Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Kentucky was posted on July 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Plumbing System Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
SLED
Install Pier D High Pressure Air System, NSBREM-724-A
Solicitation # N4425527RB003
Solicitation N4425527RB003 is a design-build project for the installation of a permanent high pressure air (HPA) system at Pier D, B724A of Naval Base Kitsap in Bremerton, Washington. The scope of work includes the design, construction, and commissioning of the system, specifically incorporating the existing HPA cross connection into a system supplied by HPA compressors on the south end of Pier D. The project requires the installation of HPA shore risers at five specific locations: East bollards 11, 59, and 101, and West bollards 47 and 59. All new piping must be installed under service grates with valves located topside, adhering to UFC and ASME codes, as well as MIL-STD101C for piping color coding. This is a 100% set-aside for 8(a) businesses located within SBA Region X, with an estimated construction magnitude between 1 million and 5 million dollars. The contract is a firm-fixed-price task order under the 8(a) Multiple Award Construction Contract (MACC), with a period of performance not to exceed 431 calendar days. Award is based on price and MACC past performance. Key requirements include strict adherence to EM 385-1-1 safety standards, cybersecurity integration per UFC 4-010-06, and rigorous base access and security protocols for all personnel and vehicles. Proposals must be submitted via the PIEE portal by December 1, 2026.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 19 days
NAICS: 238220
New
CBP#9772 HVAC Air Handling Unit (AHU) and Ductwork Cleaning Services
Solicitation # CBP#9772
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontracting opportunity, CBP#9772, to provide HVAC Air Handling Unit (AHU) and ductwork cleaning services at the Edison Job Corps Center in Edison, New Jersey. The scope of work includes the thorough cleaning of twelve AHUs and twenty-eight coils across the Kilmer and Edison dormitories, as well as the cleaning of supply, return, and outside-air ductwork. The contractor is responsible for providing and installing all necessary corrosion-resistant access panels, performing filter replacements, and restoring any affected ceiling surfaces. The estimated contract value ranges from $100,000 to $250,000, with a performance period of 90 consecutive business days following the written Notice to Proceed. Bids are due by November 17, 2026, and must be submitted via email. To be considered, bidders must conduct a mandatory physical site visit, provide a detailed cost breakout on company letterhead, and submit a bid bond guarantee of 20% for bids exceeding $25,000. Award decisions will be based on overall best value. The selected contractor must comply with Davis-Bacon prevailing wage determinations for Middlesex County and adhere to various Federal Acquisition Regulation (FAR) clauses regarding small business utilization, security requirements, and labor standards. Required deliverables include a pre-cleaning inspection with photographic documentation and a final project completion report for inspection and acceptance.
Edison Job Corps

POSTED

about 2 hours ago

DEADLINE

in 5 days
NAICS: 238220
New
CBP7787 ED1 RM 123 HVAC Compressor Replacement
Solicitation # CBP7787 ED1 RM 123
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to replace a failed HVAC/refrigeration compressor at the Sierra Nevada Job Corps Center in Reno, Nevada. The project, identified as CBP7787 ED1 RM 123, has an estimated value between 0 and 25,000 dollars. The scope of work is divided into four phases: preparation and environmental safety, demolition and removal, installation of an OEM-specified compressor with new filter-driers and heaters, and system testing and commissioning. Contractors must adhere to EPA Section 608 regulations for refrigerant recovery and ensure the system is pressure tested to at least 150 PSI and evacuated below 500 microns. Bids will be awarded based on overall best value, and a physical site visit is mandatory prior to submission. For bids equal to or greater than 25,000 dollars, a bid bond of 20 percent of the base bid is required, along with performance and payment bonds totaling 100 percent of the contract price. Required documentation includes a detailed bid breakout, a UEI number, and an SF1413 Statement and Acknowledgment form. Contractors must maintain general liability insurance of at least 1 million dollars and worker's compensation with employer's liability of 500,000 dollars. Compliance with Washoe County wage determinations and various FAR clauses, including Buy American and Combating Trafficking in Persons, is required. Final payment is subject to a 10 percent retainage until substantial completion, final inspection, and the delivery of all closeout documents and warranties.
Sierra Nevada Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 5 days
NAICS: 238220
New
MJCC Multiple HVAC Replacement System
Solicitation # mjcc-multiple-hvac-replacement-system
Education and Training Resources is seeking quotes for a turnkey subcontracting project to replace multiple HVAC systems at the Montgomery Job Corps Center in Montgomery, Alabama. The scope of work involves the removal of existing equipment and the installation of new systems across several buildings, including Building A (4-ton), Building B (7.5-ton), Building E (10-ton), Building F (two 4-ton units), and Building G (one 3.5-ton, one 4-ton, and one 7.5-ton unit). Technical specifications require the use of R-454B refrigerant, Energy Star systems with minimum EER ratings of 16, 90 percent efficiency furnaces, and Honeywell vision PRO 8000 programmable thermostats. Contractors must utilize testing and balancing services to ensure airflow meets original designs and provide a 5 to 10 year warranty on parts and a 2 year warranty on workmanship. This is a small business set-aside opportunity open to VOSB, SDVOSB, WOSB, and HUBZone certified entities. Bidders must provide a current SAM.gov UEI number, active registration, Alabama business licenses, a W-9, and FFATA forms. Submissions must include a detailed fee-for-service bid sheet, a proposed work schedule, and certificates of insurance. The project is subject to the Davis-Bacon Act for prevailing wages and adheres to FAR clauses regarding debarment, the Service Contract Act, and anti-lobbying certifications. Bonding requirements are tiered based on project value, requiring a 100 percent payment bond for projects over 35,000 dollars and both performance and payment bonds for projects exceeding 150,000 dollars. Bids are due by November 27, 2026, at 12:00 PM CST.
Montgomery Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 15 days
NAICS: 238220
New
Joliet Job Corps-Request for Quote HVAC Replacement Female Dormitory
Solicitation # joliet-job-corps-request-quote-hvac-replacement-female-dormitory
Management and Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontract to replace the HVAC system at the Joliet Job Corps Center female dormitory in Illinois. The project scope includes the removal and disposal of existing equipment and the installation of ten new Carrier furnace and air conditioning systems. Additionally, the contractor must install and integrate a Pelican Building Automation System (BAS) across eleven units, including the ten new systems and one existing unit. The estimated contract value ranges from $250,000 to $500,000. Bids must be submitted to Frances McGraw by November 23, 2026, and must include a detailed cost breakout, the MTC Bid for Lump Sum Contract form, and a completed supplier self-certification packet. A mandatory physical site visit is required prior to bid submission. Award decisions will be based on overall best value. For bids of $25,000 or more, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. The contract is subject to the Davis-Bacon Act, requiring compliance with specific Illinois prevailing wage rates and the submission of weekly certified payroll reports for payment. Contractors must maintain general liability insurance of at least $1,000,000 per occurrence and worker's compensation with employer's liability limits of $500,000. Compliance with various Federal Acquisition Regulations is required, including Buy American and anti-trafficking provisions. First-tier subcontractors with awards exceeding $45,000 must disclose any federal debarment or suspension status.
Joliet Job Corps

POSTED

about 2 hours ago

DEADLINE

in 11 days
NAICS: 238220
New
Centennial Dry Sprinkler System & Compressor Replacement Services
Solicitation # centennial-dry-sprinkler-system-compressor-replacement-services
Management & Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide dry-type sprinkler system and compressor replacement services at the Centennial Job Corps Center in Nampa, Idaho. The project scope focuses on eliminating system leaks and replacing failing infrastructure in the Men's Dormitory (Building CM), Women's Dormitory (Building CW), and the Recreation Building (Building D) to prevent equipment wear caused by air compressor short-cycling. Licensed contractors are required to perform demolition of existing piping and compressors, followed by testing and commissioning in strict accordance with NFPA 25 (2023 Edition) and original equipment manufacturer specifications. Bids are due by December 1, 2026, and will be evaluated based on overall best value. A mandatory physical site visit is required prior to submission. For bids equal to or greater than $25,000, contractors must provide a bid bond guarantee of 20% of the base bid, and the awarded contractor will be required to provide performance and payment bonds from an A-rated surety company. Submission requirements include a detailed cost breakout, proof of insurance, a completed SF 1413 form, and a supplier self-certification form. The contract is subject to various federal regulations, including the Davis-Bacon Act and associated wage determinations for building construction in Idaho. Compliance with FAR clauses regarding small business utilization, whistleblower rights, and the Buy American Act is required. Additionally, first-tier subcontractors with awards exceeding $45,000 must disclose their debarment status. Final payment and the release of retainage are contingent upon a joint substantial completion inspection and final acceptance by center staff.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 19 days
NAICS: 238220
New
Inland Empire Job Corps-Request for Quote HVAC Replacement Cafeteria & OA CTS
Solicitation # inland-empire-job-corps-request-quote-hvac-replacement-cafeteria-oa-cts
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontract to replace packaged HVAC units with gas heating at the Inland Empire Job Corps Center in San Bernardino, California. The project focuses on the Cafeteria and OA/CTS areas and includes the removal and EPA-compliant disposal of existing units, installation of high-efficiency replacements, and the modification of gas piping, ductwork, and electrical disconnects. The estimated contract value ranges from $25,000 to $100,000, with a required performance period of 60 consecutive business days following the Notice to Proceed. Bids are due by November 23, 2026, and must include a detailed cost breakout, a signed bid form, and proof of a mandatory site visit. For bids of $25,000 or more, contractors must provide a bid bond equal to 20% of the base bid, as well as performance and payment bonds from an A-rated surety company. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and fringe benefits. Award decisions will be based on overall best value, and eligible small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms, are encouraged to apply. Contractors must adhere to strict federal and state regulations, including OSHA safety standards, EPA refrigerant recovery protocols, and various FAR clauses regarding security, privacy, and the Buy American Act. Required deliverables include fully operational systems, startup testing, and two sets of operation and maintenance manuals. Payment will be processed via AIA documents G702 and G703, with a 10% retainage withheld until substantial completion and final acceptance of the work.
Inland Empire Job Corps

POSTED

about 2 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The contract titled Plumbing System Installation seeks a subcontractor to undertake the full installation of new plumbing systems, encompassing water supply lines, drainage networks, and all related fixtures. The solicitation was posted on July 29, 2026, with a response deadline of August 4, 2026, at 5:30 PM, and is classified under NAICS code 238220, which corresponds to plumbing, heating, and air-conditioning contractors. The work is to be performed in Kentucky, with the place of performance listed as Other, indicating flexibility in the specific location within the state. There is no designated sponsoring agency or point of contact listed, and the contract is structured as a subcontract without any set-aside provisions. Interested parties must submit proposals through the provided online portal before the deadline to be considered.

General Info

Subcontractor needed to install plumbing systems in Kentucky by August 4, 2026, under NAICS 238220.

Place of Performance

Other, KY, USA

Set-Aside

NONE

Documents

This scope was carved out of RFB-785-2700000013-2.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFB-785-2700000013-2 | RFB-34-27 CHFS - OAK Renovate/Replace Cottages, Phase III

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKentucky → N/A
ContactsNo contacts available
OfficeN/A
Organization / AgencyKentucky → N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of new plumbing systems including water supply, drainage, and fixtures.

More opportunities from Kentucky → N/A

Same awarding agency

NAICS: 238220
SLED
RFB-785-2700000172-2 | RFB-100-27 CHFS OAK Repair Building 501 Chiller
Solicitation # RFB-785-2700000172-2
Solicitation RFB-785-2700000172-2, also referred to as RFB-100-27, is a request for bids issued by the Commonwealth of Kentucky Department for Facilities and Support Services. The project involves the replacement of nine failing modular air-cooled chillers with two new units at Building 501 of the Cabinet for Health and Family Services located in Somerset, Kentucky. The scope of work includes the installation of the new chillers, utilizing existing electrical gear with new fuses and conductors, performing duct modifications to extend condenser air to the areaway grade level, and installing new piping and heat trace from the mechanical room wall to the equipment. Technical specifications include requirements for stainless steel exterior ductwork and concrete pad extensions, with Dunham-Bush included as an approved equipment option. Bids must be submitted electronically via the Commonwealth eProcurement system, with a final response deadline of November 18, 2026, at 1:30 P.M. Eastern Time. Bidders are required to upload the Official Bid Document and any required Bid Bond as a single combined PDF attachment, while entering 0.00 for the contract amount within the electronic portal to ensure the price on the official document prevails. The primary point of contact for this procurement is Susan Ward of the Division of Engineering and Contract Administration. All work must be performed in accordance with the provided plans and drawings, and bidders were encouraged to attend a site visit held on October 29, 2026.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

10 days ago

DEADLINE

in 6 days
View Details
NAICS: 238220
SLED
RFB-785-2700000172-1 | RFB-100-27 CHFS OAK Repair Building 501 Chiller
Solicitation # RFB-785-2700000172-1
Solicitation RFB-100-27 (RFB 785 2700000172-1) is a request for bids issued by the Commonwealth of Kentucky for the Cabinet for Health and Family Services. The project involves the replacement of nine failing modular air-cooled chillers with two new units at Building 501 in Somerset, Kentucky. The scope of work includes necessary electrical updates using existing gear with new fuses and conductors, duct modifications to extend condenser air to the areaway grade level, and the installation of new piping and heat trace from the mechanical room wall to the new chillers. Technical requirements include the use of stainless steel exterior ductwork, specific equipment clearance, concrete pad extensions, and BMS interfacing via BACnet. An add alternate is also included for a 200-ton rental chiller. Bids must be submitted electronically through the Commonwealth eProcurement system, with a final response deadline of December 1, 2026. Bidders are required to enter $0.00 for the contract amount in the electronic system and instead provide the actual bid price on an Official Bid Document, which must be uploaded as a single combined PDF along with any required bid bonds. The contract will likely be awarded to the lowest responsive and responsible bidder. Primary points of contact for the project include Susan Ward for purchasing and Greg Schenck for project management.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 1 month ago

DEADLINE

in 19 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS