Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

PHNSY - WR152315 BLDG 3A Renovate Shop Space For C960N, JBPHH

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac HawaiiView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Hawaii
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Hawaii
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
This project proposes to renovate, reconfigure, and upgrade shop spaces within Building 3A. Project will be budged for FY23. Building 3A is a permanent, rectangular-shaped, one-story structure. It consists of concrete pier foundations and a concrete floor slab at grade, with concrete masonry unit exterior walls on three sides, steel structural framing, and a saw-tooth roof design. Building 3A consists of a large bay with a few rooms located on the outer perimeter, for a total area of 31,190 sqft. The main bay is separated into two evenly sized sections separated by a 20 foot tall wooden partition. One on side of the wooden partition is the CNIA nuclear area, and on the other side a training area comprised of three two-story portable structures utilized for classroom training. There are also three rooms on the North side of the building. Two are currently housing decommissioned equipment, and the other room houses more training, both classroom and hands-on. The scope of this project will include: 1. Renovation of two equipment storage rooms (compressor Rooms 1&2). The rooms contain large decommissioned equipment which may contain lead. Area requires disposal of the equipment and modernization of the area into training space. Disposal of the equipment may free up 1500SF of usable space. 2. Renovation of the restroom facility to include a mens and womens bathroom separately. Current restroom is a single stall unisex bathroom and is insufficient for the amount of workers in this facility. 3. Installation of new flooring in all four vision tower office spaces requires replacement. Floor tile is damaged, stained, and aged. 4. Renovation of auxiliary CTD training room to install HVAC system and replace flooring. 5. Construction of a permanent structure for freeze seal equipment maintenance with ... NOTE: description has been truncated, please see Project Note for full description.