Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Vermont was posted on July 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Installation & Site Coordination

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
SLED
Transportation Yard A Gate Modifications
Solicitation # 090226-1
Solicitation 090226-1 involves modifications to Gate A at the Twin Rivers Unified School District Transportation Yard located at 1400 Grand Avenue, Sacramento, California. The scope of work encompasses site demolition, earthwork, trenching, backfilling, asphalt paving, and site concrete work. Key deliverables include the installation of chain link and decorative metal fences and gates, the addition of four 10-foot square tubing posts, and the relocation and secure anchoring of existing Knox Boxes. The project requires strict adherence to technical standards, including ASTM F 1083 for steel pipe, ASTM C94 for 2,500 p.s.i. concrete, and ASTM D 6628 for pavement markings. All field welding must be performed by a Certified Structural Welder. The awarded contractor is responsible for all site safety and must submit a Site Safety Plan in compliance with DSA Bulletin BU 24-05. Specific operational requirements include maintaining clear utility markings, storing cement in weather-tight buildings, and ensuring accessibility compliance via ADA and CCR Title 24 warning surface tiles. Project oversight involves coordination with the District Construction Manager for underground work and notification of the Inspector, Architect, and DSA 48 hours prior to concrete placement. A mandatory pre-bid conference was scheduled for September 14, 2026, with a final response deadline of September 23, 2026.
TWIN RIVERS UNIFIED SCHOOL DISTRICT

POSTED

1 day ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract entails the transport, installation, and precise alignment of four kiosk panels at Veterans Memorial Park, requiring coordinated efforts with Town staff to ensure seamless site preparation and operational compatibility. The work scope demands adherence to detailed project specifications, with a final inspection mandated to verify compliance and quality before project closure. All activities must be conducted in alignment with local requirements and timelines, emphasizing collaboration with municipal personnel to avoid disruptions and ensure public safety. The solicitation, issued under the subcontract category with NAICS code 238990, was posted on July 23, 2026, with responses due by August 17, 2026. The contracting authority is the Vermont Department of Economic Development, though specific office or point of contact details are not provided. The place of performance is Veterans Memorial Park, with no additional geographic details specified. Interested parties must respond by the deadline to be considered, and all work must meet the technical and logistical standards outlined in the project requirements without reference to external documentation.

General Info

Transport, install, and align four kiosk panels at Veterans Memorial Park per town specifications by August 17, 2026.

Agency

Vermont → Department of Economic DevelopmentView Agency

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

VT, USA

Set-Aside

NONE

Documents

This scope was carved out of 73977.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Redesign of Veterans Memorial Park Kiosk Panels

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
ContactsNo contacts available
OfficeN/A
Organization / Agency
Vermont → Department of Economic Development
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Transport, install, and align four kiosk panels at Veterans Memorial Park, including site coordination with Town staff and final inspection to ensure compliance with project specifications.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 541330
New
SLED
Centerville Brook AOP Obstructions Design Planning Hyde Park
Solicitation # 75140
The Centerville Brook AOP Obstructions Design Planning project in Hyde Park, Vermont, focuses on restoring aquatic organism passage and improving stream connectivity. The primary objective is to advance the Centerville Brook Dam removal from a 30 percent preliminary design to a 100 percent shovel-ready final design. This scope includes full structural removal of the dam, stream channel restoration, sediment management of approximately 200 cubic yards of impounded material, and the relocation of a dry hydrant to a viable downstream location at Brook Road. The project aims to eliminate flood risks, reduce streambank erosion, and enhance habitat complexity through the use of timber grade controls and Beaver Dam Analogs. Additionally, the project has expanded to include preliminary 30 percent design planning for two downstream culverts at Centerville Road and Brook Road. These structures currently act as perched barriers to native brook trout and other aquatic species. The design process will evaluate whether these culverts require full replacement or can be improved through aquatic organism passage retrofits. Managed by the Lamoille County Planning Commission and supported by grants from the Lake Champlain Basin Program and the New England Interstate Water Pollution Control Commission, the initiative seeks to establish a natural stream channel to improve water quality and flood water capacity.
Engineering Services

POSTED

1 day ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS