Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on July 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Solicitation Notice: ERCIP Rock Island Arsenal Microgrid

Closed
W912QR26RA044Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

about 22 hours ago

DEADLINE

in 15 days
NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers, Chicago District, is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified small business contractors for the turnkey removal and replacement of two utility feed transformers at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois. The project involves the removal and disposal of two existing 4,000/5,000 kVA transformers and the installation, testing, and commissioning of two new operational replacements. The contractor will be responsible for all labor, materials, equipment, rigging, and supervision, while existing concrete pads, cabling, and switchgear will be reused. The estimated magnitude of construction is between 500,000 and 1,000,000 dollars, with an estimated project schedule of 365 calendar days. Interested firms must demonstrate technical capabilities in medium-voltage electrical work, including pre-energization electrical acceptance testing in accordance with NETA ATS and IEEE C57 standards. Key requirements include the ability to supply biobased dielectric insulating fluid and steel enclosures with recovered materials, as well as strict adherence to USACE EM 385-1-1 and NFPA 70E safety standards. Applicants must provide their small business status under NAICS code 237130, proof of bonding capacity, and up to three relevant project examples from the last five years. Responses, which should not include price quotes, are due by November 5, 2026, and must be submitted using the provided response template.
W072 Endist Chicago

POSTED

1 day ago

DEADLINE

in 8 days
NAICS: 237130
New
SLED
Wood Pole Inspection, Treatment, Repair, and UAV Inspection Services
Solicitation # 2026-RFP-0272
Solicitation 2026-RFP-0272 is a request for proposals from the City of Pasadena Water and Power Department to provide comprehensive wood pole inspection, treatment, repair, and UAV inspection services for its electric distribution system. The scope of work involves the maintenance and documentation of approximately 11,000 wood poles to ensure system reliability and compliance with CPUC General Orders 95 and 165. Key deliverables include georeferenced UAV reports, the identification of structural defects, and specific maintenance tasks such as the installation of trusses, guy guards, and pole tags. The contract is designed for an initial four-year term with two optional one-year extensions. Proposers must submit separate technical and price proposals via the City's eProcurement Portal by November 5, 2026. Evaluation is based on a points-based scoring system focusing on technical competence, safety practices, and experience, with specific 5-point preferences available for certified California small/micro-businesses or local Pasadena businesses. Mandatory requirements include FAA Part 107 certification for UAV operations, submission of Form AA-1 and AA-2, and a detailed quality assurance plan. Additionally, the contract prohibits the use of City data for training AI or machine learning models and requires strict adherence to ADA accessibility and prevailing wage laws.
Water & Power Department, Power Delivery

POSTED

2 days ago

DEADLINE

in 8 days
NAICS: 237130
New
SLED
2026-28 Electric Infrastructure Reconducts
Solicitation # 2026-28
The City of Covington, Georgia, is soliciting proposals under RFP #2026-28 for the reconduct of three-phase overhead utility lines across three separate projects. The scope of work includes Project 1 at Cornish Creek Newtonsboro Road, Project 2 at Elm and Reynold Streets, and Project 3 involving Eagle and Goldar General locations. The selected contractor will provide all labor, equipment, and coordination for the installation of poles, crossarms, conductors, and hardware, while the City will supply all materials. All work must be completed by May 31, 2027, and must adhere to first-quality workmanship and standard utility practices. Proposals must be submitted in sealed envelopes, including one USB drive copy, to the Covington Utility Complex by 10:00am on November 24, 2026. A mandatory pre-proposal meeting is scheduled for November 9, 2026. Submission requirements include a 5% bid bond, a non-collusion affidavit, and verification of compliance with the Illegal Immigration Reform and Enforcement Act of 2011. The awarded contractor must provide payment and performance bonds for 100% of the contract amount within ten days of notification and maintain comprehensive general liability, automobile liability, and worker's compensation insurance with limits of at least $1,000,000. Evaluation will be based on experience, personnel certifications, project approach, cost reasonableness, safety records, and references.
City of Covington

POSTED

2 days ago

DEADLINE

in 27 days
NAICS: 237130
New
SLED
Solar Streetlight Project – Phase 3
Solicitation # 8385
The Solar Streetlight Project – Phase 3 (C.I.P. No. 8385) is a solicitation by the City of Vista, California, for the receiving, storing, transporting, and installation of 125 solar streetlights. The scope of work includes the installation of galvanized steel and concrete light poles, solar modules, power centers, batteries, and luminaires. Comprehensive tasks involve excavation, concrete placement, pole erection, and the repair of any work-related damage to sidewalks, curbs, and utilities. The contractor is responsible for all labor, materials, and equipment, including hoisting and rental gear, traffic and parking control, public notifications, and the implementation of erosion and stormwater protection measures. All work must adhere to ADA standards for curb ramps and sidewalks and be performed during specified working hours, with lane closures restricted to 8:30 AM to 3:30 PM, Monday through Friday. The contract will be awarded to the lowest responsible bidder based on the total amount of Base Bid Items. To be eligible, bidders must possess the required licensure, provide proof of DIR registration per Section 1725.5 of the California Labor Code, and submit bids electronically via the OpenGov Procurement portal by November 25, 2026. Local business entities, as well as certified veteran-owned or disabled veteran business enterprises, may be eligible for specific preferences. Awarded contractors must provide performance and payment bonds, as well as workers' compensation insurance, within ten working days of the Notice of Intent to Award. Payment is processed via progress payments within 30 calendar days of receipt of a valid invoice, contingent upon the submission of certified payroll records and lien releases. Construction must commence within ten working days of the Notice to Proceed, with punchlist items to be completed within twenty working days of issuance.
City of Vista

POSTED

2 days ago

DEADLINE

in 28 days
NAICS: 237130
New
SLED
ON-CALL FIBER OPTIC INSTALLATION, FUSION SPLICING, TERMINATION, TESTING AND RELATED SERVICES
Solicitation # 26-032
The City of Carson is soliciting proposals under RFP #26-032 for qualified telecommunications firms to provide on-call fiber optic installation, fusion splicing, termination, testing, and related services for its municipal fiber optic network. The scope includes working on both new and existing infrastructure, with specific requirements for pulling cable and performing industry-standard testing, including power meter and bi-directional OTDR (1310/1550 nm). The City may award a single or multiple contracts with an anticipated term of five years. Performance standards are strict, requiring emergency onsite arrival within two hours and the start of splice work within four hours, while all test results and documentation must be submitted within two business days of assignment completion. Proposals must be submitted electronically via PlanetBids by November 12, 2026, at 2:00 PM PT. The evaluation process consists of a mandatory written proposal review, followed by optional interviews for high-ranking firms, with the award based on the best overall value in accordance with Carson Municipal Code. Selected contractors must adhere to a minimum local hiring requirement of 30 percent for employees and subcontractors. Financial security requirements include performance and payment bonds totaling 100 percent of the total compensation. Additionally, contractors must provide a detailed safety plan for any trench excavations five feet or deeper on projects exceeding 25,000 dollars and comply with all prevailing wage and insurance requirements.
City of Carson

POSTED

2 days ago

DEADLINE

in 15 days

AI Contract Overview

Show more

This solicitation, numbered W912QR26RA044, issued by the U.S. Army Corps of Engineers under the Department of Defense, seeks proposals for the Energy Resilience Conservation Investment Program (ERCIP) Microgrid and Power project at Rock Island Arsenal, Illinois. The project, classified as a Firm Fixed Price construction effort, is anticipated to be between $25 million and $100 million in value, with expectations at the upper end of that range, and falls under the NAICS code 237130 with a $45 million size standard. It is a Full and Open procurement utilizing a HUBZone price evaluation preference, with a mandatory pass/fail gate requiring at least 20% small business participation. The offeror must submit an electronic proposal via the Procurement Integrated Enterprise Environment (PIEE) by the revised deadline of July 8, 2026, at 1500 Eastern Daylight Time, with no paper, CD-ROM, or fax submissions permitted. Access to the restricted technical package—including drawings, specifications, and other controlled documents—is limited to firms with an active SAM registration and a current BASIC confidence level in the Supplier Performance Risk System (SPRS), with access granted only after direct verification by the contracting office via email. Compliance with Cybersecurity Maturity Model Certification (CMMC) Level 2 (Self) is a mandatory prerequisite for award, requiring each contractor and subcontractor information system that processes, stores, or transmits Federal Contract Information (FCI) or Controlled Unclassified Information (CUI) to maintain this certification in SPRS prior to contract award. The contract incorporates numerous FAR and DFARS clauses, including provisions for liquidated damages at $6,560 per calendar day of delay, anti-kickback and contingent fee restrictions, small business subcontracting requirements with Deviation 2026-O0038, and the use of the Contractor Compliance with CMMC clause. The government will evaluate proposals using a best value trade-off approach, where non-price factors, when combined, are considered approximately equal in importance to price, accounting for past performance, management plan, small business participation, and total offered price (including all options). The solicitation includes multiple options for additional construction work, each with specific exercise windows ranging from immediate award to within 120 days of award, with limitations on sequencing and frequency. Contractors must also comply with the Buy American Act, provide bid security and performance

General Info

$25-$100M ERCIP microgrid project at Rock Island Arsenal requires SAM, SPRS, CMMC Level 2 compliance.

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

IL, 61299, USA

Set-Aside

NONE

Documents

9

Amendment 0001 to Solicitation W912QR26RA044

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation W912QR26RA044

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation W912QR26RA044 for Microgrid Construction

PDF, High priority: read this firstamendment
High

J&A for SEL Power System Relays at Rock Island Arsenal

PDF, High priority: read this firstjustification-and-authorization
High

W912QR26RA044 - Rock Island Arsenal Power Generation and Microgrid IFB

PDF, High priority: read this firstifb
High

J&A for Simplex 4000 Series Fire Alarm Panel at Rock Island Arsenal

PDF, Low priorityjustification-and-authorization
Low

J&A for Sole Source Contract - Mid-American Natural Gas Utility Installation

PDF, Low priorityjustification-and-authorization
Low

Rock Island Arsenal Visitor Access Request Form June 2022

PDF, Low priority2 pages · other
Low

W912QR26RA044 Site Visit Attendance Sheets 06MAY2023

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

5 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 4, 2026 to Jun 18, 2026. The notice description changed.

Notice updated

Response deadline changed from Jun 18, 2026 to Jul 3, 2026. The notice description changed.

Notice updated

Response deadline changed from Jul 3, 2026 to Jul 8, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Louisville
Contacts1 person available
OfficeLOUISVILLE, KY, 40202-2230, USA
Office AddressLOUISVILLE, KY, 40202-2230, USA

Full Description

Show more

***02JULY2026: Amendment 0003 has been released in PIEE. The proposal due date has been extended until 08 July2026 at 1500 Eastern Daylight Time. 


***17JUNE2026: Amendment 0002 has been released in PIEE. The proposal due date has been extended until 03 July2026 at 1300 Eastern Daylight Time. 


***04JUNE2026: Amendment 0001 has been released in PIEE. The proposal due date has been extended until 18 June 2026 at 1500 Eastern Daylight Time. A redacted J&A is being posted to this notice an attachment. 


***12MAY2026 Update: The site visit sign-in sheet from 06 May 2026 is being posted as an attachment. 


SOLICITATION NOTICE: This is the solicitation notice for the Energy Resilience Conservation Investment Program (ERCIP) Rock Island Arsenal (RIA) Microgrid and Power project. The full solicitation is posted via the procurement Integrated Enterprise Environment (PIEE) Solicitation Module with restricted access.


The magnitude of this construction project is anticipated to be between $25 million and $100 million. The magnitude of this project is expected to be at the upper end of this range.


NAICS Code: 237130, Power and Communication Line and Related Structures Construction, which has a size standard of $45,000,000.


This is a Full and Open procurement with HUBZone price evaluation preference.


Please submit bidder inquiries through ProjNet. Instructions can be found in the attached solicitation under "Offeror's Questions and Comments."


***SITE VISIT: See Section 00 73 00 for the full Site Visit instructions and forms so your access can be processed. There will only be ONE site visit.***


*Please read below for instructions to access the technical package (Plans/Specificiations)*


Cybersecurity Maturity Model Certification (CMMC) and Access to Controlled Information


For information on CMMC, please reference: https://dodcio.defense.gov/CMMC/Documentation/


1. Purpose of this Notice

This notice is to inform industry of an active solicitation and to outline the mandatory prerequisites required to obtain the restricted solicitation package, including drawings and specifications. The information to be released is considered Controlled Unclassified Information (CUI) and/or Federal Contract Information (FCI).


2. Procedure to Obtain Restricted Solicitation Documents

This solicitation or its attachments contain Federal Contract Information (FCI) or Controlled Unclassified Information (CUI). Contractors requesting access to the FCI/CUI portions of the solicitation must have an active System for Award Management (SAM) Registration and a current BASIC confidence level in the Supplier Performance Risk System (SPRS) in order to receive access to the documents.


  • Step 1: Ensure your firm has an active SAM Registration.
  • Step 2: Ensure your firm has a current BASIC confidence level assessment posted in SPRS in accordance with DFARS clause 252.240-7997 and NIST SP 800-171.
  • Step 3: Request access to the restricted attachments by email to the following point of contacts with your company's information:
    • To: Jacob Pridemore and Bjorn Hale
    • Email: contact@example.gov and contact@example.gov
    • Subject: SPRS Verification for [Insert Solicitation Number or Project Name]
    • Body of Email: Include your company's CAGE Code and Unique Entity Identifier (UEI). Confirm that your firm has BASIC Confidence level in SPRS and this is accurately posted in SPRS.
  • Step 4: Upon Government confirmation of your SAM registration and SPRS Basic confidence level, access will be granted within PIEE.

3. Mandatory CMMC Requirement for Award


This solicitation requires the contractor and/or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI) or Controlled Unclassified Information (CUI), and requires the contractor and/or subcontractor(s) to comply with CMMC requirements.


The CMMC level required by this solicitation is CMMC Level 2 (Self).


This CMMC level, or higher (see 32 CFR part 170), is required prior to award for each contractor information system that will process, store, or transmit FCI or CUI during performance of the contract. In accordance with 252.204-7021 Compliance with the Cybersecurity Maturity Model Certification Level Requirements, contractors shall submit the CMMC UID(s) issued by SPRS for contractor information systems that will process, store, or transmit FCI or CUI during performance of the contract. 

*Important*: An offeror will not be eligible for award if they do not possess the required current CMMC status posted in SPRS prior to award as required by DFARS 252.204-7025 Notice of Cybersecurity Maturity Model Certification Level Requirements.

More opportunities from Department Of Defense → W072 Endist Louisville

Same awarding agency

NAICS: 237110
New
Federal
Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP)
Solicitation # W912QR27BA003
Solicitation W912QR27BA003 is a Design-Bid-Build project for the demolition and construction of the Axtel Wastewater Treatment Plant (WWTP) at Rough River Lake in McDaniels, Kentucky. The scope of work requires the contractor to remove the existing WWTP and fencing and install a new Aerobic Treatment Unit (ATU) and Drip Field System. This unrestricted procurement is estimated to have a construction magnitude between 1 million and 5 million dollars, with the award based on the lowest evaluated price. A 10 percent price evaluation preference will be applied to eligible HUBZone small business concerns. The contract is a Firm-Fixed-Price agreement under NAICS code 237110, with a total project duration of 400 calendar days from the Notice to Proceed. Performance is scheduled from December 18, 2026, to January 22, 2028, with a requirement to commence work within 10 calendar days of the notice. Key requirements include the submission of a Construction Quality Control (CQC) plan within 30 days of the notice to proceed, adherence to Davis-Bacon Act wage rates, and the provision of a Site Safety Health Officer. Liquidated damages for delays are set at 500 dollars per calendar day. Proposals must be submitted electronically via the PIEE Solicitation Module by the December 3, 2026, deadline.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Federal
Request for Information/Market Intelligence Notice: Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Fort Hunter-Liggett Water System Improvements
Solicitation # W912QR-PDB-FHLWATER
The U.S. Army Corps of Engineers, Louisville District, is seeking market intelligence through a Request for Information for the restoration and modernization of potable water and wastewater collection systems at Fort Hunter Liggett. With an estimated acquisition magnitude of 70 to 80 million dollars, the project scope includes the design and construction of a new tank farm with at least 2 million gallons of storage, a new transmission main, upgrades to water supply wells, modernized SCADA infrastructure, and the rehabilitation of sanitary sewer lines and treatment plant lagoons. All work must adhere to NSPC, UFC, and NFPA criteria to address aging infrastructure and operational deficiencies. The government is evaluating a Progressive Design Build strategy utilizing an Other Transaction Agreement under 10 U.S.C. section 2808a. This proposed approach would involve a qualifications-based selection process consisting of a statement of qualifications and pitch meetings. The award would be structured in two phases: an initial design and pre-construction phase followed by a construction phase based on an agreed-upon Guaranteed Maximum Price. Interested parties under NAICS code 237110 must submit their company profiles, collaborative delivery experience, and technical feedback via the designated online survey form by November 3, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS