Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on June 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Fire Alarm System Design & Engineering Services

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFQ: Susquehanna River Road Corridor Safety, Shared-Use Path and Quarry Park Access Improvements
Solicitation # BPM059336
The Town of Port Deposit, in coordination with WILMAPCO, is seeking a multidisciplinary planning and engineering consultant to implement an integrated safety and mobility project for the Susquehanna River Road corridor. The scope of work focuses on establishing a context-sensitive safety strategy using the Safe System Approach, determining safe multi-modal access to the planned Hopkins Quarry Park, and evaluating the feasibility and preliminary design of a shared-use path between Granite Avenue and Octoraro Park. The project aims to produce an actionable 30 percent design and basis-of-design package by June 30, 2027, with the potential for future progression to final Plans, Specifications, and Estimates. This is a qualifications-based selection process where the contract will be awarded to the most qualified firm based on equal weighting of their proposed team and key staff, project approach, and related experience in rural corridor safety and riverfront access. Compensation and detailed scope will be negotiated after the selection of the highest-ranked firm; therefore, no fee or price information should be included in the technical proposal. The project is initially funded by the Wilmington Area Planning Council and the Maryland Department of Transportation Kimberly Lamphier Bikeways Grant Program. Selected consultants must provide proof of financial capacity, a bid affidavit, and professional liability insurance of at least 1,000,000 dollars per occurrence, while adhering to federal civil rights and non-discrimination provisions.
Town of Port Deposit

POSTED

about 10 hours ago

DEADLINE

in 19 days
NAICS: 541330
New
SLED
Lift Station Communication Improvement (FEMA)
Solicitation # 26-051UM-RFP
The City of Plant City is soliciting proposals under solicitation 26-051UM-RFP for a turnkey engineering design and implementation project to modernize the communication network for 55 wastewater lift stations. The project focuses on replacing or integrating Remote Terminal Unit (RTU) hardware and deploying a new cellular-based communication network to ensure seamless connectivity with the City's SCADA system. This initiative is partially funded by a FEMA grant via the Florida Division of Emergency Management, requiring all work to adhere to strict standards for system hardening, operational continuity, and disaster resilience. The project includes the delivery of pre-configured communication assemblies and requires installation by a licensed electrical contractor, with system startup performed by the supplier. The selection process utilizes a points-based evaluation focusing on the logical sequencing of the proposed project schedule, the credentials of the proposer, and a track record of at least three similar projects completed in Florida within the last ten years. Bidders must provide itemized pricing for site-specific materials and project-wide labor. Compliance requirements are extensive, including adherence to the Davis-Bacon Act, Equal Employment Opportunity regulations, the Americans with Disabilities Act, and specific FEMA sub-recipient agreement terms. Proposals are due by 2:00 pm local time on November 19, 2026, and must include a baseline project schedule, a human trafficking affidavit, and certifications regarding foreign country entities. Final acceptance of the work by the City is required before any applicable warranty periods commence.
Utilities Maintenance

POSTED

about 12 hours ago

DEADLINE

in 22 days
NAICS: 541330
New
SLED
Cellular Service Site Assessment and Feasibility Study
Solicitation # 2026-TA-0906
The Town of Nantucket, through its Town Administration, is soliciting proposals for a Cellular Service Site Assessment and Feasibility Study under solicitation number 2026-TA-0906. The project requires licensed professionals to evaluate the physical, structural, and regulatory suitability of the Town's water storage tanks for future telecommunications use. Key deliverables include a comprehensive final report and presentation, as well as a regulatory and permitting assessment identifying necessary approvals from the FCC, Massachusetts DEP, and the Nantucket Historic District Commission. The anticipated period of performance is twelve months, and the selected contractor must provide a detailed work plan and timeline. Proposals must be submitted electronically by November 4, 2026, divided into separate technical and price volumes. To be considered, firms must meet minimum qualifications, including at least three years of full-time experience in similar work and a proven ability to complete projects for comparable or larger municipalities. Evaluation is based on a minimum quality review followed by a comparative ranking of finalists based on project understanding and relevant experience. The Town will negotiate with the highest-ranked finalist whose price falls within the budgeted amount. The contract is governed by the laws of the Commonwealth of Massachusetts and requires the contractor to enter into the Town's standard 30B Form Service Agreement. Mandatory requirements include providing a Tax Compliance Certification, a Certificate of Non-Collusion, and evidence of financial stability. Comprehensive insurance coverage is required, including Commercial General Liability of $1 million per occurrence, a $3 million Umbrella/Excess Liability policy, and Workers' Compensation in accordance with Massachusetts General Laws. Payment terms are set at thirty days following the receipt of a satisfactory invoice.
Town Administration

POSTED

about 13 hours ago

DEADLINE

in 7 days
NAICS: 541330
New
SLED
Fruitland Sewer Extension Preliminary Engineering Report
Solicitation # 2027-RFP-033
Wicomico County is soliciting proposals under solicitation 2027-RFP-033 for professional engineering services to develop a Preliminary Engineering Report (PER) for the Fruitland Sewer Extension Project. The primary objective is to evaluate alternatives for providing public sewer service to seven specific focus areas around Fruitland, prioritizing locations prone to septic system failure. The project assumes connection to the City of Fruitland municipal sewer system and treatment at the City of Fruitland WWTP. While the scope excludes analysis of the treatment plant's capacity, the selected vendor must identify necessary upgrades for existing downstream pumping stations and sanitary sewers. The PER must comply with USDA RUS Bulletin 1780-2 and build upon the Wicomico County Water and Sewer Master Plan from September 2021. The contract will be awarded based on best value for money, with evaluation heavily weighted toward demonstrated experience, technical expertise, and project approach (35%), as well as the capacity to deliver products timely (15%). Required deliverables include a life cycle present worth cost analysis of feasible options, detailed cost estimates, and conceptual schematics. The successful vendor must provide a lump sum fee proposal and execute an Agreement for Engineering Services using EJCDC documents per RUS Bulletin 1780-26. Key administrative requirements include providing a Maryland Certificate of Status, submitting insurance certificates within ten days of award, and executing the contract within fourteen days of receipt. Proposals are due by December 2, 2026, at 2:30 pm via the electronic procurement portal.
Public Works

POSTED

about 15 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves providing engineering design, system layout, and technical documentation services for replacing the fire alarm system at the Glen Canyon Power Plant. This work must ensure full compliance with federal specifications and National Fire Protection Association (NFPA) standards, reflecting a critical safety upgrade for the facility. The contract is a subcontract opportunity, designated as a Total Small Business Set-Aside under FAR 19.5, indicating that only small businesses are eligible to respond. Issued by the Department of the Interior through the Upper Colorado Regional Office, the solicitation was posted on June 3, 2026, with a response deadline of July 10, 2026. The contract falls under NAICS code 541330, which pertains to engineering services. While specific location and contact details are not provided, the work is focused on the Glen Canyon Power Plant site, and interested parties can find additional information via the provided online workspace link.

General Info

Engineering design and documentation for Glen Canyon fire alarm upgrade, small business subcontract, federal compliant.

NAICS

541330 - Engineering Services

Place of Performance

UT

Set-Aside

SBA

Documents

This scope was carved out of 140R4026R0010.

The full solicitation package (20 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

J--GC26 FIRE ALARM SYSTEM REPLACEMENT

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Upper Colorado Regional Office
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provide engineering design, system layout, and technical documentation for the replacement of the fire alarm system at the Glen Canyon Power Plant, ensuring compliance with federal specifications and NFPA standards.

More opportunities from Department Of The Interior → Upper Colorado Regional Office

Same awarding agency

NAICS: 237110
Federal
Y--EAST CANAL EFFICIENCY IMPROVEMENTS
Solicitation # 140R4026R0025
Solicitation 140R4026R0025 is a total small business set-aside for the East Canal Efficiency Improvements project on the Uncompahgre Project in Delta County, Colorado. Managed by the Department of the Interior's Bureau of Reclamation, Upper Colorado Regional Office, the project has an estimated magnitude between 5 million and 10 million dollars. The scope of work involves the construction of water supply facilities, specifically the installation of approximately 170 feet of parallel 54-inch HDPE pipe for a double barrel siphon, as well as 48-inch and 42-inch polypropylene profile wall piping. Additional requirements include the construction of concrete hydraulic structures, metalwork for diversion pipeline inlets, flow measuring equipment installation, earthwork, and clearing and grubbing. Work is subject to seasonal restrictions tied to irrigation shutdown and startup dates to avoid interference with agricultural operations. The period of performance is scheduled from January 25, 2027, to November 1, 2028, with performance required to begin within 21 days of award. Proposals are due by November 20, 2026, and will be evaluated based on a best value cost/technical tradeoff process considering technical approach, construction schedule, project team composition, past performance, and price. Awardees must provide performance and payment bonds within 10 calendar days of award and maintain liability insurance for work on government installations. Invoicing must be processed through the Invoice Processing Platform (IPP). The project is governed by FAR 52.246-12 for inspection of construction, with final acceptance occurring only at the jobsite after successful installation and testing.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 23 days
View Details
NAICS: 238210
Federal
R--CLWTP FISMA Compliance
Solicitation # 140R4026Q0108
The Department of the Interior, Bureau of Reclamation, is seeking a firm-fixed-price contract for professional technical services to bring the Navajo-Gallup Water Supply Project Cutter Lateral Water Treatment Plant SCADA system into FISMA compliance. The scope of work includes resolving information security and privacy weaknesses identified in the Plan of Action and Milestones, updating system documentation, and restoring communication links with the Navajo Tribal Utility Authority Escrito Mesa data concentrator. There is also an optional requirement for the programming and integration of the new DZ Booster Pump Station. The project requires the contractor to provide project management, a Quality Control Plan, and a Communication Plan while ensuring that critical water treatment processes remain uninterrupted. This is a sole source procurement under FAR 6.103-1 and FAR 12.201-1, with Jacobs Engineering identified as the uniquely qualified firm due to their prior design, construction, and operational knowledge of the facility. The base period of performance is from November 30, 2026, to May 30, 2028, with the optional booster plant integration scheduled from November 29, 2027, to May 30, 2028. Performance will take place in Farmington, New Mexico. Award will be based on the most advantageous offer considering price and technical capability, though technical and past performance factors are weighted as significantly less important than cost.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

9 days ago

DEADLINE

in 2 days
View Details
NAICS: 237110
Federal
Y--Turnout Buildings
Solicitation # 140R4026B0002
Solicitation 140R4026B0002 is a sealed bid Invitation for Bid issued by the Bureau of Reclamation for the construction of potable water delivery turnout buildings and associated improvements as part of the Navajo-Gallup Water Supply Project in northwest New Mexico. The project, estimated between $18 million and $23 million, involves work at seven sites, including Sanostee, Newcomb, and Naschitti. The scope of work encompasses the installation of precast concrete buildings and foundations, buried piping, valves, fiberoptic infrastructure, and controls integration with existing SCADA systems. Additional site improvements include gravel surfacing, steel fencing, and access roads for specific locations. The period of performance is scheduled from December 16, 2026, to April 16, 2029. The contract is a small business set-aside under NAICS code 237110. Award will be granted to the responsible, compliant offeror with the lowest total bid price, calculated across seven price schedules excluding certain taxes. Key contractual requirements include strict adherence to Davis-Bacon Act wage determinations for San Juan and McKinley Counties, compliance with the Americans with Disabilities Act, and the submission of a Small Business Subcontracting Plan. The contractor is responsible for quality control and geotechnical investigations, while the government maintains quality assurance. Failure to complete the work within the specified timeframe will result in liquidated damages of $4,536.00 per calendar day. Bids are due by November 10, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

15 days ago

DEADLINE

in 13 days
View Details
NAICS: 237110
Federal
Y--NGWSP Cutter Lateral Reach 21 Booster Plant
Solicitation # 140R4026B0003
The Navajo Gallup Water Supply Project Cutter Lateral Reach 21 Booster Plant is a construction project managed by the U.S. Bureau of Reclamation, Upper Colorado Basin Region. Located in San Juan County, New Mexico, approximately 26 miles south of Bloomfield, the project is part of a larger infrastructure effort to provide municipal and industrial water to the Navajo Nation, Jicarilla Apache Nation, and the city of Gallup. The scope of work includes the construction of a pre-engineered concrete booster pump station with associated foundations, electrical equipment, and fencing; the installation of a secondary regulation tank at the Regulation Tank No. 3 site; the implementation of SCADA and radio communications systems; and site restoration involving retaining walls, swales, and regrading to prevent erosion and scour. This procurement is conducted as a small business set-aside under NAICS code 237110, with an estimated project magnitude between $10 million and $25 million. The contract will be awarded to the responsible offeror with the lowest priced bid, provided they are compliant with solicitation terms and provide a bid guarantee of at least 20 percent of the bid price. Performance and payment bonds for 100 percent of the contract price are required. The period of performance allows for a start date within 21 calendar days of award, with total completion required within 392 calendar days. The project adheres to FAR Part 14, the Davis-Bacon Act for prevailing wages, and Buy American requirements for construction materials.
Water and Sewer Line and Related Structures Construction

POSTED

28 days ago

DEADLINE

in 2 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS