This Solicitation opportunity from Department Of Defense was posted on October 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Solicitation W912PM26RA004 is a request for proposals for the Philpott Dam Anchors and Instrumentation Construction project located in Philpott, Virginia. Managed by the U.S. Army Corps of Engineers Wilmington District, the project has an estimated construction magnitude between $5,000,000 and $10,000,000. The scope of work involves critical structural stabilization and monitoring enhancements, including the installation of spillway anchors, inclinometer core drilling and casing, vibrating wire load cells, and the automation of crack gauges and piezometers. The performance period is established at 640 calendar days from the date of the notice to proceed.
The contract will be awarded based on best overall value, with Technical Approach and Key Personnel weighted as the most significant factors, followed by Past Performance and the Small Business Participation Plan, with Price being the least important factor. Proposals must be submitted electronically in two distinct volumes: Volume I for Price and Administrative data, and Volume II for Technical and Past Performance. Strict page limits are enforced, with Volume I capped at 50 pages and Volume II at 100 pages.
Key requirements include the provision of 100 percent performance and payment bonds and adherence to Davis-Bacon Act prevailing wage rates. Contractors must follow rigorous quality control and inspection standards, including pre-installation acceptance testing for sensors and compliance with ASTM and ICC standards. Administrative requirements include monthly invoicing via Wide Area Work Flow and strict adherence to hazardous waste packaging and labeling regulations per 49 CFR.
General Info
USACE project for Philpott Dam stabilization and instrumentation, valued between $5M and $10M.
HighAI Summary for Amendment 0003 to Solicitation W912PM26RA004: This document is Amendment 0003 to Solicitation W912PM26RA004, effective May 8, 2026. It extends the proposal due date from June 19, 2026, to June 29, 2026, and provides updated specifications. All other terms and conditions of the original solicitation remain unchanged. The amendment requires acknowledgment by offerors prior to the new due date.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0003 to Solicitation W912PM26RA004 for Philpott Dam Anchors and Instrumentation: This document is Amendment 0003 dated 16 June 2026 for Solicitation W912PM26RA004 concerning the Philpott Dam Anchors and Instrumentation project in Henry and Franklin Counties, Virginia. It details technical changes to specifications including revised sections on summary of work, project schedule, temporary construction facilities, spillway anchors, and instrumentation. It also includes changes to drawings with revised sheets replacing previous versions. Key updates involve equipment removal protocols for lake level rises, work hour constraints, barge mooring engineering analysis, and detailed measurement and calibration requirements for anchors and monitoring instruments. The amendment ensures compliance with safety and engineering standards and requires contractor coordination with the Contracting Officer.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0004 to Solicitation W912PM26RA004: This document is Amendment 0004 to Solicitation W912PM26RA004, effective 29 June 2026. It serves as an in-scope amendment extending the proposal due date from 29 June 2026 to 6 July 2026. All other terms and conditions of the original solicitation remain unchanged and in full force and effect. The amendment requires acknowledgment by offerors prior to the new due date.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0005 to Solicitation W912PM26RA004: This document is Amendment 0005 to Solicitation W912PM26RA004 dated 13 April 2026, issued by the US Army Corps of Engineers. The amendment, effective 29 June 2026, extends the proposal due date from 6 July 2026 to 14 August 2026. It includes instructions for acknowledging the amendment and states that all other terms and conditions remain unchanged. The document also references incorporated attachments and specifications as part of the contract.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 01 to Solicitation W912PM26RA004: This document is Amendment 01 to Solicitation W912PM26RA004 dated 13 April 2026, issued by W074 ENDIST Wilmington KO Contracting Division. The amendment, effective 08 May 2026, incorporates the site visit sign-in sheet and the site visit PowerPoint presentation into the solicitation. It does not extend the offer receipt date. All other terms and conditions of the original solicitation remain unchanged. The amendment requires acknowledgment by offerors prior to the specified receipt date to avoid rejection of offers.
PDF
PDF, High priority: read this firstsow
HighAI Summary for B9 Enclosure 3 General Proposal Submission and Tabbing Requirements: This document, titled Enclosure 3: General Proposal Submission and Tabbing Requirements, provides detailed instructions for the preparation and submission of proposals in accordance with FAR Clause 52.215-1. It outlines submission methods, formatting requirements, proposal structure divided into two volumes (Price & Administrative and Technical & Past Performance), and specific tab content for each volume. The document emphasizes the importance of submitting best offers initially, prohibits inclusion of pricing in Volume II, and details evaluation criteria for technical approach and risk management. It also specifies page limits, file naming conventions, and contact points for submission. The document is critical for offerors to understand submission protocols and evaluation factors for the solicitation.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Enclosure 3: General Proposal Submission and Tabling Requirements (Amendment 8): This document provides detailed instructions for the preparation and submission of proposals for solicitation W912PM26RA004. It specifies a two-volume submission structure: Volume I (Price & Administrative) and Volume II (Technical & Past Performance), including strict page limits and tab requirements. It outlines specific submission requirements for Factor 2 (Technical Approach), covering site management, drilling/installation, risk management, and scheduling, and defines the evaluation criteria for technical merit.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Modification No. 1 to Virginia DBA Wage Determination VA20260025: This document is Modification No. 1 to the Davis-Bacon Act (DBA) wage determination VA20260025 for heavy construction in specified Virginia counties and independent cities. Published on 05/18/2026, it revises non-collectively bargained prevailing wage and fringe benefit rates effective 12/13/2024. It lists updated wage rates for various construction-related labor classifications such as truck drivers, equipment operators, laborers, electricians, and carpenters. The document includes notes on Executive Orders 13706 and 13658 regarding paid sick leave and minimum wage requirements for federal contractors. It also explains union and survey rate identifiers and the wage determination appeals process.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for Modification No. 1 to Virginia DBA Wage Determination VA20260026: This document is Modification No. 1 dated 05/18/2026 to the Davis-Bacon Act (DBA) wage determination VA20260026 for heavy construction types in specified Virginia counties and independent cities. It updates prevailing wage rates and fringe benefits for various construction-related labor classifications such as crane operators, truck drivers, laborers, electricians, and others. The document includes notes on Executive Orders 13706 and 13658 regarding paid sick leave and minimum wage requirements for federal contractors. It also explains the classification rate identifiers and the wage determination appeals process. This modification supersedes the original wage determination published on 01/02/2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Philpott Dam Anchors and Instrumentation 043373 - Specifications: Technical specifications for the Philpott Dam Anchors and Instrumentation project (043373). The document includes a project table of contents covering general requirements, concrete, metals, electrical, earthwork, and utilities. Specifically, Section 01 11 00 outlines the summary of work, which involves installing spillway anchors, automated anchor load sensors, inclinometers, and automating crack gauges and piezometers at Philpott Lake Dam in Virginia. It includes details on site occupancy, underground utility location, and lake operation information.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Philpott Dam Anchors and Instrumentation 043373 - Specifications: Technical specifications for project 043373 at Philpott Lake Dam, Virginia. The scope includes the installation of spillway anchors, automated anchor load sensors, inclinometers in monoliths 9 and 13, and the automation of crack gauges and piezometers. The document includes a detailed project table of contents covering general requirements, concrete, metals, electrical, earthwork, and utilities, as well as a summary of work and site-specific operational constraints.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Solicitation Amendment W912PM26RA0040002 Amendment 2: This document is Amendment 2 to Solicitation W912PM26RA0040002, effective May 8, 2026. It extends the proposal due date from June 9, 2026, to June 19, 2026, and extends the period of performance from 365 to 640 days. The amendment adds FAR clause 52.222-90 addressing DEI discrimination by federal contractors and updates wage determinations. It also modifies delivery information for multiple CLINs, extending their delivery periods accordingly. The amendment includes changes to contract clauses, deleting and adding specific FAR and DFARS clauses. All other terms and conditions remain unchanged.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Solicitation Amendment W912PM26RA0040006: This document is Amendment 0006 to Solicitation W912PM26RA004 issued by the U.S. Army Corps of Engineers Wilmington District. Effective date is 29 June 2026. The amendment extends the proposal due date from 14 August 2026 to 9 October 2026 and announces a Pre-Proposal Conference (industry day) on 10 August 2026 at 10:00 AM EST, which can be attended in person or via Microsoft Teams. The amendment includes instructions for acknowledging receipt and RSVP details for the conference. All other terms and conditions remain unchanged.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Solicitation Amendment W912PM26RA004 Amendment 0008: Amendment 0008 to solicitation W912PM26RA004, issued on 05 Oct 2026 by the USACE Army (W072 ENDIST WILMINGTON). The purpose of this amendment is to update Enclosure #3 and extend the proposal submission deadline from 09 October 2026 to 16 October 2026.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Solicitation W912PM26RA0040003 - Philpott Dam Anchors and Instrumentation Construction: This document is a solicitation for sealed bids (IFB) issued on 13 April 2026 for the Philpott Dam Anchors and Instrumentation Construction project located in Philpott, Virginia. The project magnitude is estimated between $5,000,000 and $10,000,000. It includes instructions for offerors, submission deadlines (29 June 2026 at 1:00 PM local time), and requirements such as performance and payment bonds. The solicitation number is W912PM26RA0040003. The document also references amendments and includes contact information for inquiries. Proposals must be submitted electronically, and the document contains standard forms and clauses relevant to the construction contract.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Solicitation W912-PM-26-RA004 Philpott Dam Anchors and Instrumentation Construction: This document is a solicitation (RFP) for the Philpott Dam Anchors and Instrumentation Construction project, issued in March 2026 under solicitation number W912-PM-26-RA004. It includes detailed engineering plans and certifications for civil, structural, electrical, and instrumentation disciplines, with professional engineers responsible for the work. The document outlines general and technical notes, installation requirements, and compliance with standards such as NFPA 70 (NEC). It serves as the primary solicitation for contractors to bid on the construction and instrumentation work at Philpott Dam in Virginia, including temporary electrical provisions and detailed panelboard installation instructions.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Solicitation W912-PM-26-RA004 Philpott Dam Anchors and Instrumentation Construction: This document is a solicitation for the Philpott Dam Anchors and Instrumentation Construction project, identified by Solicitation No. W912-PM-26-RA004, issued in March 2026. It includes plans, certifications, and technical details for electrical, instrumentation, civil, geotechnical, and structural work. The document contains professional engineer certifications, project location maps, and detailed sheet notes for electrical installation and instrumentation. It serves as a primary solicitation ready for advertisement, providing critical technical specifications and instructions for contractors.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Solicitation W912PM26RA004 - Philpott Dam Anchors and Instrumentation Construction: This document is a solicitation for sealed bids (IFB) issued on April 13, 2026, for the construction project titled 'Philpott Dam Anchors and Instrumentation Construction' located in Philpott, Virginia. The project magnitude is estimated between $5,000,000 and $10,000,000. It includes instructions for electronic proposal submission, requirements for performance and payment bonds, and specifies the bid due date as July 6, 2026, at 1:00 PM local time. The solicitation references multiple amendments and includes detailed contracting and procurement requirements, including representations and certifications to be returned with proposals. The document also contains a list of drawing sheets and wage determinations relevant to the project.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Solicitation W912PM26RA004 - Philpott Dam Anchors and Instrumentation Construction: This document is a Solicitation for sealed bids (IFB) issued on 13 April 2026 for the project titled 'Philpott Dam Anchors and Instrumentation Construction' located in Philpott, Virginia. The solicitation number is W912PM26RA004, and the estimated construction magnitude is between $5,000,000 and $10,000,000. It includes instructions for electronic proposal submission, requirements for performance and payment bonds, and specifies the due date for sealed offers as 06 July 2026 at 1:00 PM local time. The document also references multiple amendments and incorporates various sections such as representations and certifications, instructions to offerors, and a list of drawing sheets. The contracting officer and offeror details are provided, along with contract award procedures and terms.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Solicitation W912PM26RA004 - Philpott Dam Anchors and Instrumentation Construction: This document is a Solicitation for sealed bid (IFB) number W912PM26RA004 issued on 13 April 2026 for the construction project titled 'Philpott Dam Anchors and Instrumentation Construction' located in Philpott, Virginia. The project magnitude is estimated between $5,000,000 and $10,000,000. It includes instructions for electronic proposal submission, mandatory performance and payment bonds, and specifies the offer due date as 09 October 2026 at 1:00 PM local time. The solicitation contains detailed contract terms, offeror instructions, and references to incorporated sections such as representations and certifications. Amendments to the solicitation are acknowledged with dates ranging from May to June 2026. The document also includes a list of drawing sheets and specifications as part of the contract.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Solicitation W912PM26RA004 - Philpott Dam Anchors and Instrumentation Construction: This document is a solicitation for sealed bids (IFB) issued on April 13, 2026, for the construction project titled 'Philpott Dam Anchors and Instrumentation Construction' located in Philpott, Virginia. The project magnitude is estimated between $5,000,000 and $10,000,000. The solicitation number is W912PM26RA004. It includes instructions for electronic proposal submission, requirements for performance and payment bonds, and specifies the bid due date as June 19, 2026, at 1:00 PM local time. The document also references amendments 0001 and 0002 dated May 8, 2026, and contains sections on procurement and contracting requirements, list of drawing sheets, and wage determinations. The solicitation emphasizes that proposals must be submitted electronically and outlines contact information for inquiries.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Solicitation W912PM26RA004 - Philpott Dam Anchors and Instrumentation Construction: This document is a Solicitation for sealed bids (IFB) issued on April 13, 2026, for the construction project titled 'Philpott Dam Anchors and Instrumentation Construction' located in Philpott, Virginia. The project magnitude is estimated between $5,000,000 and $10,000,000. It includes detailed contract line item numbers (CLINs) for various construction tasks such as mobilization, drilling, sensor installation, and electrical panel installation. The solicitation requires electronic submission of proposals by June 9, 2026, at 1:00 PM local time, with performance to begin within 10 calendar days after notice to proceed and completion within 365 calendar days. Performance and payment bonds are required. The document includes instructions to offerors and references to related sections and drawings.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for VA02060025 Modification No. 1 - Wage Determination: General Wage Decision Number VA02060025, Modification 1, published on 05/18/2026. This document establishes the prevailing wage and fringe benefit rates for heavy construction in specific Virginia counties and independent cities (Bland, Carroll, Dickenson, Grayson, Henry, Lee, Russell, Wise, Wythe, Martinsville, Norton, and Galax). It includes specific rates for truck drivers, power equipment operators, laborers, electricians, cement masons, and carpenters, and provides guidance on Executive Orders regarding paid sick leave and minimum wage.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for VA02060026 Mod 1 - Wage Determination (Virginia): General Decision Number VA02060026, Modification No. 1, published May 18, 2026. This document specifies the prevailing wage rates and fringes for heavy construction in various Virginia counties and independent cities, including rates for crane operators, truck drivers, power equipment operators, laborers, electricians, and cement masons.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for W912PM26RA0040007 - Philott Dam Anchors and Instrumentation Construction: Solicitation W912PM26RA0040007 issued on 13 APR 2026 for the Philott Dam Anchors and Instrumentation Construction project in Philott, Virginia. The project magnitude is estimated between $5,000,000 and $10,000,000. Proposals are due by 01:00 PM on 09 OCT 2026. Performance is required to begin within 10 calendar days and be completed within 640 calendar days after award.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for W912PM26RA004 Enclosure 3: General Proposal Submission and Tabling Requirements: This document provides detailed instructions for the preparation and submission of proposals for solicitation W912PM26RA004. It outlines a two-volume submission structure: Volume I (Price & Administrative) and Volume II (Technical & Past Performance), including specific tab requirements, page limits, and electronic submission protocols. It also details the submission and evaluation criteria for Factor 2: Technical Approach, focusing on site management, drilling/installation, risk management, and project scheduling.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for W912PM26RA004 - Philpott Dam Anchors and Instrumentation Construction: Solicitation W912PM26RA004 issued on 13 APR 2026 for the Philpott Dam Anchors and Instrumentation Construction project in Philpott, Virginia. The project magnitude is between $5,000,000 and $10,000,000. It includes a performance period of 640 calendar days and requires electronic submission of proposals by 16 OCT 2026. The document contains a CLIN schedule including mobilization and inclinometer core drilling.
PDF
PDF, High priority: read this firstproposal-data-sheet
HighAI Summary for W912PM26RA004 Proposal Data Sheet: This document is Attachment 1: Proposal Data Sheet for Solicitation Number W912PM26RA004, titled Philpott Anchors and Instrumentation Construction. It collects essential offeror information including legal business name, address, contact details, Unique Entity ID, CAGE Code, and Tax ID Number. It also identifies authorized negotiators for the proposal, includes a statement of agreement to the solicitation terms, and provides space for joint venture or team member information if applicable. The document concludes with a certification section for the authorized signatory to validate the proposal submission.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for W91P2PM26RA004 Amendment 0007: Amendment 0007 to solicitation W91P2PM26RA004, issued by the USACE Wilmington District on August 21, 2026. The purpose of this amendment is to provide updated specifications, updated Enclosure #3 (General Proposal Submission and Tabbing Requirements), current Wage Determinations, and updated project instructions. It also includes details regarding a Pre-Proposal Conference scheduled for August 10, 2026, and specifies a project magnitude between $5M and $10M.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Wage Determination VA20260025 for Heavy Construction in Virginia: This document is Wage Determination VA20260025 dated January 2, 2026, for heavy construction projects including sewer and water lines in specified counties and independent cities in Virginia. It supersedes VA20250025 and includes updated prevailing wage rates for various construction trades such as carpenters, electricians, laborers, power equipment operators, and truck drivers. The document references compliance with Executive Orders 13706 and 13658 regarding paid sick leave and minimum wage requirements for federal contractors. It explains the classification of wage rates including union, survey, union average, and state adopted rates, and outlines identifiers used for these classifications. The document also mentions the wage determination appeals process and the applicability of labor standards contract clauses.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Wage Determination VA20260026 for Heavy Construction in Virginia: This document is the Wage Determination VA20260026 dated January 2, 2026, for heavy construction projects including sewer and water lines in specified counties and independent cities in Virginia. It supersedes the previous wage determination VA20250026. The document lists prevailing wage rates and fringe benefits for various construction labor classifications such as crane operators, carpenters, electricians, laborers, power equipment operators, truck drivers, and welders. It includes notes on compliance with Executive Orders 13706 and 13658 regarding paid sick leave and minimum wage requirements for federal contractors. The document also explains union rate identifiers, union average rate identifiers, survey rate identifiers, and state adopted rate identifiers used in the wage determination. This wage determination is critical for contractors to ensure compliance with labor standards on covered federal construction contracts.
PDF
PDF, Low prioritypresentation
LowAI Summary for Philpott Dam Anchors & Stability Project Presentation: This document is a presentation for the Philpott Dam Anchors & Stability Project, outlining the project orientation, history, and proposed project overview including spillway anchoring and instrumentation. It includes a discussion agenda, project location and dam characteristics, historical timeline, and technical findings related to alkali-silica reaction and spillway repair. The presentation also covers the scope for FY26 construction, acquisition approach under FAR Part 15, evaluation criteria, and points of contact. The document is intended for project stakeholders and potential bidders, with instructions for submitting inquiries via ProjNet by May 29, 2026.
PDF
PDF, Low prioritysite-visit-sign-in-sheet
LowAI Summary for Site Visit Sign-in Sheet for RFP W912PM26RA004 Philpott Dam Anchors and Instrumentation Construction: This document is a site visit sign-in sheet dated 5 May 2026 for the RFP No. W912PM26RA004 concerning the Philpott Dam Anchors and Instrumentation Construction project. It lists attendees with their names, company affiliations, and email addresses who participated in the site visit at 0800 AM EST. The sheet serves as a record of interested parties and potential bidders who attended the site visit related to this solicitation.
PROJECT TITLE: W912PM26RA004 - PHILPOTT DAM ANCHORS AND INSTRUMENTATION CONSTRUCTION
PROJECT LOCATION: PHILPOTT, VIRGINIA
SOLICITATION W912PM26RA004 - PHILPOTT DAM ANCHORS AND INSTRUMENTATION CONSTRUCTION
THE MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $5,000,000.00 AND $10,000,000.00.
-------------------------------UNRESTRICTED--------------------------------------------------------
HAND CARRIED PROPOSALS AND OTHER FORMS OF ELECTRONIC SUBMISSION, TO INCLUDE (CD-ROM) DISCS AND FACSIMILE TRANSMISSIONS, ARE NOT AUTHORIZED. ALL PROPOSALS MUST BE SUBMITTED ELECTRONICALLY PER ENCLOSURE 3: INSTRUCTIONS TO OFFERORS.
RETURN SECTION 00 45 00 REPRESENTATIONS AND CERTIFICATIONS WITH PROPOSAL.
VERBAL AND WRITTEN REQUESTS FOR INFORMATION MUST BE DIRECTED TO THE PERSON LISTED ABOVE. INQUIRIES AND REQUESTS THAT ARE DIRECTED TOANY OTHER PERSON MAY NOT BE RELAYED TO THE PROPER PERSON AND, THEREFORE, MAY NOT BE ANSWERED. SOLICITATION/TECHNICAL INQUIRIES VIA PROJNET IN SECTION 00 21 13.
More opportunities from Department Of Defense → W074 Endist Wilmington
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.