RM19-1256 Repair and Upgrade Berths B10-B13, Phase 2 of 2, JBPHH

Forecast
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Project RM19-1256 involves the repair and reinforcement of Piers B10, B11, B12, and Wharf B13 at Joint Base Pearl Harbor-Hickam. These structures, dating back to 1937 and 1943, have deteriorated and currently fail to meet the modernized design standards for surface combatants and contemporary repair equipment as specified in the United Facilities Criteria. This second phase of the project aims to upgrade the berths to ensure they can accommodate modern naval requirements. Managed by Navfac Hawaii for the Department of the Navy, the project is currently in the forecast stage with an expected executability date by the second quarter of fiscal year 2026. The architectural and engineering award is slated for the third quarter of fiscal year 2024, with design funding provided via bulk funding through CNIC. Key administrative details include a pending categorical exclusion for environmental permits and the requirement for the architectural and engineering firm to handle hazardous materials.

General Info

Repair and reinforce Piers B10-B12 and Wharf B13 at Joint Base Pearl Harbor-Hickam.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Hawaii
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
This project proposes to repair and reinforce Repair Piers B10, B11, B12, and Repair Wharf B13 on Joint Base Pearl Harbor-Hickam (JBPHH). Initially constructed in 1937 (B10) and 1943 (B11-B13), the repair berths have become deteriorated and damaged and no longer accommodate the modernized designs of surface combatants and modern repair techniques and equipment, as identified in the United Facilities Criteria (UFC) 4-152-01 Design: Piers and Wharves.; Status Note (as of 20-SEP-23): AE Award FY24-Q3; Status Note (as of 28-SEP-23): (1) Executability by: FY26-Q2 (2) Design Funding: Bulk Funding CNIC (MAXIMO #HX7NLZ (Design) (3) DASN: Required, DD1391: Received 9/20/2023 (WON1645790) (4) Status: AE Award in FY24-Q3 (5) History: NONE (6) NEPA/Permits: CATEX Pending (WONXXX), (7) Other pertinent information: SAR NA, HAZMAT by AE

Similar Contracts

Same NAICS industry code

More opportunities from Department Of The Navy → Navfac Hawaii

Same awarding agency

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS