff (PPT) acquisition, not LPTA, allowing award to a higher-priced offeror if superior technical merit or past performance justifies it. The contract type is Firm Fixed Price, with a performance period of 180 calendar days following the Notice to Proceed. Delivery is F.O.B. Destination at Luke AFB, with final inspection and acceptance occurring at that location. The contractor must comply with

General Info

Air Force seeks WOSB for firm fixed-price fiber optic cable installation, proposals due June 29, 2026.

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

Luke Air Force Base, AZ, 85309, USA

Set-Aside

WOSB

Documents

17

AETC First 400 Feet Standard Guidance dated 5 May 2015

PDF, High priority: read this firstspecifications
High

Amendment 0001 to Solicitation FA488726R0008

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation FA488726R00080002

PDF, High priority: read this firstamendment
High

Consolidated RFI Log - Gov Responses - Solicitation FA488726R0008

XLSX, High priority: read this firstrfi
High

Luke Air Force Base Master Specifications dated 7 Mar 25

PDF, High priority: read this firstspecifications
High

Past Performance Questionnaire for Solicitation FA488726R0008

DOCX, High priority: read this firstpast-performance
High

Section L - Instructions, Conditions, and Notices to Offerors

PDF, High priority: read this firstinstructions
High

Section L - Instructions, Conditions, and Notices to Offerors - Solicitation 24 Jun 26

PDF, High priority: read this firstinstructions
High

Section M - Evaluation Criteria for Award

PDF, High priority: read this firstevaluation-factors
High

Solicitation FA488726R0008 - Install New FOC at Luke AFB

PDF, High priority: read this firstrfp
High

SOW for New Fiber Optic Cable Installation from ITB910 to ITB1365 at Luke AFB

PDF, High priority: read this firstsow
High

SOW for New Fiber Optic Cable Installation from ITB910 to ITB1365 Luke AFB

PDF, High priority: read this firstsow
High

Wage Determination AZ20260039 dated 18 May 2026

PDF, High priority: read this firstwage-determination
High

Anti-Terrorism Pamphlet - Force Protection Guidance - 5 Jan 2023

PDF, Low prioritypamphlet
Low

Attachment 8 - RFI Log for Solicitation FA488726R0008

XLSX, Low priorityrfi-log
Low

Department of the Air Force Manual 91-203 Safety Standards Feb 2026

PDF, Low prioritymanual
Low

Limited Asbestos Survey Report for Luke AFB Building 1365 dated 20 Feb 2026

PDF, Low priorityenvironmental-survey-report
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Jun 30, 2026 to Jul 13, 2026. The notice description changed.

Notice updated

Response deadline changed from Jul 13, 2026 to Jul 27, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4887 56 Cons Cc
Contacts2 people available
OfficeLUKE AFB, AZ, 85309-1217, USA
Office AddressLUKE AFB, AZ, 85309-1217, USA

Full Description

Show more

******************** Amendment 0002 Issued on 10 July 2026 **************


The purpose of Amendment 0002 is to add the updated SOW, Consolidated RFI Log with Government Responses, and the updated Section L Instructions, Conditions, and Notices to Offerors. Additionally, this amendment extends the proposal due date by 14 calendar days from 13 July 2026 by 02:00pm MST to no later than 27 July 2026 by 10:00am MST.


*********************************************************************************


******************** Amendment 0001 Issued on 26 June 2026 **************


The purpose of Amendment 0001 is to extend the proposal due date by 13 calendar days from 30 June 2026 to no later than 13 July 2026 by 02:00pm MST due to the final review of RFIs.


Please note another amendment will be issued with answers to RFIs and any other updates to the solicitation.


*********************************************************************************



The Department of the Air Force, 56 Contracting Squadron, is solicitating a request for proposal for Install New Fiber Optic Cable (FOC) from Information Transfer Building (ITB) 910 to ITB 1365 at Luke Air Force Base, Arizona. Please reference the documents attached to this RFP which provide all details of the required work to be performed.


A site visit is scheduled for Tuesday 9 June 2026 at 0900am MST (Arizona does not participate in daylight savings time). Any personnel needing base passes should meet at the South Gate Visitors Center at 0800 with a REAL-ID compliant ID or 2 forms of unexpired acceptable alternative identification.


RFIs are due to the Points of Contact by 1200pm MST on 15 June 2026 using Attachment 8 - RFI Log, attached to this solicitation notice. Any RFIs submitted after this deadline may not be considered for response.


Proposals are due electronically to the Points of Contact for this solicitation no later than 30 June 2026 by 0200pm MST.


This procurement is an SBA CERTIFIED WOMEN OWNED SMALL BUSINESS (WOSB) SET ASIDE AND IS LIMITED TO SBA CERTIFIED WOSB. Contractors are required to be certified prior to contract award. All prospective contractors must be actively registered in the System for Award Management (SAM), in order to be eligible for an award.


Notice to Offeror(s): Funds are presently available for this effort. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.

More opportunities from Department Of Defense → FA4887 56 Cons Cc

Same awarding agency

NAICS: 335921
New
Federal
56 CS FOC to Flightline and Wx Equipment, Luke AFB
Solicitation # F3YCFA6173AC01
Solicitation F3YCFA6173AC01 is a firm-fixed-price requirement for the engineering, furnishing, installation, and testing of new 12-strand single-mode fiber optic cable at Luke Air Force Base, Arizona. The project involves connecting various critical facilities, including Radar Approach Control, the Air Traffic Control Tower, Base Operations, the Command Post, and several meteorological and navigation stations. The scope includes the installation of 13 fiber optic distribution panels, the replacement of TC Communications equipment, and the provision of UPS and training. Work will utilize a combination of existing manhole/handhole duct systems and direct burial, with the latter requiring a minimum depth of 36 inches or the manufacturer's specification. This requirement is set aside 100% for SBA Certified Women-Owned Small Businesses under NAICS code 335921. The contract performance period is not to exceed 180 calendar days, with a target completion date of July 1, 2027, and a requirement to finish all facets within 120 days of award. Award will be based on the lowest priced, technically acceptable quote, evaluated through technical subfactors including installation design and a quality control plan, as well as past performance via the Supplier Performance Risk System. Contractors must be certified telecommunications professionals and adhere to strict environmental and security guidelines, including the submission of an OPSEC plan and compliance with Luke AFB environmental standards. A mandatory site visit is scheduled for November 4, 2026, and final offers are due by November 9, 2026.
Fiber Optic Cable Manufacturing

POSTED

about 22 hours ago

DEADLINE

in 11 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS