Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Hinkle Reservoir Embankment Restoration and Repair Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Hinkle Reservoir Embankment Restoration and Repair Project, managed by the San Juan Water District, involves the rehabilitation of the west and northwest embankment face and the toe drainage swale of a potable water storage facility located in Granite Bay, California. The primary objective of the work is to extend the infrastructure's lifespan, enhance resistance to erosion, and lower future maintenance costs for the benefit of the District's rate payers. Key technical requirements include repairing rivulets caused by water run-off and installing an armored layer of crushed rock to prevent future erosion. Additionally, the existing rock swale, which has become filled with silt, will be replaced with a concrete swale to ensure easier cleaning and maintenance. The project is classified under NAICS code 237990 and is designated as a forecast with a posted date of July 24, 2026. According to the Notice of Exemption dated July 22, 2026, the project is exempt from environmental review under the California Public Resources Code as it involves no expansion and is not expected to cause significant environmental impact. Mark Hargrove, Senior Engineer, serves as the primary point of contact for the project. The work will be performed at the Hinkle Reservoir located at 9935 Auburn Folsom Road, Granite Bay, CA 95746.

General Info

Repair and upgrade Hinkle Reservoir embankment and toe drainage swale with crushed rock and concrete to prevent erosion and reduce maintenance.

Agency

California → San Juan Water District

Place of Performance

CA, 95746

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Juan Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Juan Water District
Office AddressN/A
Contacts
Mark HargroveSenior Engineer

Full Description

Show more
Project includes the rehabilitation and repair of the existing west and northwest embankment face and toe drainage swale of the District's Hinkle Reservoir (potable water storage). More specifically, the embankment face work includes the repair of rivulets (erosion) that have developed over several years from water run-off down the face of the embankment. The rivulets will be repaired, and an armored layer of crushed rock will be placed over the area to protect it from future erosion. Work also includes the rehabilitation of the existing drainage swale at the toe of the embankment that has been filled in with silt from the erosion. The existing rock swale will be replaced with a concrete swale for ease of cleaning in the future. The purpose of the project is to extend life, improve resistance to erosion, and reduce future maintenance costs of the embankment and swale. These improvements will benefit the District's rate payers.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 6 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 7 hours ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS