Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Sources Sought opportunity from Department Of The Interior was posted on June 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Y--HAYDEN PEAK BUILDING REPLACEMENT AND GROUNDING SYSTEM

Closed
140L0626R0013Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 10 hours ago

DEADLINE

in 18 days
NAICS: 237130
New
SLED
FTTP-PHASE 4 -IFB 16
Solicitation # IFB 16
Shrewsbury Electric and Cable Operations (SELCO) is soliciting bids for the Fiber to the Premises (FTTP) Network Upgrade Phase 4 in Shrewsbury, Massachusetts. The project involves the installation of approximately 15 miles of single-mode aerial and underground fiber optic cable, including signal transmission laterals from the existing backbone ring to splitter cabinets and distribution laterals to public right-of-way access points. The scope of work encompasses fiber optic cable installation, splicing, and bi-directional testing, with specific technical requirements for fiber characterization and reporting using EXFO devices. The contract will be awarded to the lowest responsible and eligible bidder, requiring a 5% bid deposit and a payment bond for 100% of the total contract price. The project follows a strict performance timeline, with mobilization occurring within two weeks of the executed contract and full completion, including all deliverables and punch list items, required within 30 weeks. Compliance requirements include adherence to Massachusetts Prevailing Wage Laws, OSHA safety regulations, and the Massachusetts Anti-Discrimination Statute. Contractors must provide detailed close-out documentation, including as-built drawings and testing results, to receive final payment, as SELCO will withhold 25% of the total contract value until a final audit is completed. Bids are due by September 29, 2026, and must be submitted in sealed envelopes to the Town Manager's Office at Shrewsbury Town Hall.
SELCO1 - SELCO

POSTED

about 21 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The solicitation for the Hayden Peak Building Replacement and Grounding System, identified by solicitation number 140L0626R0013, seeks qualified contractors to construct a compliant radio communications facility at a remote site in Arizona. The scope includes delivery and installation of a prefabricated communications equipment shelter, electrical systems, grounding infrastructure, and associated cabling, all in accordance with Government-provided design drawings and industry standards such as Motorola R-56, NFPA 70, IEEE 81-2012, ANSI/ASSE Z359, and OSHA 29 CFR 1926 Subpart M. The work requires coordination with a Government-approved third-party inspector, submission of detailed test reports including ground resistance field data, and documentation of concealed work through photographs. All materials must be new, undamaged upon delivery, and properly labeled per specifications, with cable labels required to be white opaque with indelible black ink, wrapped around each end, and clearly indicating destination equipment and connector designators. Final acceptance is contingent upon successful on-site operational testing, resolution of all punch-list items, and approval by the Contracting Officer’s Technical Representative. Responses are due by July 14, 2026, at 2:00 PM Mountain Time and must be submitted electronically via a designated Microsoft form. The contracting office is located in Denver, Colorado, under the Bureau of Land Management, Department of the Interior, with Kassandra Hicks as the primary point of contact. The NAICS code 237130 indicates this is a construction project with a small business size standard of $45 million, and while market research suggests consideration for a small business or socioeconomic set-aside, no specific set-aside designation or offeror certifications are required at this solicitation stage. No contract value is provided, and no pricing, FOB terms, or payment details are included in the documentation, indicating that cost proposals may be submitted separately. The Government retains full authority over inspection, acceptance, and enforcement of compliance, with no formal FAR clauses, evaluation factors, or special contract requirements such as security clearances or OCI provisions identified in the solicitation. Deliverables must be submitted in specified electronic formats including PDF, Excel, MS Project, and image files, and all work must adhere to stringent quality and documentation standards without reference to military packaging or labeling specifications.

General Info

U.S. Department of Interior seeks contractor for Hayden Peak Building replacement and grounding system installation.

Agency

Department Of The Interior → National Operations CenterView Agency

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

CO

Set-Aside

NONE

Documents

(2)

Sources Sought Notice 140L0626R0013 Hayden Peak Building Replacement & Grounding System

PDFsources-sought

RI Cashe Technical Specifications Package - Arizona

PDFspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → National Operations Center
Contacts1 person available
OfficeDENVER, CO, 80225, USA
Organization / Agency
Department Of The Interior → National Operations Center
View Agency Profile
Office AddressDENVER, CO, 80225, USA

Full Description

Show more
HAYDEN PEAK BUILDING REPLACEMENT AND GROUNDING SYSTEM

More opportunities from Department Of The Interior → National Operations Center

Same awarding agency

NAICS: 513120
New
Federal
7A--Mine Software Cost and Bond Services and Training
Solicitation # 140L0626Q0024
The Department of the Interior's National Operations Center is soliciting a firm-fixed price commercial contract for subscription-based mine and mill cost estimation data, reclamation bond cost software, and professional technical training. The requirement is designed to support mining claim patent and validity examinations, bond adequacy confirmations, and land administration actions in compliance with the Mining Laws of the United States and other federal regulations. The scope includes the provision of regularly updated cost indices, labor and benefit rates, and historical cost data dating back to at least the year 2000, with quarterly updates for cost data and quarterly or semiannual updates for the bond cost program. Additionally, the contractor must provide online technical training in mining, geology, milling, metallurgy, and cost estimation, including a project plan to establish logins and training within 30 days of award. The period of performance is from September 25, 2026, to September 24, 2027. Award will be made based on best value, evaluating technical capability, price reasonableness, and prior experience, specifically requiring three references from projects of similar scope within the last five years. The solicitation is open to all qualified firms under NAICS code 513120 and is not set aside for small businesses. Quotes must be submitted to the contracting officer by September 16, 2026, and must include a completed price schedule for the Mine Cost Service, Sherpa Bonds Service, and EduMine Training.
Periodical Publishers

POSTED

about 14 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237990
New
Federal
Y--GARNET HILL RECREATION AREA CONSTRUCTION
Solicitation # 140L0626B0006
The Bureau of Land Management is soliciting bids for the Garnet Hill Recreation Area Construction project in White Pine County, Nevada, under solicitation 140L0626B0006. This total small business set-aside project, categorized under NAICS 237990, involves comprehensive infrastructure improvements to enhance recreational facilities while protecting natural resources. The scope of work includes the construction of upper and lower campgrounds with individual and group sites, the expansion of the Garnet Hill Main Trailhead with ADA accessible walkways and parking, and improvements to the Egan Crest Trailhead, which features a unique earthen berm with a minibike course. Key deliverables across these sites include the installation of double vault toilets, trash dumpsters, kiosks, signage, and road improvements. The contract is a firm-fixed-price award based on sealed bidding procedures per FAR Part 14, with the award granted to the responsible bidder offering the lowest evaluated price. The anticipated period of performance runs from October 2026 through December 31, 2027. Contractors must comply with Davis-Bacon Act prevailing wage rates for both building and heavy construction in White Pine County and are required to provide performance and payment bonds within ten days of the award. Technical requirements emphasize strict adherence to ASTM standards for concrete, masonry, and soil testing, and the contractor is responsible for hiring a qualified geotechnical firm for all required inspections. Bids must be submitted electronically in PDF and Excel formats, including a completed SF 1442 and a limitation on subcontracting worksheet.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
Federal
Z--GAOA VALE DISTRICT OFFICE BUILDING RENOVATIONS D-B
Solicitation # 140L0626R0009
Solicitation 140L0626R0009 is a total small business set-aside for a firm-fixed-price, design-build construction project to renovate and expand the Bureau of Land Management Vale District Office in Malheur County, Oregon. The project involves the renovation of an existing 16,320 square foot single-story facility and the construction of a new 1,051 square foot addition. The estimated budget for the project is between 5.5 million and 6 million dollars. The contractor must commence work within 10 calendar days of the notice to proceed, with a total performance period of 720 calendar days. Key milestones include the delivery of final stamped construction documents by day 280 and final construction completion by day 700. The procurement follows a two-phase design-build selection procedure using a best value tradeoff process. Phase One evaluates offerors based on their general technical approach, team composition, experience, and past performance to select up to five firms for Phase Two. Phase Two evaluations focus on the design concept, schedule, key personnel, and price. The project must adhere to the 2024 International Building, Plumbing, and Mechanical Codes, ABA Accessibility Guidelines, and Department of the Interior office space utilization standards. The contractor is responsible for all quality control and must provide as-constructed drawings upon completion.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 7 days
View Details
NAICS: 238990
Federal
Y--SFO BUCK FIRE BAER FENCE
Solicitation # 140L3726Q0123
The Bureau of Land Management Socorro Field Office is soliciting quotations for the SFO Buck Fire BAER Fence project in Socorro County, New Mexico. This firm fixed price, single award contract is a total small business set-aside under NAICS 238990. The project involves the repair and reconstruction of six miles of livestock fence damaged by the Buck Fire in the Pelona Mountain Area. The scope of work is divided into two primary components: the complete removal and replacement of two miles of fence and the repair and maintenance of additional sections. Key deliverables include the installation of 4-wire fencing, wire gates, stress, corner, and end panels, and the creation of water-gaps for drainage. All fence posts must be metal, as wood posts are strictly prohibited, and materials must meet specific ASTM standards for zinc-coated steel. The contract will be awarded based on the lowest price to a responsible quoter who conforms to all solicitation requirements. Performance is expected to commence no later than February 2027 and must be completed by June 1, 2027, with an estimated duration of 90 days from the Notice to Proceed. Contractors must adhere to Department of Labor wage determinations for heavy construction in New Mexico and utilize domestic construction materials. Bidders are required to submit lump-sum pricing via Standard Form 18 and provide a bid guarantee. Final acceptance is contingent upon a successful inspection by the BLM COR/Project Inspector to ensure compliance with all technical specifications and drawings.
All Other Specialty Trade Contractors

POSTED

8 days ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS