UPGRADE OF BASEWIDE STORM WATER DRAINAGE SYSTEMS
Active
FederalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
Department Of The Navy → Navfac Europe Africa CentralView Agency
NAICS
N/A
Place of Performance
USASet-Aside
SBA
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Show more
AgencyDepartment Of The Navy → Navfac Europe Africa Central
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available
Full Description
Show more
Several reports of flooded areas have been noted at multiple locations at NSA Souda Bay. According to the latest assessment report, certain drainage pipes are nearing their capacity to manage storm water. Consequently, the capacities of storm water systems, watercourses, and other drainage infrastructures may be exceeded on occasions. Effected areas throughout the base are B50, B93, B66, B97 and B43.Problem Description: B93 Flight-line elevation is higher than that of the pavement’s, north of the building. At the building’s main entrance there is no storm water pipes to help the area drain properly so storm water is cumulated creating ponds. Mission Impact: During storm events the water height might reach 15cm(6inch) making it difficult to enter the building without being wet. Proposed Solution: Install storm water drain pipes and divert water safely away from the building entrance. B66 Southeast corner Water is cumulated after storm events and is pooled next to the flight line B66 entrance door Water is cumulated outside the entrance door after rain events. B97 Swimming pool entrance Storm water is cumulated in front of the pool area. INCLUDES REPAIR ACTIONS RECOMMENDED BY T.O. N3319121F4427 FOR B214 ARGONAUT NORTH SIDE AREA. INCLUDES REPAIR ACTIONS RECOMMENDED BY T.O. N3319121F4427 FOR B214 ARGONAUT NORTH SIDE AREA. Problem Description: B43 Flight-line elevation is higher than that of the pavement’s, north of the building. At the building’s main entrance there is no storm water pipes to help the area drain properly so storm water is cumulated creating ponds. Mission Impact: During storm events the water height might reach 15cm(6inch) making it difficult to enter the building without being wet. Proposed Solution: Install storm water drain pipes and divert water safely away from t ... NOTE: description has been truncated, please see Project Note for full description.
More opportunities from Department Of The Navy → Navfac Europe Africa Central
Same awarding agency
