IPL26Q4 B2185 Install BFV control valves on all sprinkler risers on ground floor
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project involves the installation of Backflow Preventer Valve control valves on all sprinkler risers located on the ground floor of the facility at PAX FSC. These control valves are required to be equipped with tamper switch devices that must be integrated into and monitored by the base building fire alarm system. The scope of work may also necessitate that the contractor secure the incoming fire main supply to facilitate the successful installation of the new valves. This requirement is managed by Navfac Washington under the Department of the Navy. The project is currently listed as a forecast, with an initial posting date of July 2, 2026. Interested parties should note the specific technical requirements regarding fire alarm integration and the potential need for managing the existing fire main supply during the installation process.
General Info
Agency
NAICS
Place of Performance
W: PAX FSC, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
More opportunities from Department Of The Navy → Navfac Washington
Same awarding agency
