Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on February 10, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Refrigeration Plant Repair

Awarded
N40442-10-T-5049Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
Federal
COLUMBIA Class Tailcone Manufacture
Solicitation # N0016726R1005
The Naval Surface Warfare Center Carderock Division is soliciting proposals for the manufacture and acquisition of COLUMBIA Class submarine propulsor tailcones. The scope of work involves the procurement of materials, machining, assembly, painting, and delivery of up to eight tailcone kits, with a minimum of one kit required in the first year and options for seven additional kits. The contract also includes requirements for engineering support services, such as design reviews and the development of a manufacturing plan and final certification package. This is a DPAS rated DX-A3 order utilizing a combination of Fixed Price Incentive Firm Target for hardware, Cost Plus Fixed Fee for engineering services, and Cost No Fee for data requirements. Award will be determined via a best value tradeoff process evaluating technical capability, cost proposal, past performance, and small business participation, with technical capability being the most significant factor. Proposals must be submitted electronically through the PIEE Solicitation Module and organized into five distinct volumes. Key deliverables include a variety of Contract Data Requirements List items, such as monthly status reports, performance and cost reports, and conference minutes. The contract mandates strict adherence to security protocols for classified and unclassified data, compliance with ISO 9001:2008 or AS9100 quality standards, and the use of the Wide Area WorkFlow system for invoicing.
Nswc Carderock

POSTED

about 12 hours ago

DEADLINE

in 3 months
NAICS: 336611
New
Federal
CGC KUKUI DRYDOCK
Solicitation # 70ZU0227QIBCT0001
Solicitation 70ZU0227QIBCT0001 is an Indefinite Delivery Requirement Contract (IDR) for the FY27 drydock availability of the USCGC KUKUI (WLB 203), a 225-foot Buoy Tender homeported in Sitka, Alaska. The project involves comprehensive drydock repairs, including extensive preservation of the hull, exterior decks, superstructure, ballast and potable water tanks, and various internal mechanical components. Performance will take place at the contractor's facility from February 2, 2027, to May 18, 2027, with an anticipated award date of January 18, 2027. This requirement is a total small business set-aside under NAICS code 336611, with a size standard of 1,300 employees. The award will be granted to the responsible quoter providing the most advantageous quote, based on a lowest-price technically acceptable basis. Evaluation factors include a pass/fail assessment of technical capability and past performance within the last three years. Contractors must provide a comprehensive execution plan for lodging and messing, facility certifications, and docking calculations in accordance with SFLC Standard Specifications 0740 and 8634. Quotes must be submitted via email by November 23, 2026, and must include a detailed technical proposal separate from the pricing sheet. Order limitations are set with a minimum order of 1,000 dollars and a maximum combination order of 7 million dollars.
CG-SEA-C22

POSTED

about 12 hours ago

DEADLINE

in 25 days
NAICS: 336611
New
Federal
USCG STA COOS BAY (47302-47242) FY27 DD REPAIR
Solicitation # 70z04027SSBPL28928
The Department of Homeland Security, through the U.S. Coast Guard SEA-C office in Norfolk, Virginia, has issued a Sources Sought Notice for dry dock repair services for two vessels, USCG STA COOS BAY (47302) and CG STA COOS BAY (47242). The anticipated work is scheduled to begin on March 2, 2027, in Charleston, Oregon, with an estimated period of performance of 121 calendar days per vessel. The scope of work requires the contractor to provide all necessary personnel, equipment, materials, and facilities to perform comprehensive repairs, including underwater body preservation, hull plating inspections, propulsion shaft and rudder assembly services, and the provision of marine chemist and sea trial support. The government intends to award a single firm-fixed-price contract, with the final competition and set-aside decisions based on market research conducted under NAICS code 336611. Interested sources must submit their capabilities, including company identification, UEI number, and business size certifications, to Troy Elliott by November 12, 2026. Evaluation of capabilities will include a review of past performance on projects of similar scope and a commitment to submit a proposal as a prime contractor. Economic considerations for the future award will include foreseeable costs such as crew lodging, messing, and travel in accordance with Joint Travel Regulations.
CG-SEA-C23

POSTED

about 12 hours ago

DEADLINE

in 14 days

AI Contract Overview

Show more

The Military Sealift Fleet Support Command is seeking quotations for a firm fixed price purchase order to restore the domestic refrigeration plant on the USS Frank Cable in Guam. This small business set-aside requires a refrigeration contractor to provide all labor, materials, and services necessary to repair and overhaul the system between March 1 and May 31, 2010. The scope of work includes a Class B overhaul of the No. 3 compressor, replacement of various valves and regulators, installation of a new heat exchanger for the No. 1 compressor, and comprehensive leak testing and operational validation. A critical requirement of this solicitation is the exclusive use of original equipment manufacturer parts; offers containing non-OEM parts will not be considered. While the government will provide specific lube oil, filters, and refrigerant, the contractor is responsible for providing a wide array of specialized York and Alco components and tools. Due to limited local availability in Guam, contractors are advised to bring all necessary equipment to complete the project. Proposals must be submitted by February 12, 2010, and must include detailed pricing and company identification information.

General Info

Contract Value

$241,220

NAICS

336611 - Ship Building and Repairing

Place of Performance

GUAM, VA, GUM

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Military Sealift Flt Supp Command Norf
Contacts2 people available
OfficeNORFOLK, VA, 23511, USA
Office AddressNORFOLK, VA, 23511, USA
Contacts
ALFRED TURNERCONTRACT SPECIALIST
Clenton A. ShanksSupervisory Contract Specialist

Full Description

Show more
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format prescribed in Subpart 12.6 of the Federal Acquisition Regulation (FAR), as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. The solicitation number is N40442-10-T -5049, and it is being issued as a request for quotation (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-26. NAICS 333618 applies. The Small Business Competitiveness Demonstration Program is not applicable. This is a Small Business Set Aside. Military Sealift Fleet Support Command (MSFSC), Norfolk, VA. intends to award a firm fixed price purchase order for the USS Frank Cable for the following service order. Original equipment manufacturer (OEM) parts are required for this service. Any offer for other than OEM parts will not be considered: A. Statement of Work: Request that a Refrigeration Contractor provide labor, material and services to restore the Domestic Refrigeration Plant to proper operation on USS FRANK CABLE: 1. Change out Evap Suction Pressure Regulators on both No.1 and No.2 Chill Boxes. 2. Replace all Thermal Expansion Valve Cages and Power Head Assemblies. Install thermal bulbs IAW NSTM Chapter 516. Install ship furnished RTD's in same orientation as thermal bulb, with leads exposed outside tail coil insulation. 3. Repair or replace 15 Hand Expansion Valves. 4. Replace the three Receiver Liquid Level Indicators. 5. Replace all three PENN Water Regulating Valves. 6. Remove and reinstall No.3 Compressor Discharge Valve in correct flow orientation. 7. Replace No.3 Refrigeration Unit King Valve. 8. Conduct Class B Overhaul of No.3 Compressor, including capacity control. 9. Replace Detroit Thermostatic switch for No.3 Freezer. 10. No.1 Compressor: Crop out existing undersized heat exchanger and fit and install new WEDJ heat exchanger. 11. No.2 Compressor: Replace Mechanical Seal. 12. Repack all three Compressor Henry Suction Valves 13. Rebuild a total of 26 different Henry Packless Standard Globe Valves as designated by Ship's Force. 14. