Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

FFA Sierra Nevada Communications, FIBER 108 – Strawberry Summer Hill

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The FIBER 108 – Strawberry Summer Hill project, managed by Sierra Nevada Communications under the California Public Utilities Commission, will deploy approximately 5.07 miles of new fiber infrastructure, including 3.34 miles of underground fiber and 1.73 miles of aerial fiber, to connect unserved and underserved areas along Highway 108. The deployment includes underground vaults at key points such as the entrance to Peter Pam on Highway 108 and the start of the run from Cold Springs, with hand-holes installed every 600 feet along the underground trunk line extending from Strawberry School to the SNC head end. Though the project directly constructs only about five miles of new fiber, it serves as a critical link to over 12 miles of existing buried, aerial, and coaxial infrastructure, enabling service upgrades to 488 locations previously without adequate broadband. The high cost per mile—exceeding $270,000—is offset by an exceptionally low cost per connected location of under $3,000, making the investment highly efficient for expanding access. This initiative will deliver symmetrical 5,000/5,000 Mbps speeds to 162 unserved households and 632 unserved mass market locations, all of which are situated in low-income communities, fulfilling a strong commitment to environmental and social justice. Sierra Nevada Communications has pledged to offer a low-cost broadband plan compliant with D. 22-04-055, Section 3, and has committed to maintaining these prices for at least ten years, ensuring long-term affordability and accessibility. The project represents a targeted, infrastructure-driven solution that transforms connectivity for vulnerable populations while leveraging existing networks to maximize impact and cost-effectiveness.

General Info

Deploying 5.07 miles of fiber to connect 794 unserved low-income locations with 5Gbps symmetrical speeds for at least ten years.

Agency

California Public Utilities Commission

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Peter Pam on Highway 108, CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Public Utilities Commission
Contacts1 person available
OfficeN/A
Organization / Agency
California Public Utilities Commission
Office AddressN/A
Contacts
Lisa S CookePURA V CEQA Project Manager

Full Description

Show more
The FIBER 108 – Strawberry Summer Hill project, via Sierra Nevada Communications, will deploy the following amounts of last-mile fiber and four miles of middle mile fiber. It will include an underground vault to be installed for the MMBI at the entrance to Peter Pam on Highway 108. The underground run from the end of the SNC fiber trunk line at Cold Springs (near Mia's restaurant) will require a vault at the start of that run to receive aerial feed. From there, hand-holes will be installed every 600' of underground run down to Old Strawberry Road, down to the first pole on Old Strawberry Road and along the 1.78-mile underground fiber trunk from Strawberry School to the SNC head end. Approximately 3.34 miles of Underground fiber (66%) with approximately 1.73 miles of aerial fiber (34%) for a total of about 5.07 miles. These 5 miles of new fiber construction (with lengthy underground conduit trunk lines adding significant cost) actually links to another 12 miles of existing buried and existing aerial and coax to upgrade over 488 locations from unserved or underserved status. Accordingly, the cost per new fiber is high (over $270k/mile) but the cost per upgraded location is very low (under $3,000 per location). In addition to this project providing up to 5,000/5,000 Mbps will provide service to 162 Unserved Households. The project will serve 632 Unserved Locations for the Mass Market. The project will benefit disadvantaged or Environmental and Social Justice communities; 100 percent of the unserved locations are in low-income areas. Sierra Nevada Communications will provide a low-cost broadband plan that meets the requirements in D. 22-04-055, Section 3, and has committed to maintaining its prices for at least ten years.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
UTILITY & BACKUP POWER INDEPENDENCE, MISSION CONTROL STATION
Solicitation # utility-backup-power-independence-mission-control-station
The contract seeks small businesses to deliver comprehensive multi-disciplined support services for the construction and ongoing maintenance of an independent backup power plant at a facility in Colorado. The scope encompasses a wide range of critical systems including plumbing, HVAC, fire suppression, mechanical equipment and piping, electrical controls, telecommunications, fire alarm systems, lightning protection, cybersecurity, security escorts, and system commissioning, with a specific emphasis on generator infrastructure. All work is to be performed under a Small Business Set Aside, open exclusively to SBA-certified entities such as Small Businesses, Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone Small Businesses, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses. The NAICS code 237130 indicates this is a construction-related procurement focused on utility system installation. The solicitation was posted on August 10, 2026, with a mandatory response deadline of September 1, 2026. The contracting entity is BSGI-Weston JV, LLC, and all inquiries should be directed to Erica Vecchio, the primary point of contact, via email or phone. Performance is limited to Colorado, and the project is mission-critical, requiring integration of physical security, cyber protection, and operational reliability for a mission control station. Participation is restricted to certified small business concerns meeting specified SBA designations, and the contract aims to ensure long-term, self-sufficient power resilience through skilled, vetted small business partners.
BSGI-Weston JV, LLC

POSTED

about 7 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237130
New
Federal
ADOT SR303 EXTENSION PROJECT (LIBERTY ¿ LONE BUTTE, LIBERTY ¿ PHOENIX 230-kV TRANSMISSION LINE)The Western Area Power Administration, under the U.S. Department of Energy, has forecasted a future acquisition for the ADOT SR303 Extension Project, which involves the construction of a 230-kV transmission line spanning from Liberty to Lone Butte and from Liberty to Phoenix. This project falls under NAICS code 237130, indicating it is related to electric power transmission and distribution system construction. The anticipated work will support transmission infrastructure expansion to meet regional energy demands and enhance grid reliability. The contract is not yet solicited, with the forecast posted on August 10, 2026, and no solicitation number or set-aside details available at this time. The place of performance is located in Arizona, though specific city and zip details are not provided. Small business outreach is supported through two designated Small Business Program Managers, both reachable via email at tetrault@wapa.gov and setzel@wapa.gov, who are the primary contacts for inquiries and engagement. The project is part of broader efforts by the Department of Energy to modernize and expand the national power transmission network. No information is available regarding contract value, timeline, or anticipated award date, but the forecast suggests this opportunity is in the planning phase. Interested parties should monitor official DOE channels for the upcoming solicitation.
Western Area Power Administration

POSTED

about 13 hours ago

DEADLINE

N/A
View Details
NAICS: 237130
New
Federal
Tracy 500kV Substation Shunt Cap Breaker and Switch Replacement Bay T8The Western Area Power Administration, under the Department of Energy, has forecasted a procurement for the replacement of the shunt capacitor breaker and switch in Bay T8 at the Tracy 500kV Substation. This project involves the upgrade of critical high-voltage infrastructure to ensure continued reliability and operational efficiency of the transmission system. The work is classified under NAICS code 237130, indicating it falls within the electric power transmission and distribution construction sector, and will require specialized electrical and substation construction expertise. The contract is not yet solicited, with a posted date of August 10, 2026, suggesting it is in the planning phase ahead of a future competitive bidding process. Small business engagement is a key focus, as indicated by the designation of two Small Business Program Managers as primary points of contact, both reachable via email through the Western Area Power Administration. No specific set-aside type has been designated, and there is no information yet on the physical location of performance beyond the substation site in Tracy. The contract will likely demand adherence to strict safety and operational protocols typical of high-voltage substation work, and interested parties should monitor official channels for the eventual solicitation, as details on scope, timeline, and requirements will be formally released in a future procurement notice.
Western Area Power Administration

POSTED

about 13 hours ago

DEADLINE

N/A
View Details