GSCA Mono County Outside Plant (OSP) Fiber Construction Project (Mono County, California Broadband Fiber-Optic Network Project)

Closed
2026-GSCA-RFB-008State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

about 13 hours ago

DEADLINE

in 16 days
NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers Chicago District is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified contractors for the CSSC Utility Feed Transformer Replacement project. Located at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois, the project requires the turnkey removal and disposal of two existing utility feed transformers and the installation, testing, and commissioning of two new operational replacements. The new units must have a capacity of 4,000/5,000 kVA, a primary voltage of 13,200 volts, and a secondary voltage of 480Y/277 volts in a three-phase, 60 Hz, Delta-Wye configuration. The contractor will be responsible for all labor, materials, rigging, and supervision, while reusing existing concrete pads, cabling, and switchgear. The anticipated period of performance is 365 calendar days from the Notice to Proceed. This is not a formal request for proposals or quotes, but a capability assessment to determine the availability of small businesses under NAICS code 237130. Key requirements for interested firms include a proven track record with medium-voltage electrical systems, compliance with USACE EM 385-1-1 and NFPA 70E safety standards, and the ability to meet strict procurement lead times. Responses must be submitted by November 5, 2026, and include a technical capability statement, project examples, and documentation of bonding limits. Firms must also specify their ability to satisfy limitations on subcontracting per FAR 52.219-14.
W072 Endist Chicago

POSTED

about 17 hours ago

DEADLINE

in 9 days
NAICS: 237130
New
SLED
2026-28 Electric Infrastructure Reconducts
Solicitation # 2026-28
The City of Covington, Georgia, is soliciting proposals under RFP #2026-28 for the reconduct of three-phase overhead utility lines across three separate projects. The scope of work includes Project 1 at Cornish Creek Newtonsboro Road, Project 2 at Elm and Reynold Streets, and Project 3 involving Eagle and Goldar General locations. The selected contractor will provide all labor, equipment, and coordination for the installation of poles, crossarms, conductors, and hardware, while the City will supply all materials. All work must be completed by May 31, 2027, and must adhere to first-quality workmanship and standard utility practices. Proposals must be submitted in sealed envelopes, including one USB drive copy, to the Covington Utility Complex by 10:00am on November 24, 2026. A mandatory pre-proposal meeting is scheduled for November 9, 2026. Submission requirements include a 5% bid bond, a non-collusion affidavit, and verification of compliance with the Illegal Immigration Reform and Enforcement Act of 2011. The awarded contractor must provide payment and performance bonds for 100% of the contract amount within ten days of notification and maintain comprehensive general liability, automobile liability, and worker's compensation insurance with limits of at least $1,000,000. Evaluation will be based on experience, personnel certifications, project approach, cost reasonableness, safety records, and references.
City of Covington

POSTED

1 day ago

DEADLINE

in 27 days
NAICS: 237130
New
SLED
Solar Streetlight Project – Phase 3
Solicitation # 8385
The Solar Streetlight Project – Phase 3 (C.I.P. No. 8385) is a solicitation by the City of Vista, California, for the receiving, storing, transporting, and installation of 125 solar streetlights. The scope of work includes the installation of galvanized steel and concrete light poles, solar modules, power centers, batteries, and luminaires. Comprehensive tasks involve excavation, concrete placement, pole erection, and the repair of any work-related damage to sidewalks, curbs, and utilities. The contractor is responsible for all labor, materials, and equipment, including hoisting and rental gear, traffic and parking control, public notifications, and the implementation of erosion and stormwater protection measures. All work must adhere to ADA standards for curb ramps and sidewalks and be performed during specified working hours, with lane closures restricted to 8:30 AM to 3:30 PM, Monday through Friday. The contract will be awarded to the lowest responsible bidder based on the total amount of Base Bid Items. To be eligible, bidders must possess the required licensure, provide proof of DIR registration per Section 1725.5 of the California Labor Code, and submit bids electronically via the OpenGov Procurement portal by November 25, 2026. Local business entities, as well as certified veteran-owned or disabled veteran business enterprises, may be eligible for specific preferences. Awarded contractors must provide performance and payment bonds, as well as workers' compensation insurance, within ten working days of the Notice of Intent to Award. Payment is processed via progress payments within 30 calendar days of receipt of a valid invoice, contingent upon the submission of certified payroll records and lien releases. Construction must commence within ten working days of the Notice to Proceed, with punchlist items to be completed within twenty working days of issuance.
City of Vista

POSTED

1 day ago

DEADLINE

in 29 days
NAICS: 237130
New
SLED
ON-CALL FIBER OPTIC INSTALLATION, FUSION SPLICING, TERMINATION, TESTING AND RELATED SERVICES
Solicitation # 26-032
The City of Carson is soliciting proposals under RFP #26-032 for qualified telecommunications firms to provide on-call fiber optic installation, fusion splicing, termination, testing, and related services for its municipal fiber optic network. The scope includes working on both new and existing infrastructure, with specific requirements for pulling cable and performing industry-standard testing, including power meter and bi-directional OTDR (1310/1550 nm). The City may award a single or multiple contracts with an anticipated term of five years. Performance standards are strict, requiring emergency onsite arrival within two hours and the start of splice work within four hours, while all test results and documentation must be submitted within two business days of assignment completion. Proposals must be submitted electronically via PlanetBids by November 12, 2026, at 2:00 PM PT. The evaluation process consists of a mandatory written proposal review, followed by optional interviews for high-ranking firms, with the award based on the best overall value in accordance with Carson Municipal Code. Selected contractors must adhere to a minimum local hiring requirement of 30 percent for employees and subcontractors. Financial security requirements include performance and payment bonds totaling 100 percent of the total compensation. Additionally, contractors must provide a detailed safety plan for any trench excavations five feet or deeper on projects exceeding 25,000 dollars and comply with all prevailing wage and insurance requirements.
City of Carson

POSTED

2 days ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract titled "GSCA Mono County Outside Plant (OSP) Fiber Construction Project" involves the construction of outside plant infrastructure and hut (HUT) installations for the broadband fiber-optic network in Mono County, California. This solicitation, issued by the California GSCA Construction agency, covers all aspects of physical fiber plant construction except for fiber splicing, which is addressed under a separate request for bid. The contract aims to expand broadband connectivity and supports the California Broadband initiative by installing communication conduits, poles, and equipment shelters necessary for the fiber-optic network deployment. The project follows stringent Caltrans standards and guidelines to ensure quality construction practices, especially given the varied terrain and bridge structures involved in the deployment. The project requires compliance with detailed technical specifications, including conduit installation, anchorage, and accommodation for thermal and seismic movements on existing infrastructures like bridges and culverts. Contractors must adhere to the 2024 Caltrans Standard Specifications, encompassing safety, environmental compliance, quality control, and risk mitigation during construction. The bid process has a clear timeline with a deadline in mid-April 2026, and points of contact are designated for technical questions and financial administration to guide prospective bidders. Overall, the contract focuses on reliable, durable fiber infrastructure capable of supporting future network expansion and maintenance, with specific attention to engineering and installation standards required for successful broadband delivery in the region.

General Info

Construction of broadband fiber infrastructure and huts in Mono County, following Caltrans standards.

Documents

26

2024 Caltrans Standard Specifications

PDF, High priority: read this first1372 pages · specifications
High

Bill of Materials for Mono County Hut LOC 12 Project

XLSX, High priority: read this first24 pages · bill-of-materials
High

Bill of Materials for Mono County Hut LOC 7 Project

XLSX, High priority: read this first24 pages · bill-of-materials
High

GSCA Contract 25-__ Form of Agreement for Public Improvements

DOCX, High priority: read this first13 pages · contract-document
High

GSCA Mono County OSP Fiber Construction Project RFB No. 2026 GSCA-RFB008

PDF, High priority: read this first31 pages · rfb
High

Guaranty Bond for GSCA Mono County OSP Phase 1 Fiber Construction Project

DOCX, High priority: read this first2 pages · guaranty-bond
High

Mono County Hut Location 6 Construction Plans

PDF, High priority: read this first20 pages · plans
High

Mono County LOC 12 June Lake Fire Dept Hut Site Plans

PDF, High priority: read this first8 pages · site-plan
High

Mono County LOC 1 Construction Plans

PDF, High priority: read this first20 pages · plans
High

OSP Schematic Plans - Mono County Project 2024

PDF, High priority: read this first343 pages · specifications
High

Payment Bond for GSCA Mono County OSP Phase 1 Fiber Construction Project

DOCX, High priority: read this first2 pages · payment-bond
High

Performance Bond for GSCA Mono County OSP Phase 1 Fiber Construction Project

DOCX, High priority: read this first2 pages · performance-bond
High

Plans for Mono County LOC 12 June Lake Fire Dept Hut Construction

PDF, High priority: read this first27 pages · plans
High

Plans - HUT LOC 7 Construction

PDF, High priority: read this first25 pages · construction-plans
High

Plans - HUT LOC 7 Zone Drawing - Mono County

PDF, High priority: read this first9 pages · specifications
High

Section 20 Communication Conduit Attached to Structures - Middle-Mile Broadband Network Detail Sheets

PDF, High priority: read this first9 pages · specifications
High

Specifications - Mono County Special Provisions-Construction

PDF, High priority: read this first113 pages · specifications
High

CAMON001 Fiber Allocation Plan

XLSX, Low priority353 pages · plans
Low

Guidance for Broadband Installation on Bridges V9.0

PDF, Low priority2 pages · guidance
Low

Mono OSP BOM Construction Plans

XLSX, Low priority436 pages · other
Low

OTDR Report BF009.6 Cable Test 6-6-2025

PDF, Low priority580 pages · other
Low

OTDR Test Results Example

XLS, Low priority20 pages · test-report
Low

Release and Certificate of Final Payment for GSCA Mono County OSP Phase 1 Fiber Construction Project

DOCX, Low priority1 page · release-and-certificate-final-payment
Low

Plans_-_Mono_Running_Line_&_Transition_Points_(KMZ).kmz

KMZ

Plans_-_OSP_Construction.pdf

PDF418 pages

Stud_Type_Mechanics.png

PNG

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → GSCA Construction
Contacts2 people available
OfficeSacramento, CA, 95814, USA
Office AddressSacramento, CA, 95814, USA
Contacts
Shayne PopeOutside Plant Construction Management Lead
Susana JacksonFinancial Planning & Administration Lead

Interested Companies (10)

AP Traffic ServicesMather, CA
Road SafetyRancho Cordova, CA
NEO FiberGLENWOOD SPRINGS, CO

See All 10 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
This bid is for Construction of the Mono County OSP and HUT installation. This does not include the Splicing portion of the work; a separate RFB is issued for the Fiber Splicing.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS