Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on October 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Planning, Building, And Environmental Services (PBES) Remodel Project

Closed
PW 23-30State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 16 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, and compressed air systems. Additionally, the work includes a full NFPA-compliant fire suppression system, electrical distribution and lighting upgrades, building automation controls, and site improvements such as paving, drainage, and hazardous materials abatement. The estimated contract value is between 10 million and 25 million dollars, with a performance period of 730 days after award. The contract will be awarded based on the lowest price, with pricing required for two primary exhibit line items: building renovation and paving removal and replacement. Bidders must adhere to strict quality control standards, including a three-phase control system and specific technical standards such as MIL-STD-101 for piping and ASME A13.1 for color coding. Bonding requirements vary by proposal value, with projects over 150,000 dollars requiring bid, payment, and performance bonds. Administrative requirements include monthly invoicing via Wide Area Work Flow and compliance with the Davis-Bacon Act and the Americans with Disabilities Act. Proposals were due by November 23, 2026.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a firm-fixed-price design-build contract for the renovation and modernization of Transfer Facility Building 6594 at Naval Base Kitsap Bangor, Washington. With an estimated magnitude between 10 million and 25 million dollars, the project involves comprehensive demolition, the replacement of deteriorated components, and the construction of a 400 square foot addition for forklift battery charging. The scope includes critical upgrades to HVAC, fire protection, electrical systems, and the installation of a prefabricated paint booth and new bridge crane. A primary constraint is that the facility must remain operational and mission-capable throughout the process, requiring a strict two-phase execution plan with multiple mobilization and demobilization cycles. The project timeline requires work to commence within 15 calendar days of award, with the base bid completion due within 360 calendar days and an option period extending to 1,082 calendar days. Performance is subject to liquidated damages of 4,137 dollars per day for the base bid and 280 dollars per day for the option. Contractors must adhere to strict NAVFAC, UFC, and IBC standards, as well as cybersecurity and information safeguarding requirements under DFARS. Proposals must be submitted via the PIEE portal by December 7, 2026, and will be evaluated based on the most advantageous offer to the government, with a primary focus on price reasonableness.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 18 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and an underground stormwater retention system. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business set-asides and covers a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes the installation of drywall, joint finishing, and painting for approximately 300 square feet of floor area in utility rooms and hallways, along with the temporary removal and re-installation of HVAC equipment such as furnaces and water heaters. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Proposing contractors must provide itemized pricing, a detailed work plan including project phasing and occupied-building protection, and evidence of relevant experience. Award requirements include the provision of payment and performance bonding for the full project value, as well as general liability insurance with a minimum of 1 million dollars per occurrence, within ten days of award. Final acceptance is contingent upon the successful testing of all restored systems and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 3 hours ago

DEADLINE

in 3 days
NAICS: 236220
New
SLED
URI Washburn Hall Renovations Upper College Road Multi-Use Development Enabling
Solicitation # RFQ27007140
The University of Rhode Island is seeking a qualified general contractor for the Washburn Hall renovations and Upper College Road Multi-Use Development enabling work located at 75 Briar Lane in Kingston, Rhode Island. Under solicitation RFQ27007140, the project scope encompasses structural stabilization and reinforcement, selective demolition, and the renovation of office and conference rooms on the second and third floors. The work includes the installation of interior finishes, non-load-bearing steel framing, and gypsum board, along with necessary modifications to HVAC, electrical, telecommunications, fire protection, and fire alarm systems. All work must adhere to local and state building codes, with specific technical standards including NFPA 285 for fire safety and ACI 530.1/ASCE 6/TMS 602 for masonry tolerances. The contract is structured as an AIA A101-2017 Standard Form of Agreement, requiring both bid surety bonds and payment and performance bonds. Financial administration follows AIA Document G702 and G702A for progress payments, with the owner paying 95 percent of the amount due until substantial completion. Contractors must comply with Rhode Island Department of Labor and Training prevailing wage requirements, submitting certified payroll records monthly. Key personnel, including a project manager, superintendent, and safety engineer, must be assigned and identified during the pre-construction meeting. Deliverables include detailed shop drawings, coordination drawings, and product samples, with final acceptance contingent upon successful testing and inspection by the engineer and commissioning agent.
State of Rhode Island

