Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Energy was posted on May 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NOTICE OF INTENT TO SOLE SOURCE-KY7A LOAD TAP CHANGER RETROFIT SERVCIES

Closed
26WA159390Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Federal
Load TestingThe Department of Defense is conducting market research through a Sources Sought notice to identify qualified small businesses capable of providing annual proof testing and load test services for critical aerospace ground equipment used with the C-5 Galaxy aircraft. The testing will focus on engine handling and Auxiliary Power Unit (APU) hoisting equipment, including bootstrap beam assemblies, bootstrap beam hoists, and APU lifting hoists located at Westover Air Reserve Base, Massachusetts. The government intends to establish a five-year Blanket Purchase Agreement to cover this recurring maintenance requirement, which includes structural and mechanical proof load testing, non-destructive inspections to certify equipment integrity, and providing official certification documentation. Interested vendors must submit a capability statement by June 30, 2026, detailing company information, socioeconomic status under NAICS 811310, relevant technical expertise with AGSE or comparable equipment, and examples of past performance with similar load testing contracts. Vendors must clarify whether testing will be conducted on-site at Westover ARB or off-site at a certified facility, as transportation capabilities may be required. This opportunity is set aside for total small business participation, and responses must be submitted electronically to the Department of Defense point of contact, Robert E. Stacy, by the specified deadline. The notice is strictly for information gathering and does not constitute a commitment or solicitation for proposals.
FA6606 439 Conf Pk

POSTED

1 day ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The Department of Energy’s Western Area Power Administration (WAPA) plans to award a sole source contract to Reinhausen Manufacturing, Inc. for the retrofit services of a KY7A load tap changer (LTC) at the Headgate Rock Substation in Parker, Arizona. Reinhausen is uniquely qualified as the sole provider of the specific parts and advanced vacuum-operated LTC technology required for this service. The retrofit aims to enhance future availability of OEM parts and reduce maintenance costs and service intervals. The scope includes mobilizing to the site, comprehensive pre- and post-testing of the LTC and transformer, inspection and leak detection, oil draining and analysis, removal of the existing LTC, installation of the new RMV-II LTC with necessary welding and electrical connections, re-gasketing, control cabinet relocation, welding cleanup, sealing, pressure testing, vacuum and oil filling, final operational testing, and provision of reports and as-built drawings. This procurement falls under NAICS code 811310 for industrial machinery repair and maintenance with a small business size standard of $12.5 million and will be conducted under simplified acquisition procedures. The notice is for market research and informational purposes; it is not a solicitation for competitive quotes and no public bid package will be issued. Interested parties may submit capability statements by the specified deadline to demonstrate their qualifications, though the Government retains sole discretion on whether to compete. All inquiries and responses must be submitted via email, and any costs incurred in responding are the sole responsibility of the respondent.

General Info

WAPA to sole source retrofit KY7A load tap changer at Headgate Rock Substation.

Agency

Department Of Energy → Western-Desert Southwest Region

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance View NAICS

Place of Performance

Parker, AZ, 85344, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Western-Desert Southwest Region
Contacts1 person available
OfficePHOENIX, AZ, 85009, USA
Organization / Agency
Department Of Energy → Western-Desert Southwest Region
Office AddressPHOENIX, AZ, 85009, USA
Contacts
Reyes-Wiltz Georgette Flores

Full Description

Show more

Notice of Intent to Sole Source: Headgate Rock KY7A Load Tap Changer Retrofit Services – Reinhausen Manufacturing, Inc.


The Department of Energy (DOE) / Western Area Power Administration (WAPA) intends to issue a sole source award, under the authority of RFO FAR 12.201-1 Simplified Procedures for Certain Commercial Items Certain Commercial Items (IAW 41 U.S.C.1901 Simplified Acquisition Procedures), to Reinhausen Manufacturing, Inc. of Humboldt, TN.


This is a sole source acquisition to Reinhausen Manufacturing Inc. as they are the only vendor that can provide the required parts and service needed to repair a KY7A load tap changer (LTC)- serial number C-05324-5-1 located at WAPA Desert Southwest Region’s Headgate Rock Substation located in Parker, AZ. Reinhausen Manufacturing is uniquely qualified to provide the technologically advanced vacuum operated load tap changer (VLTC) bolt on replacement, increasing availability for future original equipment manufacturer (OEM) parts and services to WAPA while reducing maintenance costs and service intervals.


Scope of Services shall include:


  1. Mobilize crew and equipment to Headgate Rock Substation.
  2. Perform pre-job brief to identify hazards and proper isolation, switching and grounding
  3. Stage Equipment.
    1. Arrester stand-offs above the “load tap changer (LTC)” may need to be temporarily removed for the retrofit.
  4. Perform pre-testing in as found tap position for baseline
    1. Doble power factor overall, bushings, C1 and C2
    2. TTR in all OLTC taps
    3. Winding Resistance in all OLTC taps
    4. Insulation Resistance (Megger)
    5. Main and Core
    6. Oil Analysis (Dielectric (D1816), Acid (D974), IFT (D971 or D2285), Color (D1500), Visual (D1524), Water (D1533), PF (D924), and Dissolved Gas Analysis)
  5. Perform Inspection of Unit
  6. Identify Leaks
  7. Drain main tank oil into the contractor’s supplied oil storage
  8. Drain LTC oil into customer supplied drums or totes
    1. Customer to dispose of waste oil and drums/totes
  9. Perform an initial dew point (12hr, minimum measurement. Review results with WAPA’s technical representative.
  10. Perform an internal inspection of the transformer and LTC leads to determine “as is” condition and to identify any potential problems or issues.
  11. Retrofit new LTC to transformer:
    1. Identify, label, and disconnect all leads at LTC board
    2. Remove existing LTC from main tank
      1. WAPA to dispose of LTC mechanism, compartment, etc.
    3. Install New RMV-II with transition throat to main tank via welding
    4. Make lead extension connections from windings to LTC board as necessary.  Install any supports, clamps, spacers as necessary to maintain clearance.
    5. Wrap Connections and verify clearances for required voltage level modification of existing leads, terminals, or flange.
  12. Re-gasket all manholes accessed during project.
  13. Relocation of control cabinet:
    1. Determinate and remove items in the existing control cabinet
    2. Label wiring for reconnection
    3. Transfer components to new cabinet and terminate wiring
      1. Customer to dispose of original cabinet
  14. Clean up welds and repaint as needed
  15. Seal unit and pressure test for leaks.  All accessed manholes will be re-gasketed.
  16. Perform dew point test to determine dryness of insulation
    1. Max acceptable limit is 1%
    2. If dewpoint exceed 1%, field dry out will be required
      1. Associated cost of field dry-out will be at the expense of WAPA based on initial baseline dewpoint reading and final
  17. Perform final vacuum and oil filling:
    1. Vacuum 48 hours at 1 Torr or less
    2. Perform Vacuum leak test
    3. Fill unit with de-gas oil at 60deg C +/-5”, without exceeding 5Torr
    4. Break Vacuum with dry air
  18. Bleed all areas required
  19. Perform final testing:
    1. Doble power factor overall, bushings, C1 and C2
    2. TTR in all OLTC taps
    3. Winding Resistance in all OLTC taps
    4. Insulation Resistance (Megger)
    5. Main and Core
    6. Oil Analysis (Dielectric (D1816), Acid (D974), IFT (D971 or D2285), Color (D1500), Visual (D1524), Water (D1533), PF (D924), and Dissolved Gas Analysis)
    7. Operational check of LTC controls
  20. Review results with WAPA
  21. Provide report, test results, as-built drawings and revised existing drawings
  22. Clean area and prepare for demobilization of crew and equipment

The resulting procurement will be conducted in accordance with RFO FAR Part 12. The North American Industry Classification System (NAICS) code for this acquisition is 811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance with a small business size standard of $12.5 million.


This synopsis of the proposed contract action/notice of intent is for information and market research purposes only. THIS IS NOT A REQUEST FOR COMPETITIVE QUOTES. No solicitation package will be publicly issued. Responsible sources may submit a capability statement in response to this requirement, which shall be considered by the Agency. Capability statements must be received no later than the due date and time specified on this notice. Responses must be supported with clear and convincing evidence that clearly articulate the company's ability to satisfy the Government's requirements. A determination by the Government not to compete based upon responses to this notice is solely within the discretion of the Government. Inquiries will only be accepted via e-mail to Georgette Reyes-Wiltz at reyeswiltz@wapa.gov. No telephone requests will be honored.


If parties choose to respond, any cost associated with preparation and submission of data or any other cost incurred in response to this announcement are the sole responsibility of the respondent and will not be reimbursed by the Government.