Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Hawaii was posted on May 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Kekaha Bridge Improvements, Kekaha, Kauai

Closed
B26003087State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the complete replacement of Bridge #108 located in Kekaha, Kauai, Hawaii. The project includes demolition of the existing steel bridge deck and support framing, which are made from railroad ties likely salvaged from a previous railroad structure, as well as the removal of abutments, wing walls, and foundations. The new construction will consist of a concrete bridge featuring precast concrete slab girders, cast-in-place concrete topping, abutments, wingwalls, and approach slabs. Additionally, the project includes the installation of a GRP culvert lining and the replacement of the existing 8-inch PVC waterline located along the upstream side of the bridge. This solicitation is issued by the Department of Business, Economic Development, & Tourism of Hawaii and is designated for State and Local Economic Development (SLED) organizations. Interested parties must submit their responses by June 13, 2026. Points of contact for this project are Ken Nakamoto and Wendy L. Gady, with Ken Nakamoto serving as the primary contact. The work will be performed in Kauai, Hawaii, and all necessary details and submission instructions are accessible through the Hawaii procurement portal.

General Info

Complete replacement of Kekaha Bridge #108 in Kauai with concrete structure, culvert lining, and waterline.

Agency

Hawaii → Department of Business, Economic Development, & Tourism

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

HI, US

Set-Aside

NONE

Documents

(11)

Section 503 Concrete Structures Amendment

PDFmodification

Surety Bid Bond Form

PDFsurety-bid-bond

05 AG 008 103D General Conditions

PDFgeneral-conditions

REV Kekaha Bridge 108 Replacement Plans 6062026

PDFspecifications

Kekaha Bridge #108 Replacement Plans

PDFspecifications

Addendum 2 to IFB-26-200-001 Kekaha Bridge 108 Replacement

PDFamendment

02 Kekaha Bridge 108 Replacement Specifications Amendments

PDFspecifications

IFB-26-200-001 Kekaha Bridge #108 Replacement

PDFifb

Kekaha Bridge #108 Replacement IFB-26-200-001 Bid Form

PDFbid-form

Addendum 1 to IFB-26-200-001 Kekeha Bridge Replacement

PDFamendment

Preliminary Geotechnical Investigation Report for Kekaha Roadway and Bridge #108 Repair

PDFgeotechnical-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyHawaii → Department of Business, Economic Development, & Tourism
Contacts2 people available
OfficeHI, US
Organization / Agency
Hawaii → Department of Business, Economic Development, & Tourism
Office AddressHI, US
Contacts
Wendy L. Gady

Full Description

Show more
Replacement of an existing Bridge #108, consisting of demolition of the existing steel bridge deck and support framing made of railroad ties likely salvaged from the railroad, abutments/wing walls and foundations; construction of a new concrete bridge consisting of concrete precast slab girders, cast in place concrete topping, cast in place concrete abutments, wingwalls and approach slabs; GRP culvert lining; and replacement of the existing 8” PVC waterline along the upstream side of the bridge.