Pearblossom Concrete Pad Replacement (OM-SFD-2026-003)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Water Resources is seeking a contractor for the Pearblossom Concrete Pad Replacement project, identified as OM-SFD-2026-003. The scope of work involves the demolition and removal of an existing concrete pad at the Pearblossom Pumping Plant in Los Angeles County and the installation of a new replacement pad for a KYB Transformer. All project activities, including access and execution, will take place within the DWR right of way. The new concrete pad must measure 24 feet by 28 feet with a height of 18 inches and be poured using a concrete truck. To ensure seismic stability, the contractor must excavate the sub-surface to approximately 36 inches to accommodate a 48 inch thick stable pad. This project is classified as routine maintenance under CEQA Class 1 for existing facilities and is expected to have no environmental impacts. The project is categorized under NAICS code 237990 and is managed by the DWR Division of Operations and Maintenance.

General Info

Replace existing pad with larger seismic-resistant concrete pad for KYB Transformer at Pearblossom Pumping Plant.

Agency

California Water Resources, Department of

Place of Performance

116th Street E, Pearblossom Hwy, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Janine BeckEnvironmental Scientist
Sara LowryEnvironmental Program Manager

Full Description

Show more
Department of Water Resources (DWR) and Contractor will demolish and remove an existing concrete pad and pour a new pad of the same size for a KYB Transformer at the Pearblossom Pumping Plant. The concrete pad will be 24 feet x 28 feet x 18 inches high poured by concrete truck. The sub surface will be excavated to approximately 36 inches to make room for a 48 inch thick seismically stable pad. All access and work is within DWR right of way.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
C26863031 CASWELL MEMORIAL STATE PARK - Campground and Day Use Improvements
Solicitation # C26863031
The California Department of Parks and Recreation is soliciting bids for contract C26863031 to upgrade the campground and day use areas at Caswell Memorial State Park in San Joaquin County. This lump sum project, with an engineer's estimate between 4.2 million and 5.8 million dollars, requires the contractor to provide all labor, materials, and equipment to perform work including asphalt demolition, clear and grub operations, and AC overlay. The project must be completed within 365 calendar days from the notice to proceed, with a maximum of 30 days allocated for punch list items and final completion. Eligible bidders must hold a Class A and/or B license and be registered with the Department of Industrial Relations per SB 854. Award is based on the low price method, though incentives are provided for Disabled Veteran Business Enterprise participation exceeding the mandatory 6 percent goal, subject to a 100,000 dollar cap. Certified small businesses may also receive a 5 percent preference. Bids must be submitted electronically in PDF format to the designated email address by the specified deadline. The contractor is responsible for adhering to local prevailing wage rates, ADA compliance, and strict material storage and labeling standards. Quality control will be managed through on-site inspections, required testing logs, and the use of approved mockups to establish aesthetic and workmanship standards.
California Department of Parks & Recreation

POSTED

about 5 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 7 hours ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS