Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Gold Bond Gypsum Wallboard Manufacturing Facility Demolition Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to the demolition and removal of all onsite improvements at the former Gold Bond gypsum wallboard manufacturing facility located at 1850 Pier B Street in Long Beach, California. The scope includes the complete dismantling and removal of structures such as the warehouse, gypsum dome, mill and plaster buildings, board plant, office complex, ship unloading hopper, overhead and reclaim conveyor systems, underground storage tanks, utilities, access roads, parking areas, and associated footings and electrical components owned by Gold Bond. Notably, certain infrastructure owned by Southern California Edison—including an electrical distribution panel and its foundation—and existing rail spurs and fencing will remain in place. The work is governed by stringent environmental and regulatory requirements under CEQA, SCAQMD, DTSC, and other state and local agencies, with mandatory compliance with ASTM E1527-21 for environmental site assessments and adherence to the approved Soil Management Plan. The project must follow a defined performance timeline spanning from December 2025 to February 2026, with advance notice requirements of 10 days prior to commencement and 48-hour notification before any work begins. The contractor is responsible for implementing fugitive dust controls, stormwater BMPs, hazardous materials management, and full indemnification of the Port of Long Beach against liabilities, in addition to submitting as-built drawings, certified surveys, and operational permits in specified formats. All submissions must be made in both hard copy and electronic formats, with digital deliverables required in active, editable formats such as Bentley MicroStation for CADD files and ASCII comma-delimited coordinates for utility data—PDFs and static documents are unacceptable. The Port of Long Beach serves as the lead agency overseeing environmental compliance, review, and final acceptance, with responsibility resting with its Director of Environmental Planning. Documentation must be submitted to designated email addresses including CEQA@polb.com and GoldBondDemo@polb.com, with physical copies sent to the administrative office at 415 W. Ocean Blvd. No contract value, pricing details, or federal acquisition regulations are specified, and no formal contracting officer, COR, COTR, or PCO is named; however, the environmental specialist Jennifer Blanchard is the primary point of contact for project inquiries. The site is situated within a designated disadvantaged community under California environmental justice statutes, and all activities must adhere to state environmental laws, including CARB diesel equipment standards, RCRA compliance for waste handling, and 811 utility coordination protocols. Final acceptance of all

General Info

Demolish and remove all onsite structures at Long Beach facility per strict environmental rules, Dec 2025–Feb 2026, with full compliance and digital deliverables required.

Agency

California → Long Beach, Port of

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

Pier B Street and Edison Ave, Long Beach, CA, 90813

Set-Aside

NONE

Documents

(12)

Caltrans Comments on Gold Bond Gypsum Wallboard Facility Demolition MND

PDFcomment

Gold Bond Gypsum Wallboard Facility Demolition IS-MND Sept 2025

PDFinitial-study-mitigated-negative-declaration

Notice of Determination for Gold Bond Gypsum Wallboard Manufacturing Facility Demolition Project

PDFnotice-of-determination

Gold Bond Gypsum Wallboard Manufacturing Facility Demolition Project Summary Form

PDFenvironmental-summary

Draft Application Summary Report for Gold Bond Gypsum Wallboard Facility Demolition

PDFapplication-summary-report

Notice of Completion & Environmental Document Transmittal for Gold Bond Gypsum Wallboard Facility Demolition

PDFnotice-of-completion

Notice of Availability and Intent to Adopt Initial Study/Mitigated Negative Declaration for Gold Bond Project

PDFspecial-notice

Gold Bond Gypsum Wallboard Facility Demolition Project NOC & Environmental Document

PDFnotice-of-completion

Notice of Public Hearing - Gold Bond Gypsum Wallboard Facility Demolition Project

PDFspecial-notice

Gold Bond Gypsum Wallboard Facility Demolition Initial Study and Mitigated Negative Declaration

PDFenvironmental-assessment

Harbor Development Permit Application Summary Report for Gold Bond Gypsum Wallboard Facility Demolition

PDFapplication-summary-report

Gold Bond Gypsum Wallboard Manufacturing Facility Demolition Project Summary Form

PDFenvironmental-summary

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Long Beach, Port of
Contacts3 people available
OfficeN/A
Organization / Agency
California → Long Beach, Port of
Office AddressN/A
Contacts
Jennifer BlanchardEnvironmental Specialist
John YakowenkoVP, Innovation & Engineering
Michael HardenPrincipal Planner

Interested Companies (1)

Show more
Environmental Science Associates
Los Angeles, CA

Full Description

Show more
Gold Bond Building Products, LLC (Gold Bond) proposes to demolish and remove all onsite improvements of the wallboard manufacturing facility consisting of a warehouse, rock storage building (gypsum dome), mill building, plaster mill, tape joint system building, board plant, office building and basement, ship unloading hopper and associated supporting footing on wharf, overhead rock conveyor system and associated supporting footings from the wharf to the gypsum dome, reclaim conveyor system to rock conveyor system, two rock conveyor systems from the gypsum dome to the mill building and associated footings, two underground storage tanks, underground utilities, interior access roads, parking areas, and electrical distribution and components owned by Gold Bond. An existing on-site electrical distribution panel, its foundation and appurtenances owned by Southern California Edison, and existing rail spurs and fencing at the site would remain in-place. There is no proposed in-water demolition work, development, improvements, operations, or new land uses for the site following the demolition of the facility.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
Monterey One - Renewable Energy Improvements (CP361), Marina, CA
Solicitation # monterey-one-renewable-energy-improvements-cp361-marina-ca
GSE Construction Co., Inc. is seeking qualified subcontractors and suppliers to participate in the Monterey One Water Regional Treatment Plant CP361 Renewable Energy Improvements Project located in Marina, California. The project scope includes extensive upgrades and replacements such as digester gas piping and safety equipment, new access roof hatches with concrete repairs, recoating and structural repairs to all four digesters and the digester building, installation of new level measurement devices, and integration of five Owner-furnished linear generators with associated electrical systems. Additional work involves installing biogas conditioning and renewable natural gas upgrading equipment with a pipeline to the PG&E injection station, replacing the existing steam system with a hydronic heating water boiler, removing old waste gas flares and installing new enclosed flares, and demolishing the Cogen facility and related structures. The project also encompasses civil, structural, mechanical, electrical, and demolition tasks necessary to support these improvements. Bidders must be prepared to comply with the project’s set-aside requirements, which include participation from Disadvantaged Business Enterprises certified by the Department of Transportation, Minority Business Enterprises certified by NMSDC, and Women Business Enterprises certified by WBENC. Responses are to be submitted by August 20, 2026, and interested parties must email estimating@gseconstruction.com to request access to the complete project documentation via a secure link. The solicitation is open to vendors under various NAICS codes related to construction specialties and is not restricted to federal procurement standards, with the lead point of contact being Michael Demissie at GSE Construction Co., Inc.
GSE Construction Co., Inc.

POSTED

about 8 hours ago

DEADLINE

in 12 days
View Details
NAICS: 238910
New
SEA S Concourse Evolution (SCE) – Bid Package 02
Solicitation # sea-s-concourse-evolution-sce-bid-package-02
The Seattle-Tacoma International Airport’s S Concourse Evolution (SCE) Bid Package 2, managed by Hensel Phelps as General Contractor/Construction Manager, encompasses a comprehensive suite of construction and systems integration activities critical to the modernization of the airport’s infrastructure. The scope includes demolition and abatement, building concrete retrofit, structural steel and metal stairs and railings, fire suppression systems, site paving, runway and taxiway marking, site demolition and earthwork, deep foundations, site utilities, aviation fueling systems, and baggage handling systems, with estimated contract values ranging from $124.2 million to $143.7 million across eleven subsystems. This bid package is structured under a Project Labor Agreement (PLA), requiring all workers to adhere to union labor standards, and mandates the use of Hensel Phelps’ standardized subcontract forms for all subcontracts. All subcontractors must provide performance bonds for contracts exceeding $100,000 and are required to submit a Workers’ Compensation Waiver of Subrogation. The work is to be performed entirely at the airport in Washington State, with bids due by August 11, 2026, and must be submitted via email to SEA-SCEBids@henselphelps.com using the official bid form provided in the Instructions To Bidders document. This solicitation is specifically reserved for Small Disadvantaged Businesses (SDB) under NAICS code 238910, with Hensel Phelps acting as an Equal Opportunity Employer and Contractor. Documentation requirements include the submission of the bid form, applicable bonds using provided templates, and strict adherence to the defined submission process, though specific performance periods, inspection criteria, payment terms, and evaluation factors are not detailed in the available materials.
Hensel Phelps

POSTED

about 8 hours ago

DEADLINE

in 25 days
View Details
NAICS: 238910
New
Pismo - DB Services for the Central Coast Blue AWPF, Pismo Beach, CA
Solicitation # pismo-db-services-central-coast-blue-awpf-pismo-beach-ca
GSE Construction Co., Inc. is seeking qualified subcontractors and suppliers to participate in the Design-Build construction of the Central Coast Blue Advanced Water Purification Facility in Pismo Beach, California, under solicitation number 2026-138. The project will deliver a new 0.50 million gallon per day facility aimed at producing approximately 500 acre-feet of purified water annually, incorporating critical components such as a 200,000-gallon equalization tank, membrane filtration, two-stage reverse osmosis, UV/advanced oxidation, post-treatment stabilization, chlorination, chemical storage and feed systems, purified water storage and pumping, and about 2,000 linear feet of HDPE conveyance pipelines. Additional scope includes groundwater recharge infrastructure comprising one injection well and two monitoring wells, along with full electrical, instrumentation, SCADA, and control systems. The solicitation targets specific NAICS codes related to construction, water and wastewater systems, chemical supply, and specialized fabrication, and is open to small businesses including Small Disadvantaged Businesses, Women-Owned Small Businesses, Disadvantaged Business Enterprises, and Minority Business Enterprises certified through NMSDC. Interested parties must contact estimating@gseconstruction.com to request secure access to all project documents prior to submitting a bid, with the response deadline set for August 11, 2026. The solicitation is managed under a set-aside designation supporting small and disadvantaged business participation, and key points of contact for inquiries are Michael Demissie and Juan Catano via their respective GSE email addresses. All technical details, scope requirements, and submission protocols are provided exclusively through the secure link issued after request, ensuring bidders have full context before preparing their proposals. The place of performance is confirmed as Pismo Beach, California, and GSE Construction Co., Inc. is acting as the lead contracting entity on behalf of the City of Pismo Beach for this municipal water advancement initiative.
GSE Construction Co., Inc.

POSTED

about 8 hours ago

DEADLINE

in 3 days
View Details
NAICS: 238910
New
SLED
AL ROLLINS PARK ARTIFICIAL TURF BASEBALL FIELDS RFP
Solicitation # PE-75552-NONST-2026-000000066
The City of Dalton is soliciting proposals for the supply and installation of four new artificial turf baseball fields at Al Rollins Park located at 521 Threadmill Road in Dalton, Georgia. The project requires the contractor to provide and install a complete artificial turf system, including a stone base, storm drainage, nailers, artificial turf, infill, base inserts, and field striping, along with all necessary labor and materials. The City will handle preliminary site work by removing soil to sub-grade and providing a connection point for the underdrainage system, as well as installing a concrete perimeter curb for the wood nailer. The selected contractor must coordinate closely with the City to ensure proper scheduling and phasing of installation. All interested parties are required to attend a mandatory pre-proposal meeting on August 25, 2026, at 2:00 p.m. at KRH Architects Inc. in Dalton; late arrivals will not be admitted. Sealed proposals must be submitted to the City’s Finance Department by 2:00 p.m. on September 8, 2026. The City reserves the right to request additional information from proposers and may shortlist qualified firms for interviews scheduled for September 10 and 11, with notifications sent by the end of the day on September 8. The solicitation number is PE-75552-NONST-2026-000000066, and the primary point of contact is Kenneth Harless of KRH Architects.
City of Dalton

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details