Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Energy was posted on June 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Shiprock-Vernal-Hayden Substation HVAC

Closed
89503226RWA000025Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 9 hours ago

DEADLINE

in 17 days
NAICS: 237130
New
Federal
Power Construction and Services II (PCS II) MATOC
Solicitation # W912BU26RA032
The US Army Corps of Engineers, Philadelphia District, intends to issue a Request for Proposal for the Power Construction and Services II (PCS II) Multiple-Award Task Order Contract (MATOC). This firm-fixed-price IDIQ contract will support power construction and services in contingency or austere environments for the US Government, Coalition Forces, and Host-Nation Governments. The scope of work covers the United States Central Command Area of Responsibility (CENTCOM AOR) and select European Command (EUCOM) countries, including Ukraine, Poland, Romania, Bulgaria, Kosovo, Bosnia, Norway, Turkey, Slovakia, and Greenland. The contract will have a total shared capacity of 249,000,000 dollars, with a target of three to seven awards to a pool of contractors who will then compete for individual task orders. The contract features a five-year ordering period with a six-month extension option under FAR 52.217-8. Task orders may include the construction of low and medium voltage electrical systems for power plants and distribution, as well as power-as-a-service activities such as assessing power needs, operating and maintaining generator sets, and providing technical training. This is a full and open competition under NAICS 237130, and awards will be based on a Best Value Trade-off process evaluating technical approach, past performance, and price. The solicitation is expected to be issued around September 14, 2026, via SAM.gov and the PIEE Solicitation Module, with proposals due at least 30 days after issuance.
W2SD Endist Philadelphia

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 237130
New
Federal
CJAG Underground Utilities Construction
Solicitation # W9136426QA076
Solicitation W91364-26-Q-A076 is a 100% small business set-aside for the construction of underground utilities at the Load Line 6 area of Camp James A. Garfield Joint Training Center in Ravenna, Ohio. The project, valued between $500,000 and $1,000,000, involves the installation of approximately 9,900 linear feet of open-cut trenching, 60 linear feet of dual-wall fuel lines with four termination points, and 500 linear feet of grounding rods. The scope also includes electrical and communications conduit routes, concrete-encased roadway crossings, pull boxes, backfill, compaction, and stone-road restoration. All work must be completed within a 60-day period of performance following the notice to proceed. The government will award a firm-fixed-price purchase order based on a best-value determination, evaluating quotations for technical acceptability, relevant past performance in medium-voltage electrical or distribution infrastructure, and price reasonableness. Offerors must provide a bid guarantee with their submission and are required to furnish performance and payment bonds within 10 days of receiving the order. Key deliverables include a Quality Control Plan due within 10 days of award, material submittals, and final as-built documentation. Quotations are due by September 24, 2026, at 10:00 AM EDT, and must be submitted electronically to the designated point of contact.
W7NU Uspfo Activity Oh Arng

POSTED

1 day ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract involves the replacement of HVAC systems at three Western Area Power Administration (WAPA) substations: Hayden in Routt County, Colorado; Vernal in Uintah County, Utah; and Shiprock in San Juan County, New Mexico. Work includes the removal of existing units and installation of new systems—mini-split systems at Shiprock, and heat pumps with air handlers at Vernal and Hayden—along with proper disposal of decommissioned equipment. All work must be completed within 365 calendar days from the Notice to Proceed, which is expected approximately 10 days after contract award, resulting in a total performance period of about 375 days. Work is restricted to existing access routes with no new road construction or maintenance permitted, and all activities must comply with the WAPA Construction Standards (March 2021), DOE-C-2001, and relevant FAR clauses, particularly pertaining to construction inspections, labor standards, and environmental protection. Site visits are scheduled for July 15–16, 2026, with a mandatory RSVP deadline of July 13, 2026. The solicitation is issued as a sealed bid under a Firm-Fixed-Price contract structure, with an estimated value between $100,000 and $250,000. Offerors must submit a single consolidated PDF proposal via email to the Contracting Officer by 1400 local time on July 29, 2026, and are required to bid on all three locations as a single, all-or-none award. No discussions will be held, and award may be made to a non-lowest bidder based on technical merit. The contract mandates compliance with federal labor standards including Davis-Bacon wage requirements, apprenticeship regulations, and equal opportunity provisions, along with strict adherence to safety and health protocols for high-risk environments. Invoicing must be submitted electronically through the Invoice Processing Platform (IPP), and no paper submissions are accepted. The Contracting Officer’s Representative, Adam Haun, will oversee performance, while John Pratt serves as the Contracting Officer. Offerors must provide their Unique Entity Identifier and CAGE code and self-certify small business status or other socioeconomic designations, while also disclosing any use of covered telecommunications equipment. Additional requirements include adherence to sustainable acquisition practices, anti-discrimination laws, supply chain risk mitigation, and reporting obligations for fraud or whistleblower activities. All contract deliverables must conform to detailed specifications and drawings referenced in the

General Info

Replace HVAC systems at three substations in Colorado, Utah, and New Mexico under strict site access and environmental constraints.

Agency

Department Of Energy → Western Rocky Mountain RegionView Agency

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(8)

Wage Determination UT20260077 Uintah County Building Construction 05/18/2026

PDFwage-determination

Attch B. SHR-VNL-HDN HVAC Construction Drawings

PDFconstruction-drawings

Wage Determination CO20260001 for Routt County, CO Building Construction

PDFwage-determination

RFQ 89503226RWA000025 Shiprock-Vernal-Hayden Substation HVAC

PDFrfq

Wage Determination NM20260046 San Juan County NM Building Construction 05/18/2026

PDFwage-determination

RFQ 89503226RWA000025 Shiprock-Vernal-Hayden Substation HVAC

PDFrfq

WAPA HVAC System Replacements Categorical Exclusion Determination

PDFcategorical-exclusion-determination

Shiprock-Vernal-Hayden HVAC Project Specifications

PDFspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Western Rocky Mountain Region
Contacts1 person available
OfficeLoveland, CO, 80539-8986, USA
Organization / Agency
Department Of Energy → Western Rocky Mountain Region
View Agency Profile
Office AddressLoveland, CO, 80539-8986, USA
Contacts
John PrattContracting Officer

Full Description

Show more
Shiprock-Vernal-Hayden Substation HVAC - replace the heating, ventilation, and air conditioning (HVAC) systems in the garage and service buildings at Hayden Substation in Routt County, Colorado; in the microwave building within the confines of Shiprock Substation in San Juan County, New Mexico; and in the service building within the confines of Vernal Substation in Uintah County, Utah. Equipment used for the proposed action includes hand tools as well as any tools required for the refrigerant removal and addition. Work will be completed within the confines of WAPA’s Hayden and Vernal Substations on WAPA lands, and within the confines of WAPA’s Shiprock Substation on Bureau of Land Management-Farmington Field Office lands. The substations will be accessed by existing access routes; no access road maintenance or new road construction is authorized. Work may occur at any time prior to the expiration date.
RSVP - NLT 13 July 2026 [Must RSVP by this date if you plan to attend the site visits](RSVP email: Mr. David Case, case@wapa.gov and cc'd Mr. John Pratt, Contracting Officer, jpratt@wapa.gov) Hayden (HDN) - 15 July 2026, 1100 Vernal (VNL) - 15 July 2026, 1400 Shiprock (SHR) - 16 July 2026, 1500 Hayden Substation 38545 COUNTY ROAD 51B Hayden, CO 81639 Directions: From Steamboat Springs, Colorado, take U.S. Highway 40 (west) towards Hayden approximately 20 miles. Turn left (south) on County Road 51 (Yampa Valley Airport Road); go 1.2 miles. Turn left (east) on County Road 51 B (gravel road); continue 1.1 miles. Turn left (north) at the Hayden Substation. Vernal Substation 3236 E. HWY 40 Vernal, UT 84078 Directions: From Vernal, Utah, take U.S. Highway 40 (south) approximately 6 miles. Turn right (south) on gravel road. Vernal Communication Site is located on the south side of the highway. Shiprock Substation 317 RD 6893 Farmington, NM 87401 Directions: From Farmington, New Mexico, take Highway 64 (west) approximately 15 miles. Turn right (north) on County Road 6893 (access is about 1/4 mile east of the Waterflow Post Office). A small orange sign (Western Substation) indicates turn off. Go about 2 miles to Shiprock Communication Site (site is in the Shiprock Substation).

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS