This Solicitation opportunity from State of Alaska was posted on June 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
ITB 26-23-214657 ARRC BRIDGE 158.7 REPLACEMENT
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Alaska Railroad Corporation is soliciting bids under ITB 26-23-214657 for the replacement of Bridge 158.7 over Cottonwood Creek in Wasilla, Alaska. The project involves decommissioning an existing timber bridge and constructing a new structure featuring concrete ballast deck beam spans and steel pipe piles. The scope of work includes technical requirements for deck plans, pile caps, superstructure sections, and the installation of specific end of track and bridge signage. Contractors must adhere to the 2025 Concrete Ballast Deck standards and the provided geotechnical report. The bid closing date has been extended multiple times and is now July 22, 2026. Key project terms include a substantial completion deadline of March 31, 2027, and specific provisions for railroad flagging, which include an 80-day allowance at an hourly rate of 315.00 dollars. Throughout five addenda, the corporation has provided critical updates regarding revised material quantities for Select Material Type A and C, clarified permitting responsibilities, and updated the cost schedule and plan sheets. Sealed proposals must be submitted to the Alaska Railroad Corporation in Anchorage, Alaska, and must include acknowledgment of all issued addenda.
General Info
Place of Performance
AK, USASet-Aside
Documents
10AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Posting Date: June 9, 2026 Updated Closing Date: JULY 22, 2026
Addendum 3 provides clarification in response to a bidder question Addendum 2 provides clarification in response to a bidder question, incorporates a revised plan sheet, and updated cost schedule. Addendum 1 serves to extend the bid closing date, answer questions, and provide clarification.
ITB 26-23-214657 ARRC Bridge 158.7 Replacement Construction Attachments: 1) Minimum Rates of Pay for Laborers and Mechanics, Effective April 1, 2026, issue 52 File name: Pamphlet_600_Issue_52 Pamphlet_600_Issue_52.pdf 2) BR158.7 CBD IFB CAO dated May 22, 2026 3) CBD Standards 2025 Revl dated May 2026 4) S-2.16 Ent Track and Bridge dated June 1, 2026 5) Typical Sections-1.01 dated June 1, 2026 6) ARRC_MP158.7_Geotech Report_FINAL_2026-06 due to the size dropbox location is: https://www.dropbox.com/scl/fi/hwfl2u22ymfoun1mta1k1/ARRC_MP158.7_Geotech-Report_FINAL_2026-06.pdf?rlkey=tdlop23m5qjmuq0n0rfx94be5&st=37n336d6&dl=0 Sealed Proposals will be received until 3:00 pm local time, June 30, 2026, at the following location: Alaska Railroad Corporation Attn: Sarah Wallace 327 W. Ship Creek Avenue Anchorage, AK 99501 The envelope used for the submittal of your offer shall be plainly marked with the following information: 1. Bidders name. 2. ITB # 26-23-214657 3. Date and time scheduled for the receipt of offers. 4. Sealed Offer: ARRC Bridge 158.7 Replacement Construction
More opportunities from State of Alaska → Alaska Railroad Corporation
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
