Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Lena Sue Beam Boiler Addition Project

Active
98-26-014State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Lena Sue Beam Boiler Addition Project involves replacing the existing steam-powered heating system with a new hot water heating system across the Lena Sue Beam building, including the full installation of associated mechanical, electrical, and plumbing equipment. As part of the project, air purifiers will be integrated into the building’s air handlers to improve indoor air quality. The solicitation, issued by Gaston College under the North Carolina state entity, is open for bids with a response deadline of August 12, 2026, and was posted on July 14, 2026. The work is to be performed entirely in North Carolina, with Dashawn Biddy designated as the primary point of contact for inquiries. This procurement is categorized as a state, local, or educational agency solicitation and does not specify any small business set-aside provisions.

General Info

Replace steam heating with hot water system, add air purifiers, bid deadline August 12, 2026, Gaston College, North Carolina.

Agency

North Carolina → Gaston CollegeView Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

NC, US

Set-Aside

NONE

Documents

(2)

LSB Boiler Addition Bid Set for Gaston College

PDFsow

LSB Boiler Addition Project - Gaston College IFB 01-2026005

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNorth Carolina → Gaston College
Contacts1 person available
OfficeNC, US
Organization / Agency
North Carolina → Gaston College
View Agency Profile
Office AddressNC, US
Contacts
Dashawn Biddy

Full Description

Show more
Project includes providing and installing mechanical, electrical and plumbing equipment in the Lena Sue Beam building to remove the steam powered heating system and provide a hot water heating system. Air purifiers are to be installed on the air handlers.

Similar Contracts

Same NAICS industry code

NAICS: 238220
New
SLED
HVAC Repair Services, System Diagnostics, and Preventive Maintenance Austin State Supported Living CenterThe Health and Human Services Commission is seeking qualified vendors to provide comprehensive HVAC repair services, system diagnostics, and preventive maintenance for approximately 500 units of equipment at the Austin State Supported Living Center located at 2203 W. 35th Street in Austin, Texas. This solicitation requires bidders to attend at least one of two mandatory on-site visits scheduled for July 21 and July 22, 2026, at 10:00 AM Central Time; failure to attend in person and sign the attendance log will result in disqualification. Vendors must check in with security upon arrival and are encouraged to notify the onsite contact, Thomas Chavez, of their attendance. All participants in pre-bid meetings, including conference calls and webinars, must provide their legal business entity name, representative names and titles, and point of contact email to be included in the official attendance record. Requests for clarification must be submitted by July 23, 2026, with responses and addenda posted by July 27, 2026, and a courtesy review of HUB Subcontracting Plans is due by July 28, 2026. Responses to the solicitation are due by August 7, 2026, at 10:30 AM Central Time, with an anticipated contract start date of September 1, 2026. ADA accommodations can be requested at least 72 hours in advance by contacting the sole point of contact listed in the documentation.
Health and Human Services Commission

POSTED

about 13 hours ago

DEADLINE

in 20 days
View Details
NAICS: 238220
New
International
LLM26025 - Saskatchewan Polytechnic Moose Jaw - Chiller ReplacementThe Government of Saskatchewan, through SaskBuilds and Procurement, is inviting qualified suppliers to submit bids for the replacement of the chiller at Saskatchewan Polytechnic’s Moose Jaw campus under solicitation number 316-2026. The project requires the supply and installation of a new chiller unit, including the removal and proper disposal or recycling of the existing system, salvage of the compressor installed in 2025, restoration of the roof beneath the unit, crane installation of the new chiller onto the roof, and full mechanical, electrical, and controls integration with the building’s existing infrastructure. All work must result in a fully operational HVAC system compliant with project specifications. A non-mandatory Pre-Tender Site Meeting is available for bidders to gain further insight into the site conditions and requirements. Bidders must be registered on the Government Enterprise Management (GEM) system to access competition documents, submit questions, receive updates, and formally submit their bids. The opportunity was posted on July 17, 2026, and responses are due by August 12, 2026. All amendments and communications will be issued exclusively through the GEM portal. For registration or technical assistance, suppliers are directed to the GEM website and may contact Tina Munro at rfxquestions@gov.sk.ca.
SaskBuilds and Procurement

POSTED

about 18 hours ago

DEADLINE

in 25 days
View Details
NAICS: 238220
New
SLED
Volusia County Branch Jail Air Handler-Fire Suppression System Removal, Replacement and UpgradeVolusia County is undertaking a comprehensive, integrated renovation of its Branch Jail facility in Daytona Beach to replace aging and noncompliant building systems that have reached end-of-life. The project involves full replacement of all chilled water air handling units, fire and smoke dampers, the obsolete building automation system, and the fire alarm system, all of which are no longer functional, supported, or code-compliant for a detention environment. The existing HVAC infrastructure, including interconnected ductwork and damper relay panels, is degraded and lacks the ability to isolate smoke events to individual housing pods, posing significant life safety risks. The fire alarm system fails to meet current standards including the Florida Fire Prevention Code, NFPA 72, NFPA 101, and UL 864, and cannot support the required redundant fiber optic loop architecture. All systems will be upgraded simultaneously to modern, UL-rated, corrosion-resistant components with full per-pod smoke isolation and purge capability, integrated into a new, expandable Compass Controls building automation system. Work will be executed while the facility remains fully occupied, requiring strict coordination with security, implementation of fire watch protocols, phased construction, and temporary cooling solutions to maintain operational safety. The County has engaged Above Group Engineering & Consulting as mechanical engineer of record and Dewberry Architects Inc. as architect of record to deliver this high-stakes, single-phase upgrade under solicitation number 26-B-110IF, with proposals due by August 20, 2026.
Corrections

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from North Carolina → Gaston College

Same awarding agency