Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Virginia was posted on August 30, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

N1021 Transitway Extension to Pentagon City Segment IIA Project

Closed
N1021State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. This comprehensive infrastructure project requires a wide array of specialized services and materials, including site preparation, land surveying, subsurface investigation, and shoring. The scope further extends to complex pipeline and utility work such as tunneling, boring, jacking, micro tunneling, and the installation of cathodic protection and steel casing. Additional requirements include surface work like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, as well as the supply of ready mix, precast concrete, and manhole materials. The solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must hold a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Kiewit also emphasizes the importance of labor harmony and notes its existing collective bargaining agreements with several trade unions. Interested parties must submit their quotes by November 18, 2025, via the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 10 days
NAICS: 237310
New
SLED
Katella Ave & State College Blvd Rehabilitation Project
Solicitation # RCP2025-23565
The Katella Ave and State College Blvd Rehabilitation Project (RCP2025-23565) is a public works initiative by the City of Anaheim to improve roadway structure and pedestrian safety. The scope of work includes removing and reconstructing asphalt concrete pavement using rubberized asphalt concrete, installing ADA access ramps, sidewalks, curb and gutter, and adjusting utility pull-boxes. The project also encompasses the installation of striping, signage, and pavement markings. Work is located on Katella Avenue from Auburn Way to Douglass Road and State College Boulevard from Katella Avenue to Gene Autry Way. The estimated construction cost has been updated to 5,041,243.00 dollars, with a performance period of 70 working days from the Notice to Proceed. The contract is governed by the 2024 Standard Specifications for Public Works Construction and specific project special provisions. Award will be granted to the lowest responsive and responsible bidder holding a General Engineering (A) license. Bidders must be registered with the Department of Industrial Relations and agree to be bound by the Community Workforce Agreement. Key submission requirements include a 10 percent bid bond, a non-collusion declaration, and the use of the OpenGov portal for proposals. Performance is subject to strict scheduling, with work affecting CALTRANS Right-Of-Way restricted to overnight hours between 10:00 p.m. and 5:00 p.m. Monday through Friday. Final payment is contingent upon the approval of As-Built Plans submitted 21 days prior to the final invoice.
Public Works

POSTED

about 24 hours ago

DEADLINE

in 5 days
NAICS: 237310
New
SLED
Weatherford Parking Lot Replacement
Solicitation # 405-26R0027374
The Texas Department of Public Safety (DPS) has issued Invitation for Bids (IFB) solicitation 405-26R0027374 for the Weatherford Parking Lot Replacement at the Weatherford Highway Patrol and Driver License Office. The project requires a comprehensive remove and replace approach, involving the milling of all existing asphalt surfaces to a minimum depth of 2.5 inches, prepping the area, and installing new asphalt with a minimum finished depth of 2.5 inches compacted to approximately 98 percent. The scope also includes full restriping of the lot, including handicap and fire lane markings, and the removal and resetting of wheel stops. To maintain operational continuity, the contractor must perform work during off-hours and provide a work phasing plan for agency approval. Bids are due electronically by 5:00 P.M. CT on November 13, 2026, via the DPS Online Bid Room or designated email. Responses must be organized into four volumes covering required contract forms, information bid details, a subcontracting plan, and a mandatory pricing schedule. Award decisions will be based on the best value standard, with a significant emphasis on past performance. Key requirements include adherence to Texas Government Code Chapter 2258 prevailing wage rates, the provision of performance and payment bonds for contracts exceeding specific thresholds, and the completion of fingerprint-based criminal history background investigations for personnel. All work must be performed by qualified craft persons with at least three years of field experience and comply with all state and local codes.
Department of Public Safety

POSTED

1 day ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The Transitway Extension to Pentagon City Segment IIA project involves the construction of a dedicated bus lane along 12th Street South in Crystal City, Virginia, between South Eads Street and Fern Street South. The project includes the installation of a center-running bus-only lane, two new transit stations at the intersection of 12th Street South and South Elm Street, and various accessibility and safety features such as ADA-compliant boarding platforms, detectable warning surfaces, prefabricated bus shelters with amenities like benches, bike racks, and trash receptacles. To support increased transit capacity, a concrete bus pad will replace the existing asphalt roadway pavement, and the entire area will be restriped to accommodate new traffic patterns and bus lanes. The project also encompasses associated work with the Segment I project, including the installation of rub rails, flag signs at stations, County-owned signage, and pavement markings along 12th Street S and Crystal Drive from Long Bridge Drive to 15th Street. The contract, managed by Arlington County Government within Virginia, has a project size estimated between five and fifteen million dollars. The solicitation was posted on August 30, 2024, with a response deadline of September 27, 2024. The primary point of contact is Sy Gezachew, reachable via email or phone. The project aims to enhance transit infrastructure and improve traffic flow in the area. Additionally, Arlington County has issued a separate solicitation for transportation planning and engineering services to support the broader scope of the transit projects, emphasizing a comprehensive approach to transportation improvements in the region.

General Info

Documents

1
PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVirginia → Arlington County Government
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The Transitway Extension to Pentagon City Segment IIA project is along 12th Street South in Crystal City between South Eads Street and Fern Street South. This project will have a center running designated bus only lane. Two new Transit Stations are proposed, both are located at the 12th Street South and South Elm Street intersection. The construction will include a near level center running boarding platform, detectable warning surfaces, ADA accessibility features, prefabricated bus shelters, amenities such as benches, bike racks and trash receptacles and street improvements. A concrete bus pad will replace existing asphalt roadway pavement for the transitway to accommodate the additional loading in this area. The entire project area will include restriping to accommodate the bus lanes and new traffic patterns.In addition to the Segment IIA project, there will be associated work with the Segment I project. The Transitway Extension to Pentagon City Segment I project is located on 12th Street S and Crystal Drive between Long Bridge Drive and 15th Street. The work will include but not limited to; installation of rub rails and flag sign at two stations, installation of County owned signs, and pavement markings.

More opportunities from Virginia → Arlington County Government

Same awarding agency

NAICS: 493110
New
SLED
Offsite Physical Records Storage, Retrieval, and Destruction Services – Rebid
Solicitation # N1516
Arlington County Government is soliciting bids for a qualified contractor to provide secure offsite physical records storage, retrieval, transportation, refiling, records access, reporting, and authorized destruction services. The selected contractor must operate a facility within a 1.5 hour one-way drive from the Bozman Government Center in Arlington, Virginia, and must have at least five years of experience providing these services to government or healthcare organizations. The scope includes an initial records transfer of up to 20,000 cubic feet, with the capacity to accommodate an annual growth of up to 10 percent. The contractor is responsible for providing all necessary supplies, such as standard records cartons and barcode labels, and must ensure that specialized media like X-ray film and magnetic tapes are handled according to specific environmental and security requirements. The contract will be awarded to the lowest responsive and responsible bidder based on the Total Evaluated Bid. Compliance requirements are stringent, including adherence to the Virginia Public Records Act, HIPAA for protected health information, and the Americans with Disabilities Act. Bidders must be authorized to transact business in Virginia and provide proof of specific insurance coverage. All submissions must be made electronically via the PRISM+ portal by November 20, 2026. Payments will be processed via ACH within 45 days of invoice approval by the County Project Officer. The County maintains the right to conduct unannounced inspections to verify compliance with all security and life-safety standards.
General Warehousing and Storage

POSTED

5 days ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS