Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

UEM-211 Create Micro Grid, East Side Base

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Europe Africa CentralView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Europe Africa Central
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Europe Africa Central
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
CURRENT SITUATION: MUSE generators, connected to East camp’s network, could handle limited amount of load on feeder 6 at PP3 or feeder 4 at PP2 as the generators are old, more than 12 years, and there is no available parts in market to do overhaul. Besides most of backup generators in east side of camp are connected to only critical loads inside the buildings, not the entire load of buildings. This configuration in east side of camp creates a significant challenge to shedding the load or shaving peak in case of emergency at both power plant. REQUIREMENTS: Create a micro grid for all loads on feeders 6 @ PP3 and feeder 4 @ PP2 by installing five generators 2 MW, prime power type at same location for MUSE generators behind WWTP. 3- Create a redundant connection between Feeder 6 @ PP3 and feeder 11 @ PP2A by interception Feeder 6 with 6 way switch and connect to Switch (S1 @ PP2A) to connect more load to micro grid. 4- Follow the attached specification during creating the micro grid. IMPACT: 1- Failure to secure critical missions from power outage during emergency 2- Reduce energy security for critical missions.