Ironwood Transmission Line Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ironwood Transmission Line Project involves the construction, operation, and maintenance of an approximately 86-mile-long 500 kV overhead transmission line. The project will connect the APS North Gila Substation in Yuma County, Arizona, to the SDGE Imperial Valley Substation in Imperial County, California. The line will traverse a combination of private, state, and federal lands, including areas administered by the Bureau of Land Management. Major project components include the installation of transmission structures, foundations, conductors, fiber optic communication lines, and the development of both temporary and permanent access roads and staging sites. Construction activities will encompass vegetation clearing, grading, excavation, and conductor stringing, with temporary work areas restored upon completion. The project is led by the California Public Utilities Commission and is currently in the environmental review phase, adhering to CEQA and NEPA frameworks. Horizon West Transmission, LLC is the applicant responsible for project development. While the project is categorized as a forecast under NAICS code 237130, specific contract values, pricing, and formal procurement clauses are not provided. Key administrative contacts include Michelle Wilson of the CPUC and project management support from ECORP Consulting. The project is designed to integrate into the regional electrical grid to provide reliable power transmission capacity across the corridor.

General Info

Build 86-mile 500 kV transmission line from Arizona to California, crossing federal, state, and private lands.

Agency

California Public Utilities Commission

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(2)

Ironwood Transmission Line Project NOP/EIR Scoping Notice

PDFpresolicitation

Notice of Completion & Environmental Document Transmittal - Ironwood Transmission Line Project

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Public Utilities Commission
Contacts3 people available
OfficeN/A
Organization / Agency
California Public Utilities Commission
Office AddressN/A
Contacts
Michelle WilsonProgram and Project Supervisor
Ally LittleProject Manager
Anne SurdzialVice President - Director of CEQA/NEPA Services

Interested Companies (1)

Show more
ECORP Consulting
Redlands, CA

Full Description

Show more
The Project would involve construction, operation, and maintenance of a new approximately 86-mile-long 500 kV transmission line extending between the APS North Gila Substation in western Yuma County, Arizona and SDGE's Imperial Valley Substation in Imperial County, California. The Project would traverse a combination of federal, state, and private lands, including lands administered by the BLM. Major Project components would include installation of new overhead 500 kV transmission line facilities, transmission structures and foundations, conductor and fiber optic communication lines, temporary and permanent access roads, staging and pulling sites, work areas, and associated improvements and infrastructure necessary to support construction, operation, and maintenance of the transmission line. Construction activities would include vegetation clearing, grading, excavation, foundation installation, structure assembly, conductor stringing, and related activities. The Project would also include use and improvement of existing access routes and development of temporary work areas and staging areas to support construction activities. Construction of the Project would occur in phases and would require use of heavy equipment, construction vehicles, temporary work facilities, and traffic control measures. Following construction, temporary work areas would be restored to the extent feasible, while permanent facilities would remain in operation as part of the regional electrical transmission system.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237130
New
Federal
SOURCES SOUGHT ANNOUNCEMENT / INDUSTRY DAY FOR SENTINEL UTILITY CORRIDOR AT MALMSTROM AIR FORCE BASE, MONTANA
Solicitation # W9128F26SM024
The U.S. Army Corps of Engineers Omaha District is conducting market research via a Sources Sought Announcement (W9128F26SM024) for a potential Progressive Design-Build Other Transaction Agreement under 10 U.S.C. § 2808a. The project involves the construction of a new utility and communications corridor at Malmstrom Air Force Base, Montana, to support the Ground Based Strategic Deterrent Sentinel Program. This infrastructure, which will replace the existing Hardened Intersite Cable System, is estimated to extend between 1,750 and 2,225 miles and includes the installation of microducts, manholes, and handholes at a minimum depth of 6 feet. The overall estimated magnitude of the effort is between $1.4 billion and $2.0 billion, with incremental funding expected to span from FY29 through FY33 and a projected completion date around 2035. The acquisition strategy emphasizes a Qualifications Based Selection process, focusing on team composition, past relevant experience, and innovative problem-solving rather than price. The scope of work includes complex civil works for crossings of railways, rivers, and roadways, as well as comprehensive environmental support, including Supplemental Environmental Impact Statements and coordination with Tribal Cultural Specialists. Contractors must adhere to OSHA and EM 385-1-1 safety standards, Davis-Bacon labor laws, and NEPA environmental regulations while ensuring the active Minuteman III ICBM system remains operational. Interested firms under NAICS 237130 are requested to provide capability statements and complete an industry questionnaire by September 24, 2026, to inform the government's final acquisition strategy.
W071 Endist Omaha

POSTED

about 20 hours ago

DEADLINE

in 5 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement