The contract involves the resurfacing of approximately 13 kilometers of McConnell Lake Road, beginning at Highway 63, with the application of additional Granular A material, grading, and compaction to improve road integrity and safety. A key component of the work is the targeted removal and disposal of exposed bedrock that protrudes above or near the finished road surface, posing a hazard to vehicles, with specific sections also requiring bedrock excavation to enable the construction of drainage ditches. All work must conform to Schedule 1 – Work Requirements and relevant OPSS and OPSD standards, ensuring the road remains safe and functional for both public and commercial use. Additional gravel placement and grading may be necessary beyond the 13-kilometer stretch if conditions require it, and such expansions will be addressed under the same contractual terms. Unit rates for all services are fixed for the full duration of the contract, providing stability in cost expectations. Substantial completion of the core work is mandated by October 30, 2026, with full project completion required no later than November 27, 2026. The contract was issued by the Government of Ontario’s Natural Resources agency through tender number tender_21836, with procurement inquiries directed to Deepshikha Khatter. The solicitation was posted on July 20, 2026, and responses are due by August 18, 2026, with performance taking place entirely within the province of Ontario.
General Info
Agency
NAICS
Place of Performance
ON, CANSet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
The work requires removal and disposal of exposed bedrock that protrudes above or near the finished road surface and presents a hazard to vehicular traffic through the 13 kilometer road section. A subsection of the road requires rock to be removed to allow for a ditch to be constructed.
All Work shall be completed in accordance with Schedule 1 – Work Requirements (part of Attachment 2-Form of Agreement) and applicable OPSS and OPSD standards. The intent of this Work is to ensure the continued safe use of the road by both public and commercial traffic.
Additional gravel placement and grading beyond the initial 13 kilometer section may be required on an as-needed basis.
Unit rates shall remain fixed for the duration of the Contract.
Substantial contract work is required to be completed by October 30, 2026, and the project should be fully completed by November 27, 2026.