Gold Bond Gypsum Wallboard Manufacturing Facility Demolition Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Gold Bond Gypsum Wallboard Manufacturing Facility Demolition Project, under Harbor Development Permit Application No. 23-019, involves the complete demolition and removal of all onsite improvements at 1850 Pier B Street, Long Beach, California. The scope of work includes the removal of multiple buildings such as the warehouse, gypsum dome, mill building, plaster mill, tape joint system building, board plant, and office building with its basement. Additionally, the project covers the removal of the ship unloading hopper and wharf footings, various rock conveyor systems, two underground storage tanks, underground utilities, interior access roads, parking areas, and electrical distribution components owned by Gold Bond. Certain assets, including rail spurs, fencing, and a Southern California Edison electrical distribution panel, will remain in place. There is no proposed in-water demolition or new land use for the site following the completion of the work. The project is managed by the Port of Long Beach and is subject to the California Environmental Quality Act (CEQA), the California Coastal Act of 1976, and the certified Port Master Plan. Environmental clearance was achieved through a Mitigated Negative Declaration, which determined that there are no significant environmental impacts provided that specific mitigation measures for biological, cultural, and tribal resources are implemented. Demolition activities are estimated to take 170 days to complete. Coordination with Caltrans has established requirements for construction traffic control, including limiting large truck travel to off-peak hours and obtaining permits for oversized vehicles on state highways. The project was formally approved by the Long Beach Board of Harbor Commissioners on January 12, 2026.

General Info

Demolition of Gold Bond facility at 1850 Pier B Street, Long Beach, California.

Agency

California → Long Beach, Port of

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

Pier B Street and Edison Ave, Long Beach, CA, 90813

Set-Aside

NONE

Documents

(12)

Caltrans Comments on Gold Bond Gypsum Wallboard Facility Demolition MND

PDFcomment

Gold Bond Gypsum Wallboard Facility Demolition IS-MND Sept 2025

PDFinitial-study-mitigated-negative-declaration

Notice of Determination for Gold Bond Gypsum Wallboard Manufacturing Facility Demolition Project

PDFnotice-of-determination

Gold Bond Gypsum Wallboard Manufacturing Facility Demolition Project Summary Form

PDFenvironmental-summary

Draft Application Summary Report for Gold Bond Gypsum Wallboard Facility Demolition

PDFapplication-summary-report

Notice of Completion & Environmental Document Transmittal for Gold Bond Gypsum Wallboard Facility Demolition

PDFnotice-of-completion

Notice of Availability and Intent to Adopt Initial Study/Mitigated Negative Declaration for Gold Bond Project

PDFspecial-notice

Gold Bond Gypsum Wallboard Facility Demolition Project NOC & Environmental Document

PDFnotice-of-completion

Notice of Public Hearing - Gold Bond Gypsum Wallboard Facility Demolition Project

PDFspecial-notice

Gold Bond Gypsum Wallboard Facility Demolition Initial Study and Mitigated Negative Declaration

PDFenvironmental-assessment

Harbor Development Permit Application Summary Report for Gold Bond Gypsum Wallboard Facility Demolition

PDFapplication-summary-report

Gold Bond Gypsum Wallboard Manufacturing Facility Demolition Project Summary Form

PDFenvironmental-summary

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Long Beach, Port of
Contacts3 people available
OfficeN/A
Organization / Agency
California → Long Beach, Port of
Office AddressN/A
Contacts
Jennifer BlanchardEnvironmental Specialist
John YakowenkoVP, Innovation & Engineering
Michael HardenPrincipal Planner

Interested Companies (1)

Show more
Environmental Science Associates
Los Angeles, CA

Full Description

Show more
Gold Bond Building Products, LLC (Gold Bond) proposes to demolish and remove all onsite improvements of the wallboard manufacturing facility consisting of a warehouse, rock storage building (gypsum dome), mill building, plaster mill, tape joint system building, board plant, office building and basement, ship unloading hopper and associated supporting footing on wharf, overhead rock conveyor system and associated supporting footings from the wharf to the gypsum dome, reclaim conveyor system to rock conveyor system, two rock conveyor systems from the gypsum dome to the mill building and associated footings, two underground storage tanks, underground utilities, interior access roads, parking areas, and electrical distribution and components owned by Gold Bond. An existing on-site electrical distribution panel, its foundation and appurtenances owned by Southern California Edison, and existing rail spurs and fencing at the site would remain in-place. There is no proposed in-water demolition work, development, improvements, operations, or new land uses for the site following the demolition of the facility.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS