Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

J065--Replacement Dental Vacuum Pump System

Active
36C24727Q0080Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

811210 - Electronic and Precision Equipment Repair and Maintenance

Place of Performance

Department of Veterans Affairs Atlanta VA Medical Center, Decatur, GA, 30033, USA

Set-Aside

NONE

Documents

1
DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhasePresolicitation
Posted

Presolicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 247-NETWORK Contract Office 7 (36C247)
Contacts1 person available
OfficeAUGUSTA, GA, 30904, USA
Office AddressAUGUSTA, GA, 30904, USA
Contacts
Terri HudsonContracting Officer

Full Description

Show more
The Joseph M. Cleland Atlanta VAMC anticipates a requirement to provide Replacement Dental Vacuum Pump services. This contract is 30 days After Receipt of Order (ARO) and will be Firm-Fixed Priced (FFP). The performance will occur at the Contractor s location and Government furnished property will not be provided. All interested vendors are invited to provide information to contribute to this market survey/sources sought including commercial market information. THIS IS NOT A SOLICITATION ANNOUNCEMENT. This is a sources sought synopsis only. Questions should be submitted by email to contact@example.gov. Provide only the requested information below. The purpose of this synopsis is to gain knowledge of potential qualified sources and their size classifications (Full and Open Sources Sought Notice), relative to NAICS 811210. POTENTIAL SOURCES SHALL PROVIDE THE FOLLOWING INFORMATION IN THEIR RESPONSE:
1) Company name, address, phone number, primary contact(s), e-mail address, NAICS code(s), business size (i.e., small/large), size classification and UEI Number. 2) Provide a Statement of Capability that demonstrates the offeror's past performance in providing this type of service. 3) Submit Capability Statements via email to contact@example.gov by November 10, 2026. Responses should be received no later than 10:00 CST. 4) If a site visit is conducted, the REQUEST FOR QUOTE will give the date, time and address. NO CAPABILITY STATEMENTS MAY BE SUBMITTED AFTER November 10, 2026.
AT THIS TIME NO SOLICITATION EXISTS. (DO NOT REQUEST A COPY OF THE SOLICITATION). A FUTURE NOTICE WILL BE POSTED WHEN THE SOLICITATION WILL BE RELEASED.
5) Disclaimer and Important Notes: This notice does not obligate the Government to award a contract or otherwise pay for the information provided in response. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's qualifications to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or provide feedback to respondents with respect to any information submitted. After a review of the responses received, a pre-solicitation synopsis and solicitation may be published in Federal Business Opportunities. However, responses to this notice will not be considered adequate responses to a solicitation.
6) No proprietary, classified, confidential, or sensitive information should be included in your response. The Government reserves the right to use any non-proprietary technical information in any resultant solicitation(s).
STATEMENT OF WORK Dental Vacuum Pump Replacement 1. Project Overview This project addresses replacement of dental vacuum pumps, fluid separators, and associated components at Ft McPherson Medical/Dental Clinic, Building 125. Scope includes replacement of defective pumps, defective fluid separation, defective amalgam separation, and defective control panels. Ensure all installations are compatible with existing pipes and equipment to remain. All work shall comply with VA Design Manuals. Work shall result in a complete and working dental vacuum system. Work shall include training of VA clinicians, maintenance, and logistics personnel. Provide system schematics, operators manual, and warranty manual. Work shall be accepted by signature of VA Engineering Staff before closing out.
2. Equipment Information and Access Dental Vacuum System: Location: Fort McPherson VA Building 125, 1701 Hardee Ave. SW, Atlanta GA
On-Site Measurement and Verification Required: Comprehensive manufacturer records or as-built dimensions for existing Dental Vacuum System are not readily available. Therefore, the Contractor shall perform an on-site survey to obtain all necessary measurements for work requirements. No equipment is to be ordered, and no work shall begin until field-verified dimensions are submitted and approved by VA Engineering Department. The Contractor is responsible for coordinating measurement activities with facility engineering and ensuring all site-specific constraints are factored into submittals and planning.
3. Equipment History and Impacts The existing AirTech Dental Vacuum System has exhibited multiple pump and oral fluid storage failures over the last two years. The system exhibits signs of antiquation and inferior design. The components of the existing system differ from current market standards and may result in undesired storage condition of biohazardous fluid. Undesired fluid storage presents environmental concern and costly breakdown of system components. These failures have resulted in multiple Dental Clinic Outage and patient treatment interruptions at Fort McPherson.
4. Scope of Work 0. Replace existing fluid separators All fluid separation equipment shall include water washdown All fluid separation equipment shall include high fluid level alarm 0. Replace existing pumps All pumps shall be capable of 7inHg, 60cfm airflow each All pumps shall include vibration isolation All pumps shall operate at a constant volume with vacuum breaker relief 0. Replace existing amalgam separator 0. Replace all integrated and defective accessories 0. Repair all system piping, wiring, and conduit 0. System shall include schedule timer System shall include hand override for power-up when off-schedule. 0. Provide training for VA clinicians, maintenance, and logistics personnel. 0. Provide system schematics 0. Provide operators manual Provide warranty manual
Utility Outage, Safety, and Infection Control Submit a Utility Outage Request Form to VA Engineering Service at least 10 business days in advance and obtain written approval for all planned interruptions (electrical and hydronic) from the VA Engineering department prior to scheduling outages. Any work that shall be completed within the clinical footprint, shall be done during off hours to minimize impact to patient care. Strict adherence to Lock-Out/Tag-Out (LOTO) requirements for all energy sources throughout the course of work, with full documentation submitted for VA records. Comply with all VA and OSHA site safety protocols (including PPE, daily housekeeping, and mandatory orientation). Perform full Risk Assessment in coordination with VA Infection Control and Safety staff. The forms and requirements shall be approved before any work can take place. This shall implement and maintain all required barriers, negative air systems, and infection prevention measures specified in the PCRA. Secure written VA approval for all shutdowns or disruptions to critical clinic operations.
6. Work Schedule, Period of Performance and Access Restrictions 6.1.0 Regular Patient Care Hours: Major construction activities, including but not limited to demolition, equipment removal and installation, noisy work, disruptions to heating/cooling, or any work likely to cause patient or staff discomfort shall not be performed during the facility's regular patient care hours, defined as Monday through Friday, 8:00 a.m. to 4:30 p.m. Permitted Work Outside Regular Hours: All such major work shall be scheduled for after-hours (before 8:00 a.m. or after 4:30 p.m.), weekends, or designated federal holidays, unless otherwise approved in writing by the VA. Minor Work During Patient Care Hours: Low-impact activities (e.g., site layout, barrier/protection installation, documentation, off-site fabrication, administrative tasks, or other work not affecting staff/patient comfort or building functionality) may occur during regular patient care hours with prior VA approval. Advance Notice and Scheduling: The Contractor shall provide the VA Contracting Officer s Representative (COR) with a minimum of ten (10) business days written notice prior to commencing any after-hours or weekend work. Schedules shall be coordinated with VA facility operations to ensure clinical and safety needs are met. Holidays and Federal Closures: No work shall be scheduled or performed during federal holidays or unplanned federal facility closures unless specifically authorized in writing by the VA COR. Federal holidays include New Year s Day, Martin Luther King Jr. Day, Presidents' Day, Memorial Day, Juneteenth National Independence Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day. Period of Performance: TBD Emergency Work: In cases where emergency response is required to prevent immediate hazards or mitigate critical outages, the Contractor shall immediately notify the VA COR and facility staff. Emergency work, when authorized by the VA, may proceed during patient care hours if necessary for life safety or system protection. Exceptions: Any exception to these work hours and access restrictions shall be requested by the Contractor in writing and approved in advance by the VA COR. The request shall outline the justification and include a plan to minimize patient and staff impact. Responsibility for Coordination: The Contractor is responsible for integrating this schedule into all planning, coordinating with facility engineering and clinical teams, and maintaining continuous protection of patient care and comfort.
7. Compliance with VA Design and Construction Standards All work and deliverables shall comply with the most current: VA HVAC Design Manual VA Master Construction Specifications VA Mechanical Design Guides VA Plumbing Design Manual VA Electrical Design Manual VA Fire Protection Design Manual VA Physical Security Design Manual PCRA Requirements VA Commissioning Process Manual Any deviation from these standards requires written approval from VA COR.
8. Deliverables & milestones
Deliverable Description Due Date Site Measurement Report Contractor field-verifies and documents all critical dimensions and access limitations for existing equipment to remain, piping, rigging, and clearance. Before equipment submittals/ordering Inspection Reports / Replacement Schedule Valves, actuators, freeze stats, pumps, return fan; identified/replaced Prior to and post install Utility Outage Request Approval Documented VA approval for planned shutdowns Before affected work LOTO Documentation Proof of lock-out/tag-out procedures Prior to shutdown PCRA/ICRA Documentation Approved risk assessments and controls Before mobilization Humidifier Product Proposal/Cut Sheets Proposed equipment and justification Prior to submittal approval Return Fan Compatibility/Replacement Report Report verifying synchronization with new supply fan, or submittal for replacement if required Prior to installing supply fan system Commissioning Report Third-party validation of operation At completion Warranty Certification Documentation of warranty coverage At closeout Training Record Staff training documentation At turnover

9. Point of Contact Primary: Daryl Lewis contact@example.gov Back-up: Anthony Blake contact@example.gov Veterans Affairs Medical Center 1701 Hardee Avenue, SW Building 125, Atlanta, GA 30310

If there are further measurements, clarifications, or site access needs, Contractor shall promptly coordinate with VA facility engineering.

Similar Contracts

Same NAICS industry code

NAICS: 811210
New
SLED
Building Management System Maintenance, Repairs, and Services
Solicitation # 2027-RFP-00133
The County of San Mateo Department of Public Works is soliciting proposals under solicitation 2027-RFP-00133 for a comprehensive maintenance, repair, and service contract for Building Management Systems (BMS) across various county facilities, including the County Government Center and Maple Street Correction Facility. The selected vendor will provide a term of up to five years of support, encompassing routine preventive maintenance, system upgrades, 24/7 technical support, and emergency repairs with a required two-hour response time. A key deliverable is a preventive maintenance program consisting of bi-monthly visits per building, with service reports due within 48 hours of each visit. Qualified proposers must demonstrate technical expertise through Tridium Niagara BMS certification and maintain active C-10/C-20 licenses and Department of Industrial Relations registration. Proposals must be submitted electronically via OpenGov by November 4, 2026, at 5:00 pm. Award selection will be based on the overall best value, with evaluation factors including the appropriateness and accuracy of proposed labor fees for normal, overtime, and emergency hours. Contractors are required to carry general liability, workers compensation, and professional errors and omissions insurance, while adhering to prevailing wage requirements and industry standards such as ASHRAE, ISO, and ANSI.
Public Works - Facilities Services - FMO

POSTED

about 6 hours ago

DEADLINE

in 1 day
View Details
NAICS: 811210
New
SLED
Replace Display Panel on Fire Alarm Control/ AMSA Shop Mobil
Solicitation # SRC0000037537
Solicitation SRC0000037537 is a fixed price purchase order issued by the State of Alabama for fire alarm control panel repairs at the USAR AMSA Shop located at 1624 South Broad Street, Mobile, Alabama. The scope of work includes replacing a faulty display panel on a Simplex 4140 Controller and replacing a non-legible hydraulic Design Information Sign. All work must meet or exceed NFPA 72 and International Building Code requirements, and replacement parts must adhere to manufacturer specifications. The contractor is responsible for removing all debris from the property, as the use of facility dumpsters is prohibited. A mandatory site visit was scheduled for November 20, 2026, with a response deadline of November 24, 2026. The contract has a not-to-exceed ceiling of 25,000 dollars and may be renewed annually for up to five years. Bidders must submit responses electronically through Alabama Buys and may be required to provide proof of professional licenses, certificates of insurance, and manufacturer reseller authorization. Compliance with the Beason-Hammon Alabama Taxpayer and Citizen Protection Act via E-Verify is mandatory for suppliers with employees in Alabama. The State of Alabama is exempt from sales tax under the Code of Alabama 1975. Award evaluation will be based on pricing, cost realism, and price reasonableness at the discretion of the Chief Procurement Officer.
Army MCA_App 01_Real Property Operations & Maintenance, State Military Department

POSTED

about 6 hours ago

DEADLINE

in 20 days
View Details
NAICS: 811210
New
SLED
27RQ0196/FY27 UPS Maintenance Service
Solicitation # SRC0000037529
This solicitation is for a one-year Gold Full Coverage maintenance agreement for Uninterruptible Power Supply (UPS) equipment and batteries located in Clanton, Alabama. The scope of work includes semi-annual preventive maintenance consisting of one major service and one minor service, as well as 24/7/365 corrective maintenance. The agreement covers labor and all parts failed under normal wear and tear, excluding consumables such as batteries, capacitors, and fans. Service requirements include a phone response time of less than 30 minutes and a guaranteed eight-hour onsite emergency response. Major preventive maintenance involves detailed electrical connection checks, cleaning, voltage recording, and battery load testing, while minor maintenance consists of visual inspections. The equipment covered includes three Eaton UPS units and their associated batteries. The contract is administered by the State of Alabama and is subject to a total cost limit of 25,000 dollars over a maximum period of five years. Legal and administrative requirements include compliance with the Beason-Hammon Alabama Taxpayer and Citizen Protection Act, E-Verify documentation, and tax certifications per the Code of Alabama. The State reserves the right to request professional licenses, certificates of insurance, and manufacturer reseller authorizations following the bid opening. All responses must be submitted electronically through the Alabama Buys portal. Payment is handled via electronic methods, including state-issued credit cards and EFT, and the State maintains the right to inspect all products before final acceptance.
Information Technology General

POSTED

about 8 hours ago

DEADLINE

in 2 days
View Details

More opportunities from Department Of Veterans Affairs → 247-NETWORK Contract Office 7 (36C247)

Same awarding agency

NAICS: 485991
New
Federal
Augusta 5 Year Wheelchair Service IDIQ
Solicitation # 36C24726R0131
The Department of Veterans Affairs Ralph H. Johnson VA Medical Center is soliciting a five-year Firm-Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ) contract for wheelchair transportation services in Augusta, Georgia. This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 485991. The contract has a guaranteed minimum of 25,000 dollars for the first fiscal year and a total ceiling of 34,000,000 dollars. The contractor is responsible for providing all vehicles, personnel, and equipment necessary to transport patients, with specific requirements for wheelchair tie-down straps, communication systems, and adherence to local, state, and federal safety standards. Performance is measured by strict timeliness, requiring pickups and drop-offs within 15 minutes of the scheduled time and daily confirmation of requests via the VetRide system. Award will be based on a tradeoff methodology where experience is significantly more important than price. The government will evaluate the number, value, and relevance of the offeror's previous healthcare transportation contracts. Proposals must be submitted in PDF format to the designated point of contact by December 1, 2026. Key compliance requirements include a strict prohibition against billing VA beneficiaries or third-party insurance, adherence to VA cybersecurity and confidentiality directives, and the submission of a signed SF 1449 and SDVOSB certification. The contract structure includes five separate pricing periods and allows for a potential six-month extension of services.
Special Needs Transportation

POSTED

about 12 hours ago

DEADLINE

in 28 days
View Details
NAICS: 811210
New
Federal
J065--557-27-1-5151-0015 - Building 3 Dental Vacuum Pump Replacement (VA-27-00007830)
Solicitation # 36C24727Q0067
The Department of Veterans Affairs, Network Contracting Office 7, is conducting market research via a Sources Sought notice to identify capable businesses for the replacement of two dental vacuum pumps and an associated control system at the Carl Vinson VA Medical Center in Dublin, Georgia. The project falls under NAICS 811210 and PSC J065. The selected contractor must provide all labor, materials, and expertise to remove obsolete equipment and install new pumps with a minimum rated capacity of 80 CFM at 7 inches Hg, supporting at least 10 simultaneous users per pump, and compatible with 208/230V three-phase electrical service. All installation personnel must hold current ASSE 6010 Medical Gas Systems Installer certification, and all work must comply with NFPA 99 Health Care Facilities Code, UL, and FDA medical device requirements. The anticipated period of performance is 90 calendar days from the date of award, with potential extensions for equipment lead times. The scope includes site assessment, installation of the pumps and compatible monitoring systems, piping and electrical integration, and comprehensive operational and leak testing verified by VA Facility Maintenance personnel. While no set-aside has been determined, the government is specifically seeking responses from SBA-certified Service-Disabled Veteran-Owned Small Businesses and Veteran-Owned Small Businesses. Interested parties must submit a capability statement, past performance examples, and administrative data, including UEI and CAGE codes, to the contracting officer by November 6, 2026.
Electronic and Precision Equipment Repair and Maintenance

POSTED

1 day ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS