This Solicitation opportunity from Massachusetts was posted on December 5, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract solicits labor and materials for the replacement of exhaust fans at the Framingham District Court located at 600 Concord Street, Framingham, Massachusetts. Issued under solicitation number BD-26-1107-FREG5-ACCOU-123268 by the Massachusetts Trial Court, this project encompasses comprehensive mechanical HVAC and electrical work aligned with specified asbestos abatement requirements. Contractors are required to comply with stringent regulatory standards, including OSHA asbestos regulations and Massachusetts prevailing wage laws. The scope includes removal and proper handling of asbestos-containing materials, installation of new exhaust fan systems in accordance with detailed project specifications, drawings, and applicable codes like the Massachusetts State Building Code, National Electrical Code, and UL certification standards. Testing, balancing, and labeling of installed equipment must meet performance and safety criteria as outlined in the project manual, with inspections conducted on-site by the Owner’s Representative.
Bidders must submit proposals electronically via the COMMBUYS platform by January 5, 2026, 2:00 PM EST, accompanied by a 5% bid deposit, relevant certifications, and bonding consistent with Massachusetts laws. The contract mandates adherence to Commonwealth standard contract forms, terms, and conditions, including payment bonds and confidentiality provisions. Labor classifications have detailed prevailing wage and benefit rates effective through mid-2028, emphasizing compliance with state labor standards. Security policies require data protection measures and background checks for personnel as needed. Contract administration will involve designated points of contact, with performance oversight ensuring all work meets regulatory and contractual requirements. Although the solicitation does not specify a total contract value or formal federal FAR clauses, award is expected under Massachusetts statutes favoring the lowest responsible bidder meeting all technical and legal criteria. The contract aims to enhance courthouse infrastructure while ensuring safety, regulatory adherence, and transparent procurement processes within the Massachusetts public construction framework.
General Info
Replace exhaust fans at Framingham Court with asbestos abatement, OSHA, wage, and code compliance.
HighAI Summary for Addendum No. 1 - Framingham District Court Exhaust Fan Replacement: Issued December 17, 2025, for Project No. FMD-26-TAB201. This addendum modifies the RFB to clarify permissible work hours for the Framingham District Court Exhaust Fan Replacement, specifically detailing limited access hours for the main detention area on weekdays and weekends.
PDF
PDF, High priority: read this first2 pages · contract-document
HighAI Summary for Commonwealth of Massachusetts Standard Contract Form: This document is the Commonwealth of Massachusetts Standard Contract Form, jointly issued by the Office of the Comptroller, the Executive Office for Administration and Finance, and the Operational Services Division. It serves as the default contract form for all Commonwealth Departments when no other form is prescribed. The form includes sections for contractor and Commonwealth information, procurement types, contract amendments, terms and conditions, compensation details, prompt payment discounts, supplier diversity program applicability, contract performance description, anticipated start and end dates, and certifications. It incorporates by reference various Commonwealth terms and conditions and requires contractor certifications under penalty of perjury. The form is updated as of 07/01/2025 and mandates adherence to specified procedures and documentation for contract execution and amendments.
PDF
PDF, High priority: read this first2 pages · contract-document
HighAI Summary for Commonwealth of Massachusetts Standard Contract Form: A standard template for the Commonwealth of Massachusetts used for new contracts and contract amendments. It includes sections for contractor information, compensation, prompt payment discounts, supplier diversity program plans, and certifications. The document serves as the default contract form for all Commonwealth Departments.
PDF
PDF, High priority: read this first2 pages · terms-and-conditions
HighAI Summary for Commonwealth Terms and Conditions Form Issued 10/25/19: This document is the Commonwealth Terms and Conditions form jointly issued by the Executive Office for Administration and Finance, the Office of the Comptroller, and the Operational Services Division for use by all Commonwealth of Massachusetts Departments and Contractors. Issued on 10/25/19, it outlines key contractual provisions including contract effective start date, payments and compensation, payment mechanisms, contract termination or suspension, written notice requirements, confidentiality obligations, record-keeping and retention, assignment restrictions, and subcontracting rules. The form is incorporated by reference upon execution of the Standard Contract Form and governs performance, deliverables, and contractor obligations under Commonwealth contracts.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Framingham District Court - Exhaust Fan Replacement Instructions to Bidders: Instructions to Bidders for the Framingham District Court Exhaust Fan Replacement project (Project No. FMD-26-TAB201). The document outlines the electronic submission process via COMMBUYS, a bid deadline of January 5, 2026, and a pre-bid conference on December 9, 2025. It specifies requirements for bid security (5%), the necessity of a 50% payment bond for the winner, and compliance with M.G.L. Chapter 30, Section 39M.
DOCX
DOCX, High priority: read this firstrfb
HighAI Summary for Framingham District Court – Exhaust Fan Replacement Project Bid Form: General Bid Form for the Framingham District Court Exhaust Fan Replacement Project (Bid BD-26-1107-FREG5-ACCOU-123268). The document includes a cost breakdown table for labor, materials, and equipment, requires certification of Massachusetts prevailing wage compliance, and sets a bid opening date of January 5, 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Framingham District Court Exhaust Fan Replacement Project - Drawings: Technical drawings and specifications for the Exhaust Fan Replacement Project at Framingham District Court, dated July 2024. The document includes a list of drawings (HVAC and Electrical), general demolition and MEP coordination notes, and detailed equipment schedules for fans (Greenheck) and grilles/diffusers (Titus).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Framingham District Court Exhaust Fan Replacement Project Manual: Project manual dated July 2024 for the exhaust fan replacement at the Framingham District Court in Framingham, MA. The document includes a table of contents covering mechanical (Division 23) and electrical (Division 26) requirements, and provides detailed technical specifications for asbestos abatement (Section 028213), including regulatory compliance, submittal requirements, and safety protocols.
DOCX
DOCX, High priority: read this first4 pages · bid-form
HighAI Summary for General Bid Form: This document is a General Bid Form used for submitting bids in a procurement process. It includes fields for bidders to provide pricing and other relevant bid information. The form is essential for the evaluation of bids and award decisions. The document appears to be a standard form, likely versioned or dated as per procurement requirements, and is critical for contractors to complete accurately to participate in the bidding process.
PDF
PDF, High priority: read this first5 pages · instructions-to-bidders
HighAI Summary for Instructions to Bidders - Framingham District Court Exhaust Fan Replacement: This document provides instructions to bidders for the Framingham District Court Exhaust Fan Replacement Project (Massachusetts Project No.: FMD-26-TAB 201). It outlines the bid submission deadline (January 5, 2026, 2:00 PM), submission platform (COMMBUYS), bid security requirements (5% bid deposit), pre-bid conference details, required bid documents, and qualifications. The document also covers bid opening procedures, contract award criteria, bonding requirements, and compliance with applicable laws and standards. Attachments include project specifications, drawings, wage rates, sample contract, payment bond form, and standard terms and conditions.
PDF
PDF, High priority: read this first9 pages · bid-drawings
HighAI Summary for M1671-029 Framingham District Court Exhaust Fan Replacement Bid Drawings: This document is a complete set of 9 stamped bid drawings dated July 2024 for the Framingham District Court Exhaust Fan Replacement Project in Massachusetts. It includes general, HVAC, and electrical drawings with detailed notes, legends, abbreviations, demolition plans, new work plans, schedules, and coordination instructions. The drawings specify installation requirements, equipment details, and compliance with project specifications and codes, serving as critical technical documentation for the solicitation and construction phases.
PDF
PDF, High priority: read this first100 pages · project-manual
HighAI Summary for M1671-029 Framingham District Court Exhaust Fan Replacement Project Manual: This Project Manual, dated July 2024, covers the Exhaust Fan Replacement Project at the Framingham District Court in Framingham, MA. It includes detailed sections on asbestos abatement, mechanical HVAC requirements, and electrical specifications. The asbestos abatement section outlines regulatory compliance, required submittals, and safety protocols for removal of asbestos-containing materials prior to renovations. The manual serves as a comprehensive guide for contractors, specifying work scope, safety standards, and coordination requirements with the Owner's Representative, Tighe & Bond, Inc.
PDF
PDF, High priority: read this first36 pages · wage-determination
HighAI Summary for Massachusetts Prevailing Wage Schedule for Asbestos Abatement Project in Framingham: This document is a prevailing wage schedule issued by the Massachusetts Department of Labor Standards for a specific public construction project involving asbestos abatement, demolition, and replacement of exhaust fans at 600 Concord Street, Framingham, MA. It includes wage rates effective from December 1, 2025, through June 1, 2028, for various labor classifications such as drivers, pile drivers, laborers, and asbestos removers. The schedule outlines base wages, health, pension, annuity, and supplemental rates. It also details legal requirements for contractors regarding wage payments, apprentice registration, payroll reporting, and compliance with Massachusetts General Laws Chapter 149, Sections 26 to 27H. The wage schedule must be incorporated into contracts and posted at the work site for the project's duration.
PDF
PDF, High priority: read this first11 pages · instructions
HighAI Summary for Massachusetts Standard Contract Form Instructions and Contractor Certifications: This document provides instructions and contractor certifications for completing the Commonwealth of Massachusetts Standard Contract Form, updated as of 11/01/2024. It includes detailed guidance on entering contractor legal names, addresses, contract managers, vendor codes, and department information. The instructions cover new contracts, procurement types, and emergency contracts, ensuring compliance with legal and procedural requirements. The document is intended to assist contractors and departments in properly executing and managing contracts under Massachusetts state policies.
DOC
DOC, High priority: read this first1 page · payment-bond
HighAI Summary for Payment Bond Form for Commonwealth of Massachusetts Contract: This document is a Payment Bond form used in contracts with the Commonwealth of Massachusetts, specifically through the Executive Office of the Trial Court, Office of Court Management, Facilities Management Department. It binds the principal and surety to pay for all labor and materials used in the contract, including any authorized modifications or extensions. The bond amount and contract details are to be filled in, and it references Massachusetts General Laws Chapter 30, section 39A, and Chapter 149, section 29. The form requires signatures and seals from the general contractor and surety, along with their printed names and surety address. The bond ensures payment obligations are met under the contract.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Prevailing Wage Rates - Office of the Trial Court Facilities Management (Framingham): This document specifies the prevailing wage rates for a project involving asbestos abatement, demolition, and replacement of exhaust fans and ductwork at 600 Concord Street, Framingham, MA. Issued by the Massachusetts Department of Labor Standards, it outlines mandatory wage schedules, reporting requirements for contractors, and apprentice registration rules. The document includes a detailed table of base wages and benefits for various equipment driver classifications effective through 2027.
PDF
PDF, Low prioritybid-tabulation
LowAI Summary for Bid Tabulation: Framingham District Court - Exhaust Fan Replacement (BD-26-1107-FREG5-ACCOU-123268): Bid tabulation for the Framingham District Court Exhaust Fan Replacement project (FMD-26-TAB201), dated January 5, 2026. The document lists four vendors (Stallion Plumbing, Ambient Temperature Company, Davison Company, and CAM HVAC & Construction) with their respective bid amounts, bond status, material lead times, and eligibility certifications.
DOC
DOC, Low priorityother
LowAI Summary for Commonwealth of Massachusetts Payment Bond Form: A blank template for a Payment Bond for the Commonwealth of Massachusetts, specifically for the Executive Office of the Trial Court, Office of Court Management, Facilities Management Department. The document outlines the legal obligation of the principal and surety to ensure payment for all labor and materials used in a construction contract.
PDF
PDF, Low prioritycontract-document
LowAI Summary for Commonwealth of Massachusetts Standard Terms and Conditions: Standardized terms and conditions issued by the Commonwealth of Massachusetts (ANF, CTR, and OSD) for use by all State Departments and Contractors. The document outlines mandatory provisions regarding contract effective dates, payment mechanisms, termination/suspension, confidentiality, record-keeping, and subcontracting requirements.
PDF
PDF, Low priorityother
LowAI Summary for Instructions to Standard Contract: This document provides administrative instructions for completing a Standard Contract Form for the Commonwealth. It details the required information for contractor and department fields, including legal names, addresses, contract managers, MMARS vendor codes, and procurement exception types such as Statewide, Emergency, or Department procurements.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.