Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on June 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MATOC: Repair Fuel Tanks and Certified Inspection, Osan Air Base

Closed
W90VN625RA009Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237120
New
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
Solicitation W912HV26RA009, titled DESC2103C - Bulk Fuel Storage Tanks Phase II, is a construction project at Yokota Air Base, Japan, issued by the USACE Japan Engineer District. The project involves the construction of one 100,000-barrel cut-and-cover JP-8 storage tank featuring a reinforced concrete pump house with four 600-gpm issue vertical turbine pumps and one 50-gpm water draw-off pump. The scope includes the installation of a product saver tank, piping, valves, and vaults connecting to an existing filter separator building, as well as the integration of an automatic tank gauging system and control systems into the existing PLC and HMI infrastructure. The estimated project magnitude is between 7.5 and 15 billion Yen, with a performance period of 1,020 calendar days after the Notice to Proceed. This solicitation is restricted to local sources in Japan and utilizes the Lowest Price Technically Acceptable (LPTA) source selection process. To be eligible, offerors must be rated as acceptable in construction experience, system supplier subcontractor experience, and past performance. Specifically, prime contractors must demonstrate experience with fuel facility construction exceeding 1 billion JPY within the last 20 years. Proposals are due by January 25, 2027, and must be submitted via PIEE. The contract includes a priority rating of DO-C2 and specifies liquidated damages of 615,000 Yen per calendar day of delay. Compliance with EM 385-1-1 March 2024 safety procedures and the submission of a Contractor Quality Control Plan are mandatory requirements.
W2SN Endist Japan

POSTED

1 day ago

DEADLINE

in 3 months
NAICS: 237120
New
SLED
Kiefer Landfill Gas Utilization Project
Solicitation # PLER2024-00137
Kiefer Landfill Generating III, LLC is proposing to develop a renewable natural gas facility at the Kiefer Landfill in Sacramento County with a production capacity of 8,000 standard cubic feet per minute. The project will capture and process landfill gas to remove moisture and impurities, upgrading it to pipeline-quality methane that meets air quality standards. A new pipeline will be constructed to transport the purified gas to existing Pacific Gas & Electric infrastructure, with two proposed routes both beginning at the landfill and traveling northwest along Kiefer Boulevard before turning north along Sunrise Boulevard to terminate near the intersection of Sunrise Boulevard and Douglas Road. Depending on the selected route, the pipeline will connect to PG&E’s system via either a compressor station or a metering and regulating station located near designated property parcels on Douglas Road. The pipeline alignment is planned to utilize public rights-of-way and existing private easements to minimize land use impacts. The project is being managed under Sacramento County’s oversight, with environmental coordination handled by Julie Newton, and key stakeholders including applicant Andrew Petric of NextEra Energy and Project Manager Kathalyn Tung of MBaker International. The initiative is part of broader efforts to advance renewable energy by converting landfill emissions into usable natural gas, supporting regional decarbonization goals. The facility and pipeline will be sited entirely within Sacramento County, with the final interconnection point targeting PG&E’s distribution or transmission system in the 95683 zip code area. The project was posted as a forecast on June 11, 2026, and is currently undergoing environmental review under California’s CEQA process, with no set-aside or NAICS classifications provided at this stage.
Sacramento County

POSTED

4 days ago

DEADLINE

N/A
NAICS: 237120
New
SLED
Threemile Slough Pipeline Crossings Remediation and Decommissioning ProjectThe Threemile Slough Pipeline Crossings Remediation and Decommissioning Project, led by the California State Lands Commission for Pacific Gas and Electric Company, involves the remediation of active natural gas pipelines L-131Y and L-131Z to address shallow burial depths and the decommissioning and removal of two previously abandoned pipelines. Located in Rio Vista, Sacramento County, the project scope encompasses area preparation, pipeline remediation and removal, and post-construction restoration. Work is scheduled for a three-month window from August 1 through October 31, 2026, to protect special-status fish species, with a possible extension to November 30 upon authorization from the National Marine Fisheries Service. The project is subject to extensive environmental and regulatory oversight, including the California Environmental Quality Act, the Clean Water Act, and the Rivers and Harbors Act. Key compliance requirements include the identification of 3.51 acres of federal jurisdictional waters, the management of asbestos-containing materials through certified testing and approved disposal, and the implementation of a Mitigation Monitoring Program to address impacts on air quality, biological resources, and cultural sites. Safety and operational standards mandate adherence to Cal/OSHA regulations, the Lempert-Keene-Seastrand Oil Spill Prevention and Response Act, and technical standards from ASME, NACE, and ANSI. Hazardous materials must be stored in dedicated staging areas with secondary containment capable of holding 110 percent of the largest container's volume.
California State Lands Commission

POSTED

4 days ago

DEADLINE

N/A
NAICS: 237120
SLED
D-2027-03 (INSTALLATION AND ABANDONMENT OF NATURAL GAS MAIN, SERVICES AND ALL APPURTENANCES AND RELATED PAVING)
Solicitation # 36009
Philadelphia Gas Works is seeking sealed bids from qualified contractors for the installation and abandonment of natural gas mains, services, and all appurtenances, including related paving restoration, for a project located within the city of Philadelphia at 5800 Lindbergh Blvd and 2300-2500 S 58th St. The scope of work involves excavating, replacing, upgrading, and abandoning underground gas distribution systems in accordance with PGW Distribution Standards and PennDOT specifications for pavement and traffic markings. The contract will be awarded to the lowest responsive and responsible bidder based on price, performance history, financial standing, and compliance with DBE participation goals. Bids are due by October 29, 2026, at 12:00 PM and must be submitted via the pgw.procureware.com portal as searchable PDF files. The contractor is required to provide performance and payment bonds for 100 percent of the contract amount and maintain comprehensive insurance coverage, including a 20 million dollar umbrella liability policy and specific pollution liability if hazardous waste is handled. Administrative requirements include electronic invoicing via PayMode, submission of certified payroll forms, and a five percent retainage until substantial completion. Contractors must also adhere to strict safety standards, including OSHA compliance, drug and alcohol programs, and the notification of the Pennsylvania One Call System prior to excavation. Final acceptance of the work is determined by the date finished on the authorized representative's report.
Philadelphia Gas Works

POSTED

12 days ago

DEADLINE

in 9 days
NAICS: 237120
SLED
D-2027-04 (INSTALLATION AND ABANDONMENT OF NATURAL GAS MAIN, SERVICES AND ALL APPURTENANCES AND RELATED PAVING)
Solicitation # 36010
Philadelphia Gas Works is seeking sealed bids from qualified contractors for the installation, replacement, and abandonment of natural gas mains, services, and all associated appurtenances, including related paving restoration. The project is specifically located at 4500-4700 Chestnut Street within the city of Philadelphia. The scope of work includes all excavation and upgrading of the underground gas distribution system, with a requirement that all mains be tested at a minimum pressure of 90 psig with air for 24 hours. Contractors are responsible for restoring all paving removed during the project and must adhere to strict operational requirements, such as reopening closed streets daily and using Jersey barriers near SEPTA station entrances. The contract will be awarded to the lowest responsive and responsible bidder based on price, technical and operational capability, financial standing, and a history of meeting DBE participation goals. Bidders must submit a complete package via the procurement portal by October 29, 2026, including a price list, demographic survey, certificate of non-indebtedness, and a performance schedule. Required security includes a performance bond equal to 100 percent of the contract amount and a payment bond. The project is subject to prevailing wage rates and requires compliance with federal and local anti-discrimination laws. All invoicing must be handled electronically through the specified PGW accounts payable process.
Philadelphia Gas Works

POSTED

12 days ago

DEADLINE

in 9 days

AI Contract Overview

Show more

This contract pertains to a Multiple Award Task Order Contract (MATOC) focused on repairing fuel tanks and conducting certified inspections across Osan Air Base. The project is funded based on availability and involves a set of pre-selected contractors identified by specific solicitation numbers. The scope includes comprehensive repair and inspection services designed to maintain the operational integrity and safety of fuel storage facilities at the base. The solicitation emphasizes the importance of site visits for prospective offerors, with detailed instructions for proposal submission via the PIEE platform, including pricing, technical data, and compliance documentation such as tax exemption declarations and contractor registration. The contract is managed by the Department of the Army, specifically through the 0906 Aq Co Contracting Battalion, with key points of contact provided for inquiries. The response deadline is set for August 10, 2025, and proposals must be submitted by 0700 hours on that date. The project does not specify a set-aside status, indicating open competition among qualified contractors. Additional documentation references a separate scope of work for rail safety training at Norfolk Naval Shipyard, emphasizing federal compliance, safety standards, and detailed training requirements, although this is not directly related to the fuel tank repair project. Overall, the contract aims to ensure the continued safety, functionality, and compliance of fuel infrastructure at Osan Air Base through qualified contractors adhering to strict submission and operational guidelines.

General Info

Army solicits multiple contracts for fuel tank repair and inspection at Osan Air Base, South Korea.

NAICS

237120 - Oil and Gas Pipeline and Related Structures Construction

Place of Performance

Osan Air Base, AP, 96278, KOR

Set-Aside

NONE

Documents

19

Convault Tanks Repair and Repaint Guidelines

PDF, High priority: read this first53 pages · specifications
High

MATOC Fuel Tank Repair Project SMYU 21-1116 Q&A

PDF, High priority: read this first1 page · q-and-a
High

Repair Fuel Tanks & Certified Inspection Base-Wide - Project Drawings

PDF, High priority: read this firstspecifications
High

Section 02 61 13 - Excavation and Handling of Contaminated Material

PDF, High priority: read this first11 pages · specifications
High

SMYU 21-1116 Repair Fuel Tanks & Certified Inspection Base-Wide - Osan AB

PDF, High priority: read this firstsow
High

SMYU 21-1116 Repair Fuel Tanks & Certified Inspection - Osan AB

PDF, High priority: read this first23 pages · sow
High

SMYU 21-1116 Repair Fuel Tanks & Certified Inspection - Osan AB, ROK

PDF, High priority: read this firstsow
High

Solicitation Amendment W90VN625RA0090001

PDF, High priority: read this first5 pages · amendment
High

Solicitation Amendment W90VN625RA0090002

PDF, High priority: read this first3 pages · amendment
High

Solicitation Amendment W90VN625RA009-0003

PDF, High priority: read this firstamendment
High

Solicitation W90VN625RA0090001 - Repair Fuel Tanks Base-Wide FY25

PDF, High priority: read this first27 pages · rfp
High

Solicitation W90VN625RA009 - Repair Fuel Tanks & Certified Inspection

PDF, High priority: read this firstrfp
High

Submittal Register - SMYU 21-1116 Repair Fuel Tanks & Certified Inspection

PDF, High priority: read this first55 pages · submittal-register
High

UFGS-09 97 13.27 High Performance Coating for Steel Structures

PDF, High priority: read this first43 pages · specifications
High

UFGS-33 01 50.31 Leak Detection for Fueling Systems

PDF, High priority: read this firstspecifications
High

UFGS-33 56 10 Factory-Fabricated Fuel Storage Tanks

PDF, High priority: read this first70 pages · specifications
High

W90VN625RA0090002 - Repair Fuel Tanks Base-Wide, FY25

PDF, High priority: read this first27 pages · rfp
High

W90VN625RA0090003 - Repair Fuel Tanks Base-Wide FY25

PDF, High priority: read this first27 pages · rfp
High

Contractor's Tax Exemption Declaration

PDF, Low priority3 pages · supporting-document
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → 0906 Aq Co Contracting Bat
Contacts2 people available
OfficeAPO, AP, 96202-0000, USA
Office AddressAPO, AP, 96202-0000, USA
Contacts
SSG Chung Stephen
Mr. Anthony Mosley

Full Description

Show more
PROJECT TITLE: REPAIR FUEL TANKS & CERTIFIED INSPECTION BASE-WIDE PROJECT LOCATION: OSAN AIR BASE THIS PROJECT IS SUBJECT TO AVAILABILITY FUND. THIS IS MATOC WORK PLAN RFP FOR THE FOLLOWING CONTRACTORS ONLY; W91QVN-24-D-0022, -0023, -0024, -0025, -0026, -0027, -0028, -0030, -0031, -0033, -0035, -0036, -0038, -0080, -0083, -0109. OFFERORS MUST COMPLY WITH THE FOLLOWING: A. SITE VISIT: OFFERORS WHO INTEND TO PROPOSE ON THIS SOLICITATION ARE STRONGLY ENCOURAGED TO ATTEND THE SITE VISIT. SEE SITE VISIT CLAUSE IN SECTION L FOR THE SCHEDULE. B. SUBMISSION OF PROPOSALS (1) PROPOSAL PACKET: IT SHALL BE SUBMITTED BY 0700 HOURS ON THE CLOSING DATE OF RFP VIA PIEE. A. PRICING PROPOSAL B. OFFER BREAKDOWN C. DESIGN DATA D. COMPLETION OF SECTION K (ATTACHMENT: CONTRACTOR'S TAX EXEMPTION DECLARATION) E. PRIME CONTRACTOR REGISTRATION, STOCK CHANGE CERTIFICATION. SEE SECTION L. C. IF THE CONTRACTOR IS UNABLE TO SUBMIT THE PROPOSAL IN RESPONSE TO THE RFP, THE CONTRACTOR SHALL SUBMIT A NO OFFER LETTER BY THE DATE AND TIME SPECIFIED IN THIS SOLICITATION.

More opportunities from Department Of Defense → 0906 Aq Co Contracting Bat

Same awarding agency

NAICS: 561790
New
Federal
Cleaning of Food Service Exhaust Fans and Ducts for Dining Facilities in USAG Yongsan-Casey.
Solicitation # W90VN827RA001
Solicitation W90VN827RA001 is a firm-fixed-price requirement for the cleaning of food service exhaust systems, including hoods, ducts, and rooftop fans, at dining facilities within USAG Yongsan-Casey in Dongducheon, South Korea. The primary objective of the contract is to mitigate fire hazards caused by grease accumulation, with all work performed in accordance with NFPA 96 and Army Regulation 420-1. The scope includes providing all necessary personnel, equipment, and materials, as well as supplying parts for both preventive and demand maintenance orders. Performance is scheduled by frequency for specific buildings listed in the technical exhibits, and the contract includes a phase-in period with a required transition plan to be submitted within ten business days of award. Proposals are due by October 15, 2026, and must be submitted via the PIEE Solicitation app in three separate volumes covering technical approach, past performance, and price. Award will be granted to the responsible offeror deemed most advantageous to the government based on registration certifications, key personnel, past performance, and price reasonableness. Notably, offerors must possess valid ROK Government business licenses per the SOFA agreement and maintain active SAM registration. Contract administration requires the use of the Wide Area Workflow system for electronic invoicing and payment, while contractor personnel must adhere to strict installation security protocols, including DoD Cybersecurity Awareness Training and vehicle registration.
Other Services to Buildings and Dwellings

POSTED

4 days ago

DEADLINE

in 2 days
View Details
NAICS: 811310
New
Federal
Fuel Tank Inspection
Solicitation # W90VN626QA018
Solicitation W90VN626QA018 is a request for quotations for fuel tank inspection, testing, and maintenance services at Osan Air Base, Republic of Korea. The scope of work includes monthly and annual inspections of 369 active aboveground and underground storage tanks, emergency service calls, and repair services. The contract is structured as a Firm-Fixed-Price award consisting of a base year from January 1 to December 31, 2027, with four subsequent option years extending through 2031. This requirement is conducted under the Logistics Cost Sharing program and is funded by the Republic of Korea Ministry of National Defense, meaning the U.S. Government incurs no financial liability. The award will be based on a best-value comparative evaluation of four factors in descending order of importance: a practical demonstration via a mock inspection, technical factors including approach and staffing, past performance, and price. Offerors must meet strict eligibility requirements, including specific ROK business registrations for fuel tank maintenance and mechanical facility construction, and must provide key personnel such as an STI SP001 Certified Inspector and a licensed Contract Manager. All quotes must be submitted in English via the PIEE Solicitation Module by October 28, 2026, divided into four separate volumes covering technical, past performance, price, and administrative documentation.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

5 days ago

DEADLINE

in 8 days
View Details
NAICS: 332999
New
Federal
ACTIVE VEHICLE BARRIERS AND ASSOCIATED CONTROL SYSTEM AT OSAN AIR BASE
Solicitation # W90VN626QA017
Solicitation W90VN626QA017 is a commercial acquisition conducted under the Logistic Cost Sharing program for the purchase, installation, and integration of DoD Anti-Ram Listed Active Vehicle Barrier systems and associated Access Control Point control systems at the Morin and Main Gates of Osan Air Base, Republic of Korea. The contractor is responsible for the demolition and disposal of existing barriers, all necessary civil and electrical site work, and the complex reprogramming of Programmable Logic Controllers to ensure synchronized, fail-safe operations across multiple gatehouses and inspection centers. Technical requirements specify that equipment must meet ASTM F2656-20 standards, with minimum ratings of H30/P1 for the Morin Gate and M50/P1 for the Main Gate. The project includes a 240-day performance period with an estimated completion date of July 30, 2027. The government will award a firm-fixed-price contract based on best value, prioritizing the lowest-priced offer that is deemed technically acceptable with an acceptable past performance rating from the last five years. Key submission requirements include a material supply and technical support agreement from an authorized domestic supplier and manufacturer certification for installers. All quotes must be submitted electronically via the Procurement Integrated Enterprise Environment by the extended closing date of October 29, 2026, at 1300 hours KST. Notably, this contract is funded by the Republic of Korea Ministry of National Defense, meaning no U.S. government funds are obligated, and contractors must certify tax exemptions under the US-ROK SOFA.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

5 days ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS