Lake or Streambed Alteration Agreement No. EPIMS-SIS-63168-R1, Timber Harvesting Plan (THP) 2-25-00165-SIS “Red Springs.”

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to encroachment work involving six structures located within class II watercourses as part of the Red Springs Timber Harvesting Plan, approved on November 25, 2025. The work includes the construction of two new structures—the MRP 13-1 water drafting site and MRP 15-1 rocked ford road crossing—and the modification or reconstruction of four existing structures: the MRP 1-1 and MRP 15-2 temporary road ford crossings, MRP 2-2 upgraded drafting location, and MRP 7-4 vented ford stream crossing. All activities are explicitly defined in Section II of the approved Timber Harvesting Plan and are subject to regulatory oversight under Lake or Streambed Alteration Agreement No. EPIMS-SIS-63168-R1. The project is situated in Mount Shasta, California, and is administered by the California Department of Forestry and Fire Protection, with primary contact provided by Jon Woessner and secondary technical support from Andrew Yarusso, Senior Environmental Scientist. The agreement was posted as a forecast on July 24, 2026, indicating pending formal procurement or regulatory action.

General Info

Encroachment work on six watercourse structures in Mount Shasta under approved timber plan with regulatory oversight.

Agency

California Forestry and Fire Protection, Department of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Mount Shasta, CA

Set-Aside

NONE

Documents

(1)

FINAL_EPIMS-SIS-63168-R1_2-25-00165-SIS_THP_NOD_Signed

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Forestry and Fire Protection, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Forestry and Fire Protection, Department of
Office AddressN/A
Contacts
Andrew James YarussoSenior Environmental Scientist (Specialist)
Jon WoessnerReview Team Chair

Full Description

Show more
Encroachment work includes six (two new and four existing) structures within class II watercourses at: MRP 1-1 temporary structure for road ford crossing, MRP 2-2 upgrade existing drafting location, MRP 7-4 reconstruction of a vented ford stream crossing, 13-1 construction of new water drafting site, MRP 15-1 new rocked ford road crossing, and MRP 15-2 temporary structure for road ford crossing. All work is described in Section II of the Timber Harvesting Plan (THP) as approved on November 25, 2025.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
FY26 Black Rock Lock Damage RepairThe U.S. Army Corps of Engineers, Buffalo District, is seeking bids for the repair of damage to the Black Rock Lock in Buffalo, New York, caused by an oversized vessel colliding with the operating gate emergency egress ladder and fendering. The work must be completed in accordance with the technical specifications outlined in Section 3 of the Statement of Work and is classified under NAICS code 237990 for Other Heavy and Civil Engineering Construction. This is a 100% Small Business Set-Aside opportunity, reserved exclusively for small businesses as defined by the SBA. A mandatory site visit is scheduled for July 27, 2026, at 3:30 PM EDT at Black Rock Lock, with the GPS address listed as 62 Dann Street, Buffalo, NY 14217. All proposals must be submitted through the official Procurement Integrated Enterprise Environment (PIEE) website at https://piee.eb.mil/; no paper, fax, or telephone submissions will be accepted. Bidders must have an active registration in the System for Award Management (SAM) and must monitor PIEE for any amendments or updates to the solicitation, as these are the only official sources for changes. The solicitation number is W912P426BA012, and responses are due by July 29, 2026, at 6:00 PM EDT. Technical questions must be submitted via the Bidder Inquiry system on ProjNet using the provided key, but proposals cannot be submitted through ProjNet. Primary point of contact for inquiries is Andrew Hewitt, reachable at 716-339-3307 or andrew.b.hewitt@usace.army.mil.
W072 Endist Buffalo

POSTED

about 10 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237990
New
Federal
Juniper Springs BoardwalkThe Juniper Springs Boardwalk project, solicited under number 12445226Q0008, is a total small business set-aside under NAICS code 237990 with a small business size standard of $45 million, targeting the removal of an existing boardwalk and construction of a new modular system with post-on-pin foundations within the Ocala National Forest near Silver Springs, Florida. The scope includes specialty structures such as overlooks, a kayak launch, and a pedestrian truss bridge, with strict requirements for environmental protection including a Stormwater Pollution Prevention Plan, containment protocols for equipment near water, and adherence to habitat preservation measures. Work must comply with ADA standards per the Florida Building Code 8th Edition (2023), using slip-resistant surfaces, proper deck slopes, and accessible transitions. The contract mandates compliance with Davis Bacon wage rates for Marion County, prevailing labor standards, and federal anti-discrimination laws including Executive Orders 14168 and 14173, along with Title VI and Title IX. The offeror must submit a technical approach, past performance questionnaire, quality control plan, and detailed pricing through Attachment 1, adhering to strict formatting guidelines including page limits, font size, and file type for each volume of the proposal. Proposals must be submitted in sealed envelopes by August 17, 2026, at 2:00 PM ET, following an extension from the original August 10 deadline, and must remain firm for 90 days. The government will evaluate offers based on technical merit as the primary factor, with past performance and price serving as pass/fail gates—any failure to meet acceptable or neutral past performance or fair and reasonable pricing will disqualify an offeror. The contract includes FAR clauses covering inspection, changes, wage requirements, whistleblower protections, anti-trafficking, accelerated payments to small subcontractors, and warranty of construction, supplemented by agency-specific requirements for DEI compliance and contract administration through USDA-FS CSA EAST 12 in Atlanta, Georgia. Site visits are encouraged, with RSVP required by email to Jalisa Sims, and the project has an estimated value between $5 million and $10 million, with performance required to commence within 10 days of notice to proceed and complete within 365 calendar days, including final site cleanup.
Csa East 12 Usda-Fs

POSTED

about 10 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237990
New
SLED
Pearblossom Concrete Pad Replacement (OM-SFD-2026-003)The Department of Water Resources will replace an existing concrete pad at the Pearblossom Pumping Plant with a new, larger seismically stable pad to support a KYB Transformer. The current 24 feet by 28 feet by 18 inches thick pad will be fully demolished and removed, and a new pad of identical footprint will be constructed using concrete poured from a truck. To ensure seismic resilience, the subsurface will be excavated to a depth of approximately 36 inches to accommodate a 48-inch-thick reinforced base beneath the new concrete structure. All work will occur within the Department’s right of way, ensuring no external land use or permits are required for access or operations. The project is officially designated as Pearblossom Concrete Pad Replacement OM-SFD-2026-003 and was posted as a forecast on July 24, 2026. Primary points of contact for inquiries are Janine Beck, Environmental Scientist, and Sara Lowry, Environmental Program Manager, both reachable through their respective California Water Resources Department email addresses and phone numbers. The work site is located in California, though no specific city or zip code is provided, and no set-aside status or NAICS code is designated in the published data. No solicitation number has been assigned at this stage, indicating the procurement is currently in the planning and forecasting phase prior to formal bidding.
California Water Resources, Department of

POSTED

about 15 hours ago

DEADLINE

N/A
View Details