Foothill and Azusa Pipelines Treatment Plan for Golden Mussel Mitigation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of Water Resources will implement a chemical treatment plan to prevent the settlement and spread of golden mussels in the San Gabriel Valley/Azusa Pipeline and San Bernardino/Foothill Pipeline by dosing EarthTec QZ directly at the Devil Canyon Pumping Plant First Afterbay. The chemical concentration will be precisely calibrated to match the flow rate of water through the pipelines to ensure effective mitigation while minimizing environmental impact. A 6,300-gallon storage tank will be installed in the gravel parking area west of the pipeline intakes, enclosed by a 12x25 foot spill berm to provide secondary containment and prevent accidental releases. All activities, including access, installation, and monitoring, will be conducted entirely within the Department of Water Resources right of way to ensure regulatory compliance and operational control.

General Info

Dosing EarthTec QZ in pipelines to control golden mussels with secure storage and spill containment within right of way.

Agency

California Water Resources, Department of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Memory Lane, Devil Canyon Road, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Foothill and Azusa Pipelines Golden Mussel Mitigation

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Janine BeckEnvironmental Scientist
Sara LowryEnvironmental Program Manager

Full Description

Show more
Department of Water Resources (DWR) and Contractor will pump EarthTec QZ directly into the Devil Canyon Pumping Plant First Afterbay to prevent settlement and establishment of golden mussels in the San Gabriel Valley/Azusa Pipeline and San Bernardino/Foothill Pipeline downstream. Chemical dosing will be adjusted to achieve the target chemical concentration at a given rate of water flow in the pipelines. A 6,300-gallon storage tank will be located in the gravel parking area west of the pipeline intakes and will be surrounded by a 12x25 foot spill berm for secondary containment. All access and work is within DWR right of way.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Hawaii. This firm-fixed-price contract, issued as an Invitation for Bid (IFB) under NAICS code 237990, has an estimated value between 1 million and 5 million dollars. The scope of work includes mobilization and demobilization, the dredging and ocean disposal of 4,260 cubic yards of material, and revetted mole repairs involving stone rework, CRM wall repair, and vegetation removal. The period of performance is 200 calendar days from the date of the Notice to Proceed. The project requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone and aggregate testing. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and a Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. The contract includes liquidated damages of 2,297 dollars per calendar day of delay and requires a bid guarantee as well as performance and payment bonds. Award is based on the lowest responsive and responsible bidder, with specific set-asides for various small business categories including SDB, WOSB, HUBZone, and SDVOSB.
Healy Tibbitts Builders, Inc.

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is acting as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, for the City of San Diego. The project involves the design and removal of existing trailer-mounted Electrodialysis Reversal, slab-mounted Membrane Filtration, and Reverse Osmosis units. These will be replaced with new slab-mounted Membrane Filtration and Reverse Osmosis units to create a demineralization facility aimed at reducing total dissolved solids in reclaimed water. The estimated bid value for the project is 19,300,000.00 dollars, and the submission deadline for quotes is August 27, 2026, by 2:00 PM PT. The solicitation seeks subcontractors for a wide range of services, including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed surety company, though Garney will reimburse the bond premium. The project strongly encourages participation from small businesses and certified firms, including DBE, MBE, WBE, and SBE, and offers assistance to SLBE and ELBE firms in securing bonding lines of credit or insurance. Contracting will be based on Garney Standard PO and Subcontract Forms, and the project falls under NAICS code 237990.
Garney Pacific, Inc.

POSTED

about 12 hours ago

DEADLINE

in 10 days
View Details