POSTED

about 5 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Planning, Building, and Environmental Services (PBES) Remodel Project is a solicitation issued by the Napa County Department of Public Works for the renovation of the PBES Department on the second floor of the Administration Building in Napa, California. With an engineer's estimate of 1,300,000 dollars, the project aims to consolidate staff to improve security and collaboration. The scope of work includes modifications to the reception area, permit center, copy room, and cubicle layouts, as well as the addition of four private offices and two conference rooms and an upgrade to the building's fire alarm control panel. The contract will be awarded to the lowest responsive and responsible bidder who can demonstrate the successful completion of three government capital improvement projects within the last five years, including at least one in an occupied facility. Performance is scheduled to begin on November 17, 2026, with a critical completion deadline of April 1, 2027, to align with the availability of temporary relocation spaces for employees. To minimize disruption, normal working hours are set from 7:00 pm to 5:00 am, Monday through Friday. The contractor is required to provide a one-year guarantee from the date of acceptance and must adhere to strict insurance endorsements and bonding requirements, including a performance bond for 100 percent of the bid price. Bids must be submitted electronically via the OpenGov portal by October 20, 2026, at 11:30 am, with a physical bid security of at least 10 percent delivered to the Public Works Department.

General Info

Napa County solicitation for a $1.3 million PBES Department office remodel project.

Place of Performance

Napa, CA, 94559, USA

Set-Aside

NONE

Documents

4
PDF, High priority: read this first54 pages · ifb
High
PDF, High priority: read this first27 pages · specifications
High
PDF, High priority: read this first313 pages · sow
High
PDF, High priority: read this firstsow
High

Read all 4 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • TJ Hall Strategic ImprovementsOpen now
  • Building 262 Renovations FLETC GlyncoOpen now, due in 16 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Napa County
Contacts1 person available
OfficeN/A

Full Description

Show more
Bid #PW 23-30: $18

More opportunities from California → Napa County

Same awarding agency

NAICS: 541620
SLED
Napa County Regional Climate Action and Adaptation PlanThe Napa County Regional Climate Action and Adaptation Plan is a coordinated regional initiative led by Napa County in partnership with the cities of American Canyon, Calistoga, Napa, St. Helena, and the Town of Yountville, aimed at reducing greenhouse gas emissions and enhancing climate resilience across the county. The plan targets key emission sources including vehicle travel, electricity use, natural gas consumption, and local land use practices, with measurable strategies organized across sectors such as energy, transportation, waste, and land use. Implementation timelines span from near-term actions starting in 2026 to long-term goals extending through 2045, with annualized cost estimates ranging from $386,085 in 2030 to $718,500 by 2045, reflecting projected investments in emissions reduction and adaptation measures. The plan includes specific project actions with clear performance targets and financial projections, though it does not conform to traditional federal procurement structures or include standard FAR clauses, contract line items, or formal bid evaluation criteria. The plan requires rigorous environmental compliance under CEQA, Cal/OSHA, CALGreen, and state and federal endangered species protections, with mandatory biological surveys, qualified biologist oversight, and habitat conservation measures. Construction and project activities must adhere to strict protocols including equipment decontamination to prevent invasive species spread, use of certified weed-free materials, installation of tire track stations, and implementation of spill prevention plans. All personnel must undergo environmental training, and work may be halted immediately if special-status species are detected. Mitigation efforts must include permanent conservation of affected lands via easements, and coordination with CDFW and USFWS is required for any project impacting protected species or habitats. Submission of proposals is due by August 31, 2026, via email, postal mail, or through an online portal, with oversight coordinated by Jesse Gutierrez, Principal Planner – Sustainability at Napa County’s Department of Planning, Building and Environmental Services. While the initiative involves significant environmental and infrastructure investment, it is structured as a policy implementation framework rather than a competitive procurement, with no formal contracting officer, COR, COTR, payment office, or federal accounting identifiers designated.
Environmental Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Fulton Ranch Vineyard Agricultural Erosion Control Plan (ECPA) #P23-00326-ECPA
Solicitation # P26-00176-ECPA
The contract pertains to the implementation of an agricultural erosion control plan for the development of a 4.79-acre vineyard on three parcels within a larger 182.78-acre property in Calistoga, California, with approximately 3.66 net acres designated for planting in five distinct vineyard blocks. It authorizes land-disturbing activities on slopes exceeding 5%, including the clearing of oak woodland, Douglas fir forest, and ruderal vegetation within defined limits, as well as earthmoving, land contouring, and the installation and ongoing maintenance of erosion and runoff control measures necessary to support agricultural infrastructure. The project was approved by the Napa County PBES Director on July 14, 2026, and the associated plan is formally identified as ECPA #P23-00326-ECPA. The activity is governed under the jurisdiction of Napa County, with the place of performance specified as Calistoga, CA 94515, and the primary point of contact is Pamela Arifian, Planner III, who can be reached via email or phone for administrative and regulatory inquiries. Dirk Fulton, Manager and General Partner, is listed as a secondary contact, indicating direct ownership or operational involvement in the project. The plan is publicly accessible through the California Environmental Quality Act database via the linked online portal, ensuring transparency and compliance with state environmental standards. No set-aside or NAICS classification is applied, reflecting its status as a local agricultural development subject to county-level environmental review.
Environmental Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
1260 Shady Brook Vineyard Track I Agricultural Erosion Control Plan (ECPA) P25-00011-ECPA
Solicitation # P25-00011-ECPA
The project, identified as P25-00011-ECPA, involves the development of approximately 1.3 gross acres of vineyard within a 41.8-acre parcel located at 1260 Shady Brook Lane in Napa, California. Approved by Napa County on June 29, 2026, the scope of work includes land disturbing activities on slopes greater than 5%, the clearing of oak woodland and ruderal lands, earthmoving, land contouring, and the installation of agricultural infrastructure. The project is supported by a Mitigated Negative Declaration under CEQA, concluding that the development will not have a significant environmental effect provided specific mitigation measures are implemented. Key technical requirements include a soil loss analysis and hydrologic analysis to ensure that sediment delivery and peak runoff do not exceed pre-project levels. Environmental protections are central to the contract, requiring the preservation of oak woodlands, pre-construction surveys for Crotch's bumble bee between April and August, and the installation of protective fencing around Napa bluecurl and Green monardella populations. Additionally, a water availability analysis confirmed that groundwater demands for the vineyard are within the site's recharge capacity. The project is managed by Daniel and Deborah Chen and implemented by Applied Engineering, Inc., with oversight from the Napa County Planning, Building and Environmental Services Department.
Environmental Consulting Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 541330
SLED
230 Long Ranch Road LLC Vineyard Development Agricultural Erosion Control Plan #P24-00114-ECPA
Solicitation # P24-00114-ECPA
The 230 Long Ranch Road LLC Vineyard Development project, identified by Agricultural Erosion Control Plan #P24-00114-ECPA, involves the development of a vineyard on a 48.42-acre property in St. Helena, California. Approved by the Napa County PBES Director on June 8, 2026, the scope of work includes clearing vegetation, earthmoving, and land contouring to develop approximately 14.8 to 18.8 gross acres of vineyard, consisting of four vineyard blocks with approximately 12.1 to 15.8 net planted acres. The project specifically addresses land disturbing activities on slopes greater than 5% and requires strict adherence to erosion control measures to ensure no net increase in soil loss or runoff. Environmental compliance is a central component of the contract, governed by the California Environmental Quality Act (CEQA). A Mitigated Negative Declaration was adopted following a public review period from November 27 to December 27, 2025. Key environmental mandates include the retention of at least 3.0 acres of chamise alliance habitat and the preservation of 4.1 acres of Scrub Interior Live Oak habitat. The project also requires preconstruction surveys for nesting birds, protection of special-status plant species, and a three-year monitoring period for any replaced vegetation. Technical adequacy has been verified by the Napa County Engineering Division, and the project is subject to a specific grading season from April 1 through September 15. Administration of the project is handled on a time and materials basis, with the Napa County Planning Division overseeing inspections of fencing and habitat preservation before earthmoving begins.
Engineering Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Crush Partners Vineyard Track I Agricultural Erosion Control Plan Application (ECPA) P25- 00003-ECPA
Solicitation # P25-00003-ECPA
The Crush Partners Vineyard project, identified by permit P25-00003-ECPA, involves the development of approximately 18.3 gross acres of vineyard within a 27.98-acre parcel located on Wooden Valley Road in Napa, California. The scope of work includes clearing grassland, earthmoving with approximately 1,000 cubic yards of cut and fill, and the installation of erosion and runoff control measures on slopes greater than 5 percent. The project consists of 7.8 acres of replanted existing vineyard and 7.8 acres of new vineyard, totaling approximately 15.6 net planted acres. Performance requirements include maintaining a permanent cover crop and vineyard avenues with a minimum vegetation cover density of 75 percent to prevent soil loss and manage peak storm flow. The project was approved by Napa County on August 3, 2026, following a Negative Declaration under CEQA indicating no significant environmental impacts. Key technical requirements include a 35-foot setback from ephemeral streams, adherence to a grading season from April 1 through September 15, and preconstruction nesting bird surveys between February 1 and August 31. The project is supported by comprehensive analyses, including a Water Availability Analysis for groundwater use, a Landslide Hazard Evaluation, and a Biological Resources Reconnaissance Survey to protect oak woodlands and special-status species. Administrative terms specify that the applicant, Rob Lloyd, is responsible for all county processing fees, with payments due within 30 days of billing.
Environmental Consulting Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
AXR Napa Valley Winery - Major Use Permit Modification, Variance, and Viewshed
Solicitation # P22-00417
The AXR Napa Valley Winery project, approved by the Napa County Planning Commission on June 3, 2026, involves a major modification to Winery Use Permits P08-00099 and P04-0541. The scope of work includes the construction of a 17,190 square foot type I wine cave and the conversion of several existing structures for tasting and hospitality purposes, including a 1,492 square foot barrel storage building, a 1,204 square foot outdoor crush/tank pad, and the 4,147 square foot main floor of the historic Hirsch residence for office and tasting room use. These modifications are intended to support an expanded marketing program and an increase in both employees and visitor traffic at the St. Helena, California location. Infrastructure improvements are a central component of the project, featuring water and wastewater system upgrades and the installation of a left turn lane and driveway modifications on Highway 29. To facilitate these improvements, the project includes a variance to the 600-foot winery setback from SR 29 for aboveground wastewater structures and an Administrative Viewshed Permit for cave portals and utility improvements on slopes between 15 and 18 percent. The project is governed by a Mitigated Negative Declaration, with specific mitigation measures and monitoring plans adopted as conditions for approval. Administrative oversight is managed by Hannah Spencer of the Napa County Planning, Building, and Environmental Services Department.
Other Heavy and Civil Engineering Construction

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 111332
SLED
B&F Farms Vineyard Conversion $P25-00029-ECPA
Solicitation # P25-00029-ECPA
The project involves the conversion of approximately 120 acres in Yountville, California, into a vineyard, with 10.1 gross acres developed for planting and 7.4 net planted acres dedicated to vine cultivation. Activities include clearing diverse vegetation types such as non-native grassland, coyote brush scrub, coast live oak woodland, and knobcone pine forest, followed by earthmoving, installation of erosion and runoff controls, and development of agricultural irrigation infrastructure. All work is subject to strict seasonal limitations to protect sensitive species, particularly avoiding ground disturbance during the Northern Spotted Owl nesting season from February through July. Biological surveys for Clara Hunt’s milk-vetch and owl activity must be conducted by qualified biologists using protocols mandated by the California Department of Fish and Wildlife and the U.S. Fish and Wildlife Service, with reports submitted prior to any ground-disturbing activities. A 0.25-mile no-disturbance buffer must be maintained if active nests are detected, and an Incidental Take Permit under the California Endangered Species Act may be required if impacts to protected species cannot be fully avoided. The project is governed by California Environmental Quality Act (CEQA) compliance procedures and has been determined to proceed under a Mitigated Negative Declaration, contingent upon adherence to approved mitigation measures outlined in a Draft Mitigation Monitoring and Reporting Program. Regulatory oversight is administered by Napa County’s Department of Planning, Building, and Environmental Services, with Donald A. Barrella serving as the Principal Planner and primary point of contact. Compliance with the Migratory Bird Treaty Act, CDFW survey protocols, and potential Lake and Streambed Alteration Agreement requirements are mandatory. There is no formal federal contract structure, pricing data, or procurement evaluation criteria; instead, this is a local land-use permit requiring environmental mitigation and regulatory approvals. The project site is located in ZIP code 94558, and all submissions must be filed electronically through the CEQA Submit Portal or physically delivered to Napa County offices, with public review ending on May 29, 2026. No federal acquisition regulations, contract clauses, or financial terms apply, as this falls entirely under state and local environmental permitting authority.
Grape Vineyards

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Barnett Winery - Use Permit (P19-00125-UP), Viewshed Protection Program (P20-00121-VIEW), and Exception to the Road and Street Standards
Solicitation # P19-00125-UP
The Barnett Winery project seeks approval through Napa County to expand operations at its existing 20,000-gallon winery located at 4018/4070 Spring Mountain Road in Calistoga, California. The proposal includes remediation of unpermitted activities such as increased employee count, daily tours and tastings by appointment, marketing events, and on-premise outdoor wine consumption, which have triggered requirements for public water system upgrades, wastewater system improvements, and an exception to the Road and Street Standards for driveway modifications. Beyond compliance, the project proposes significant expansion: increasing annual wine production to 30,000 gallons, raising the full-time employee count to nine, intensifying visitor programs, constructing a new 1,700-square-foot hospitality building with a tasting room and office, adding parking spaces, installing a 12,000-gallon fire protection water tank, and implementing new landscaping, all subject to the stringent design and visual preservation requirements of the Viewshed Protection Program. Environmental compliance is central, with mandatory adherence to CEQA guidelines, implementation of a Mitigation Monitoring and Reporting Program, specific biological surveys to protect nesting raptors during seasonal restrictions, and strict control over stormwater, dust, and groundwater impacts in accordance with Napa County ordinances, California Fish and Game Code, and best management practices from CASQA and BAAD. The project has been processed under a land use permit framework rather than a traditional procurement contract, with no federal acquisition regulations, contract clauses, pricing structures, or procurement-specific terms such as LPTA or Best Value applied. Oversight is managed by Napa County’s Planning and Building Department, with Matt Ringel as the primary point of contact, and key approvals contingent upon engineering certification, environmental mitigation execution, and on-site compliance verification during construction and final inspection phases. All operations must align with existing groundwater protection standards, fire safety codes, and land use zoning restrictions, ensuring that growth is balanced with ecological and aesthetic preservation in the region.
Other Heavy and Civil Engineering Construction

POSTED

10 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS