Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity involves the supply and installation of metal fabrications for prime contractors working on water booster pumping station projects for the City of Piqua in Ohio. The scope of work specifically includes the delivery and installation of structural metal components, such as metal gratings, metal ladders, and cold-formed metal trusses. The project is categorized under NAICS code 238120. Interested parties must submit their responses by the deadline of November 9, 2026, at 3:00 PM. Further details regarding the solicitation can be accessed through the Bid Express portal.

General Info

Supply and install metal fabrications for Piqua water stations by November 9, 2026.

Documents

This scope was carved out of 24-17.3.

The full solicitation package (10 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

24-17.3

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOhio → City of Piqua
ContactsNo contacts available
OfficeN/A
Organization / AgencyOhio → City of Piqua
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs metal fabrications for prime contractors on City of Piqua water booster pumping station projects. Installs cold-formed metal trusses, metal ladders, and metal gratings. Delivers installed structural metal components.

Similar Contracts

Same NAICS industry code

NAICS: 238120
New
International
Cabot Tower Signal Mast Replacement, Signal Hill National Historic Site
Solicitation # 5P468-26-0234/A
Parks Canada Agency is soliciting bids for the removal and in-kind replacement of the 6-meter wooden signal mast and associated rooftop equipment repairs at the Cabot Tower, located within the Signal Hill National Historic Site in St. John's, Newfoundland and Labrador. The project requires the contractor to remove the existing mast, measure it, and install an identical replacement to ensure existing equipment can be reattached, while also performing structural repairs to anchor bolts and roof materials. All work must comply with the National Parks Act, the Fisheries Act, and the 2025 National Building Code of Canada. The project is scheduled to be performed during the off-season when the tower is closed, with a final completion deadline of March 31, 2027. The contract will be awarded based on a weighted evaluation consisting of 90 percent price and 10 percent for an Indigenous Participation Plan. Bidders must follow a strict two-submission process, providing the Indigenous Participation Plan as Submission 1 and the Bid and Acceptance Form as Submission 2. Official bids must be submitted via email to [email hidden] or by fax to [phone hidden] by the closing date of October 29, 2026, at 2:00 PM NDT. Submissions via SAP Ariba, courier, or in-person will not be accepted. Contractors are required to implement comprehensive site-specific health, safety, and environmental plans, including spill control and resource protection, and must provide security personnel to guard the site after working hours.
Parks Canada Agency

POSTED

about 20 hours ago

DEADLINE

in 7 days
View Details
NAICS: 238120
New
SLED
New Combination Harford Academy and Elementary School: 05A Package–STEEL
Solicitation # HRM-26-3
The Board of Education of Harford County is soliciting sealed, lump-sum bids for the 05A Package-Steel for the construction of the New Combination Harford Academy and Elementary School located at 1605 Eva Mar Boulevard, Bel Air, Maryland. This project, estimated at approximately 150 million dollars, requires the provision of all labor, materials, equipment, and services for the steel package, including a base bid and several add alternates for classroom additions and floor finishes. Bids are due by 2:00 p.m. local time on October 29, 2026, at the Harford County Public Schools Planning and Construction Department Facilities Training Center. The contract emphasizes strict compliance with the Buy American Steel Act and Maryland prevailing wage standards. A Minority Business Enterprise goal of 15 percent is established, with a specific 8 percent subgoal for African American subgroups. Bidders must provide a bid bond of at least 5 percent of the combined bids, and the awarded contractor must provide 100 percent performance and payment bonds. Logistics are critical, as the project requires a phased, just-in-time delivery of structural steel, with materials not to be delivered to the site more than 14 calendar days before scheduled erection. Evaluation is based on the lump sum bid adjusted by unit price bids and alternates, with a preference order for award given to Harford County bidders, followed by out-of-county Maryland bidders. The contract includes a liquidated damages provision of 1,000 dollars per calendar day for delays beyond completion dates. Contractors must adhere to the T.J Vinton Schafer Safety Manual and the Construction Manager's Quality Control Program, and they must submit monthly LEED template updates to avoid payment holds. Required submission documents include the MBE Utilization and Fair Solicitation Affidavit, the Affidavit of Qualification to Bid, and a bid bond.
Harford County Public Schools

POSTED

1 day ago

DEADLINE

in 2 days
View Details

More opportunities from Ohio → City of Piqua

Same awarding agency

NAICS: 237130
New
SLED
24-17.10
Solicitation # 24-17.10
The City of Piqua, Ohio, is soliciting bids for project 24-17.10, which involves the electrical construction of the Piqua 69kV The Site Substation. With an engineer's estimate of $1,310,000, the scope of work includes furnishing and installing major equipment such as liquid-filled step-down transformers, circuit breakers, and switches, as well as the construction of 69kV incoming, switch, metering, and transformer structures. Additional requirements encompass the installation of grounding systems, above-ground conduits, and comprehensive site work including excavation, structural fill, grading, and site restoration. The project must adhere to strict technical standards, including NESC, NEC, IEEE, and ANSI, and requires compliance with Ohio State Prevailing Wage laws and the Americans with Disabilities Act. Bids are due by October 29, 2026, and must be submitted in duplicate. Award selection will be based on a comparison of relative merits and the lowest and best bid. Successful bidders must provide a bid bond of no less than 10%, as well as performance and payment bonds equal to the contract price. The contract also mandates a Drug Free Workplace Compliance Affidavit and requires contractors to assist the owner during the start-up and commissioning of all systems. Performance is subject to a penalty of $500 per calendar day for deliveries exceeding the designated completion date. All equipment must be delivered F.O.B. to the job site in undamaged condition with detailed packing lists.
Power and Communication Line and Related Structures Construction

POSTED

about 5 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237110
New
SLED
24-17.3
Solicitation # 24-17.3
The City of Piqua, Ohio, is soliciting bids for Project 24-17.3, the construction of the Drake Road Water Booster Pumping Station. This project involves the creation of a 6 MGD water booster pumping station designed to supply the City's Western Pressure Zone. The facility will be a single-story masonry structure built on a poured concrete foundation, with additional site improvements including approximately 400 linear feet of station suction and discharge piping. The scope of work is comprehensive, covering mechanical, HVAC, electrical, and process integration, including the installation of conductors, panelboards, engine generators, and various piping systems. The engineer's estimate for the project is 6,144,108 dollars, and bids must be submitted as a single lump sum. The contract requires strict adherence to State of Ohio Prevailing Wages and the 2010 Americans with Disabilities Act Standards for Accessible Design. Bidders must provide a qualification statement, project references, and a bid guaranty bond, as well as certify compliance with drug-free workplace and non-discrimination laws. The project includes specific cash allowances totaling 185,000 dollars for system integration, electrical and gas improvements, and special inspection and testing services. Performance and payment bonds are required upon contract award. The substantial completion date for the project is September 30, 2028, with final payment readiness expected by October 31, 2028.
Water and Sewer Line and Related Structures Construction

POSTED

about 5 hours ago

DEADLINE

in 23 days
View Details
NAICS: 238110
SLED
24-17.12
Solicitation # 24-17.12
The City of Piqua, Ohio, is soliciting bids for project 24-17.12, which involves the construction of cast-in-place drilled pier foundations for transmission line structures as part of the Washington/Farrington Road T-Line project. The scope of work includes furnishing all labor, materials, and equipment to install seven drilled pier foundations for self-supporting steel poles, consisting of five 70-foot, one 71-foot, and one 80-foot pier. The engineer's estimate for this work is $280,000. Bids are due by 1:00 PM on October 19, 2026, and must be submitted in duplicate using the provided printed forms. The award will be based on the lowest and best bid, considering price, relative merits, and the qualifications of the bidder and their subcontractors. Contractors must comply with State of Ohio Prevailing Wage laws and provide a bid bond for 10 percent of the total bid amount. Upon award, the successful contractor must furnish performance and payment bonds equal to the contract price and provide evidence of insurance naming the City as an additional insured. The project is governed by EJCDC C-700 Standard General Conditions and C-800 Supplementary Conditions. Key technical requirements include strict adherence to concrete strength and placement tolerances, with structures prohibited from erection until piers reach 75 percent of their design compressive strength. Performance penalties of $500 per calendar day apply for delays beyond the certified delivery date. Payment is processed monthly, with 90 percent of equipment costs due upon delivery and the final 10 percent due upon system acceptance and energization.
Poured Concrete Foundation and Structure Contractors

POSTED

8 days ago

DEADLINE

in 1 day
View Details
NAICS: 332312
SLED
24-17.9C
Solicitation # 24-17.9C
Project 24-17.9C is a solicitation issued by the City of Piqua, Ohio, for the fabrication and furnishing of steel structures for the 69kV The Site Substation and the Washington Road 69kV Transmission Line. With an engineer's estimate of $680,000, the scope of work includes the delivery of a complete and operable system featuring various components such as deadend H-frame structures, Vee switch structures, bus supports, metering structures, and several self-supporting steel poles ranging from 50 to 80 feet. All work must adhere to the National Electric Safety Code and specific technical load requirements for vertical, transverse, and longitudinal forces. Bidders must be actively engaged in the fabrication of such items and provide evidence of financial and performance capabilities. Submission requirements include a bid bond of 10 percent of the total bid amount, a contractor's qualification statement, and certifications for ADA and Drug Free Workplace compliance. The successful contractor will be required to post a performance-payment bond for 100 percent of the contract value. Deliveries must be made to the job site, with structural steel shipped in a single lot or within 24 hours, and a penalty of $500 per calendar day applied for late deliveries. Quality assurance involves manufacturer testing of bolts and certified welding inspections per AWS QC1 standards.
Fabricated Structural Metal Manufacturing

POSTED

8 days ago

DEADLINE

in about 14 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS