Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Preventive Maintenance Services for Photovoltaic Systems

Active
PR15733540Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of State → American Consulate HyderabadView Agency

NAICS

221114 - Solar Electric Power GenerationView NAICS

Place of Performance

Hyderabad, IN-TG, 500032, IND

Set-Aside

NONE

Documents

(2)

Soliicitation+document+with+cover+letter-PMSC+Solar+Voltaic+System-V2-Final.pdf

PDF

Attachment+2+-+submission+forms.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of State → American Consulate Hyderabad
Contacts2 people available
OfficeWASHINGTON, DC, 20520, USA
Organization / Agency
Department Of State → American Consulate Hyderabad
View Agency Profile
Office AddressWASHINGTON, DC, 20520, USA
Contacts
Charles L Specht
Venugopal Rao Kulkarni

Full Description

Show more

The United States Consulate in Hyderabad, India, requires professional services and contractor cost proposals
to perform preventive maintenance services of the consulate facility’s photovoltaic systems.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
CSUB Solar & Battery Advanced Shovel-Ready SLPPAThe California State University, Bakersfield is soliciting proposals for a 20-year Site License Power Purchase Agreement (SLPPA) to finance, construct, own, operate, maintain, and ultimately remove or transfer a solar photovoltaic system with an integrated battery energy storage system (BESS) on its campus. The project is designated as advanced shovel-ready, with a Notice to Proceed scheduled for late November 2026 and a firm deadline for commercial operation and Permission to Operate set for December 1, 2027. Proposals must be submitted in sealed packages to the campus procurement office by September 16, 2026, and are evaluated using a best-value trade-off approach prioritizing both technical merit and lifecycle cost, with the 20-year Levelized Cost of Energy (LCOE) carrying the single largest weight at 320 out of 1,000 total evaluation points. The SLPPA provider must demonstrate proven experience in medium-voltage electrical work at 12 kV or above, intentional islanding capability, and successful integration of BESS with microgrid controls and non-export protection systems. Licensing is strictly enforced: the primary contractor must hold active, current Class A and C-10 California contractor licenses—no substitutions permitted—and must be registered with the California Department of Industrial Relations, maintain prevailing wage compliance, and carry workers’ compensation insurance. The system must deliver a minimum of 7,675,565 kWh in Year 1 with no more than 0.50% annual degradation, achieve system availability of at least 98%, and pass comprehensive commissioning and acceptance testing verified by PG&E and local authorities. All deliverables—including as-built drawings, O&M manuals, warranties, training documentation, and lien releases—are required upon project closeout. Offerors must also submit certifications for Small Business Enterprise and Disabled Veteran Business Enterprise status if applicable, along with non-collusion and conflict-of-interest affidavits, and comply with California’s CEQA and public contract codes. The project’s bundled advancement and procurement cost is capped at $5,745,215.92, though the long-term PPA rate per kWh remains unspecified. Failure to meet any mandatory qualification, submit required documentation, or adhere to formatting and submission rules will result in automatic disqualification. The proposal must be organized into 15 carefully defined tabs with strict page limits to ensure equitable evaluation.
CSU, Bakersfield

POSTED

7 days ago

DEADLINE

in about 2 months
View Details
NAICS: 221114
Federal
Renewable Energy Certificates (RECs)The National Oceanic and Atmospheric Administration’s Office of Chief Administrative Office and Safety and Environmental Compliance Office is seeking Renewable Energy Certificates (RECs) to fulfill its commitment to carbon pollution-free electricity, requiring all RECs to be Green-e Energy certified or equivalent and generated from eligible U.S.-based renewable sources such as wind or solar. The procurement follows the Revolutionary FAR Overhaul principles and is structured as a combined synopsis and solicitation under FAR Part 12 for commercial products and services, with no formal written solicitation issued; quotes are being requested directly in response to this notice. The effort is wholly set aside for small businesses under the SBA’s Total Small Business Set-Aside classification, with applicable NAICS codes 221114 for solar electric power generation and 221115 for wind electric power generation. The solicitation, identified as 1305M426Q0047, was posted on July 15, 2026, with a deadline for responses on July 31, 2026, at 7:00 p.m. Eastern Time. The contract is administered by the Department of Commerce, NOAA, based in Silver Spring, Maryland, with primary point of contact Patrill Smith-Moody reachable via email or phone. The place of performance is also in Maryland, and the solicitation is accessible through the SAM.gov portal. All prospective vendors must ensure their RECs meet specified certification standards and originate from approved renewable resources to qualify for award.
Department Of Commerce Noaa

POSTED

7 days ago

DEADLINE

in 9 days
View Details
NAICS: 221114
SLED
Grace Solar Energy CenterThe Grace Solar Energy Center project, formerly known as the Palo Verde Mesa Solar Project, involves a significant revision to expand its scale and infrastructure, increasing the photovoltaic facility’s capacity from 463.5 MW to 500 MW and adding a配套 500 MW battery energy storage system. The site’s land use has been adjusted from 3,250 to 3,310 acres, with transmission modifications including a new 1.9-mile 230-kV line connecting to an existing 8.6-mile right-of-way that feeds into the Southern California Edison Colorado River Substation, resulting in a total 10.5-mile transmission corridor. A portion of this line, measuring 158 feet, crosses a County of Riverside public right-of-way, necessitating a public use permit, while the remainder of the corridor operates on private or federal land outside county jurisdiction. Land use approvals under Conditional Use Permit CUP03684R01, Public Use Permit PUP00916R01, and Development Agreement DA0086A01 are integral to the project’s legal framework, with the latter being mandatory under Riverside County Ordinance No. 348 and Policy B-29, which require a binding development agreement before any solar project approval. The Bureau of Land Management land expansion from 28 to 395 acres falls outside the scope of these revisions. The project is governed by the California Environmental Quality Act, requiring a finalized Environmental Impact Report, mitigation monitoring plan, and a Statement of Overriding Considerations, with environmental compliance and ongoing oversight handled by Riverside County. All financial transactions related to permits and fees were processed through Tyler Payments, with regulatory fees totaling $4,277.50 paid to the California Department of Fish and Wildlife and other county administrative charges. The project is located approximately 2.8 miles north of Interstate 10, west of Blythe, California, with primary coordination managed by the Riverside County Planning Department and the applicant, Boulevard Associates, LLC, through Senior Project Manager Brendan Lewis and County Senior Planner Dat Tran. No federal acquisition clauses, contract types, pricing structures, or procurement-specific representations are present, as the documentation reflects state and local land-use approvals rather than a federal contract.
Riverside County

POSTED

8 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
WSU Wenatchee Sunrise Orchard Solar ArrayThe Board of Regents of Washington State University is soliciting sealed bids for the construction of a 0.5-acre solar array at the Sunrise Research Orchard located at 75 Sunrise Court, Rock Island, WA 98850. The project requires full construction including excavation and foundation placement for the racking system, installation of solar panels according to approved drawings, and extension of electrical lines from the existing transformer to the new array. The system is designed to generate electricity for on-site use or to feed surplus power back into the PUD grid, supporting research objectives. Substantial Completion must be achieved within 250 days of the Notice to Proceed, and all bids must be structured around this timeline. The estimated project cost ranges between $1,000,000 and $1,200,000, with a single optional alternate to install an additional solar array over an existing orchard area on site. Bids are due by 2:00 p.m. on August 6, 2026, followed by a virtual bid opening at 2:30 p.m. the same day. A non-mandatory virtual pre-bid meeting is scheduled for July 22, 2026, at 10:00 a.m. via Zoom, and a non-mandatory site walk will occur on July 27, 2026, at 11:30 a.m. The solicitation number is 2371-2025, posted on July 11, 2026, and all proposals must be submitted through the designated public purchase portal. Primary point of contact for inquiries is Craig Cole, reachable at (509) 335-9035 or craig.cole@wsu.edu. This procurement is categorized as a state-level education solicitation under Washington State University’s authority.
Washington State University

POSTED

11 days ago

DEADLINE

in 15 days
View Details
NAICS: 221114
Federal
Solicitation Amendment for Solar Photovoltaic system Preventive Maintenance Services for U.S. Embassy Kampala, UgandaThe solicitation amendment extends the proposal submission deadline for the Solar Photovoltaic System Preventive Maintenance Services at the U.S. Embassy in Kampala, Uganda, to July 24, 2026, at 1700 hours East Africa Time, with the official response deadline listed as 1500 hours UTC. All other terms and conditions of the original solicitation remain in full effect, and in the event of any conflict, this amendment takes precedence. The solicitation, identified as 19UG5026Q0015-A0002, is issued by the U.S. Embassy Kampala under the Department of State, with the primary point of contact for procurement inquiries being Ryan C. Eargle and Annie Chinyanganya via KampalaGSOProcurement@state.gov. The NAICS code 221114 indicates the scope relates to solar electric power generation services, and although the place of performance is specified as Kampala, Uganda, no details regarding the period of performance, deliverables, evaluation factors, pricing, or specific technical requirements are present in the available documentation. No set-aside provisions apply, and the contract value remains unspecified due to the absence of CLINs, cost data, or ceiling amounts. The amendment includes responses to vendor questions but lacks explicit attachments, contract clauses, inspection criteria, packaging requirements, or representations and certifications, with significant sections of the solicitation unavailable due to retrieval errors. The deadline extension provides vendors additional time to prepare submissions without altering the nature or scope of the original solicitation.
US Embassy Kampala

POSTED

13 days ago

DEADLINE

in 1 day
View Details
NAICS: 221114
SLED
SUFFIELD HIGH SCHOOL PHOTOVOLTAIC PROJECT STATE PROJECT #139-0063 PVThe Town of Suffield is inviting bids for the installation of a photovoltaic system on the roof of Suffield High School as part of State Project #139-0063 PV, with solicitation number 37764. The project includes the concurrent installation of a new standing seam metal roof to support the solar array, and bidders must comply with detailed specifications available on the town’s business office website. The solicitation is open to qualified contractors, with responses due by July 28, 2026, at 2:30 PM, and all submissions must adhere to the requirements outlined in the official bid documents. The project is administered through the Connecticut Department of Administrative Services and falls under the state's public procurement framework. Primary point of contact for inquiries is Eric Remington, who can be reached at 860-668-3202 or eremington@suffield.org. The work will be performed at Suffield High School in Suffield, Connecticut, and bidders are expected to demonstrate experience with commercial-scale solar installations and roofing systems. There is no set-aside designation indicated for small or disadvantaged businesses, and the project is open to all eligible entities. Interested parties should review the full solicitation materials on the CTSource portal to ensure compliance with all technical, financial, and procedural requirements prior to submission.
DAS Procurement

POSTED

22 days ago

DEADLINE

in 6 days
View Details
NAICS: 221114
SLED
General Plan UpdateThe California Department of Fish and Wildlife issued an Incidental Take Permit under the Western Joshua Tree Conservation Act and Fish and Game Code Section 1927.3 to authorize the disturbance of two western Joshua trees during the installation of a small ground-mounted solar panel system at a water district well site in Palmdale, California. The project involves trenching, excavation, concrete pouring, and material transport on a one-acre disturbed property, with all activities restricted to designated areas to minimize impact on protected vegetation. Strict environmental protections are mandated, including 10–50 foot no-work buffers around each tree, prohibition of hazardous substance contamination near trees, equipment leak prevention, and mandatory use of flagging and fencing to delineate protected zones. A qualified Designated Biologist must conduct daily inspections, and the permittee must submit pre-work notifications, immediate reports of any newly emerged trees or non-compliance, and a comprehensive Project Completion Report within one month of work completion, including photographic documentation and tree impact accounting. Mitigation fees totaling $4,071.75 are required for the authorized take, payable directly to the Western Joshua Tree Fund via CDFW’s South Coast Region, with checks required to include the permit number on the memo line. The permit is administered under state environmental law, not federal procurement regulations, and contains no standard Federal Acquisition Regulation clauses or contract line items. All financial obligations are regulatory mitigation payments tied to the take authorization, not contractual pricing structures. Oversight responsibilities are assigned to CDFW as the permitting authority, with Los Angeles County Planning serving as the lead agency for environmental review. Key contacts include Sarah Rains, CDFW’s Environmental Scientist, as the technical point of contact, and Connie Chung from Los Angeles County as the lead agency liaison. The project must adhere to conditions outlined in the Certified Environmental Impact Report (SCH No.: 2011081042) and must be completed by July 1, 2029. The permittee must maintain all records for inspection and grant CDFW access to the site for up to five years post-project for monitoring purposes. Any unauthorized take, damage, or failure to comply triggers immediate stop-work authority and reporting obligations, emphasizing strict compliance with the permit’s biological protection mandates rather than traditional contractual delivery terms.
Los Angeles County

POSTED

about 1 month ago

DEADLINE

in almost 3 years
View Details
NAICS: 221114
SLED
Operations Yard and Employee Parking Lot PV Solar and Battery Project (JN 225005)The Padre Dam Municipal Water District is planning the Design and Installation of a Photovoltaic Solar Panel Array and Battery System alongside Level 2 Electric Vehicle Charging Stations at its Operations Yard and Employee Parking Lot in Santee, California. Solar panels will be installed on existing canopies or new carport structures built within the active employee parking area, utilizing only previously disturbed land on District property to minimize environmental disruption. The project is designed to enhance energy efficiency, reduce long-term energy expenses, and lower the environmental footprint of facility operations through clean, renewable power generation and on-site energy storage. All construction and operational activities will adhere strictly to applicable codes, regulations, and safety standards. The system will integrate solar energy production with battery storage to optimize energy use and provide resilience during peak demand or grid interruptions. Level 2 charging stations will support electric vehicle adoption among staff and fleet operations. The project is forecasted to be issued in June 2026 with Tom Bloomer, Engineer/CIP Project Manager, identified as the primary point of contact for inquiries. Work will remain confined to existing District infrastructure within the 92071 zip code area, ensuring no new land disturbance beyond established boundaries.
Padre Dam Municipal Water District

POSTED

about 1 month ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Ground Mount Solar and Battery ProjectCalifornia State University, Bakersfield will implement a 4.55 megawatt direct current ground-mounted photovoltaic solar energy system across 15 acres of its main campus, complemented by an 11.7 megawatt-hour lithium-ion battery energy storage system. The solar installation will consist of approximately 6,500 panels mounted primarily on single-axis trackers, with a fixed-tilt array positioned along the western edge of the site facing south. The battery storage system will be housed in a prefabricated, fire-compliant enclosure on the eastern side of the property. Associated infrastructure includes inverters, an AC combiner, transformers, a control panel, and underground conduit connecting all components. A 21-kilovolt, 825-foot underground transmission line will link the system to an existing substation north of the site, integrating it with the PG&E grid. The project will feature perimeter fencing, access gates, and lighting for security. Construction is scheduled over an eight-month period from October 2026 to December 2027. Once operational, the system will run fully automated and unstaffed, with remote monitoring and management via a Supervisory Control and Data Acquisition system. Routine maintenance will include vegetation control, periodic panel washing, and electrical component inspections to ensure continued performance and safety.
California State University, Bakersfield

POSTED

about 1 month ago

DEADLINE

N/A
View Details