Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

NDW26 PATUXE-1181 / NAS DOG KENNEL - HVAC CORRECTIONS & REPAIRS

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac WashingtonView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Washington
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Washington
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Evaluation of the current issues pertaining to B1181. 1. The primary issues are the lack of airflow due to no preventive maintenance for the main Daikin system and the PTAC unit. But the units are performing and were meeting setpoints even with the current conditions. See pictures 2. The speed controller for the exhaust fan is failed. This should not be a speed controller nor should the customer have access to control the fan. The fan should be interlocked with the Daikin hvac unit operation. The fan motor is good. 3. The entrance location and the rear room are considered part of Food storage/prep and tack room but they also use the rear room for isolating a dog. Both of these rooms require air to be exhausted directly through roof to outdoors like the kennel area but they currently are not. These areas have no return or exhaust air flow. See attached page 33 4. The ducting from the Daikin unit is supplied to the food storage/prep and tack room but with no exhaust or return air there is minimal airflow. The ducting on roof is non-insulated to these two rooms. The PTAC unit is currently operating to condition the rooms. For #3 and #4 I recommend installing an exhaust fan in the bathroom to vent through the roof and installing pass through grilles from the tack room and food prep room and to insulate the duct on the roof. This would allow for no interference of unwanted outside air and smells transferring from the kennel to the other two rooms while also allowing proper supply of airflow from the Daikin hvac unit to the rooms.

More opportunities from Department Of The Navy → Navfac Washington

Same awarding agency