Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Marine Piling and Foundation Work

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Marine Piling and Foundation Work involves performing specialized construction services for prime contractors on WETA marine projects located in Vallejo, California. The scope of work focuses on the installation of a completed piling system for a temporary gangway pier, which includes the placement of 24 inch diameter steel pipe piles along with the necessary gangway hinges and plates. To ensure structural integrity and quality, all materials used must strictly comply with API 5L specifications. The project is managed under NAICS code 238910 for the San Francisco Bay Area Water Emergency Transportation Authority. Interested parties should note that the solicitation was posted on October 1, 2026, with a response deadline set for November 14, 2026. All performance of work will take place within the city of Vallejo, zip code 94590.

General Info

Subcontract for marine piling and foundation work for WETA projects in Vallejo, California.

Documents

This scope was carved out of 25-053.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Vallejo Ferry Terminal Reconfiguration Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Francisco Bay Area Water Emergency Transportation Authority
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs piling and foundation work for prime contractors on WETA marine projects in Vallejo, CA. Installs new temporary gangway pier piling, 24" diameter steel pipe piles, and gangway hinges and plates. Materials must comply with API 5L specifications. Delivers a completed piling system for the temporary gangway pier.

Similar Contracts

Same NAICS industry code

More opportunities from California → San Francisco Bay Area Water Emergency Transportation Authority

Same awarding agency

NAICS: 237990
SLED
Treasure Island Float Electrification
Solicitation # 25-065
The San Francisco Bay Area Water Emergency Transportation Authority (WETA) is soliciting proposals for the Treasure Island Float Electrification project under solicitation number 25-065. This professional services agreement focuses on the electrification and modification of the Treasure Island Float in San Francisco, California. The primary scope of work includes the installation of an Automated Mooring System, which involves removing existing mooring hardware and installing hydraulic mooring line tensioning systems, chocks, a hydraulic power unit, and mooring line davits. Additionally, the contractor must inspect and modify lifesaving equipment, including life rings, fire extinguishers, and ladders, in accordance with specific contract drawings. Proposals are due by November 9, 2026, at 5:00 PM PT via the Bonfire portal. Award evaluation is based on a 100-point scale, with the price proposal accounting for 70 points. The selected contractor must provide a performance bond and maintain comprehensive insurance. Key deliverables include vectorized as-built drawings, operations manuals for the charging and mooring systems, and monthly management reviews. Strict quality assurance standards are required, particularly for coating work, which must adhere to various ASTM and SSPC guidelines. Contract administration is managed by Project Manager Jan Rybka, with invoicing handled via PDF email. Payments are milestone-based and typically processed within 30 days of receipt. The contractor is responsible for protecting all materials from weather abuse and ensuring that hydraulic piping is fabricated in a controlled environment. Compliance with the Americans with Disabilities Act, Title VI of the Civil Rights Act, and various environmental and occupational safety standards is mandatory.
Other Heavy and Civil Engineering Construction

POSTED

15 days ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS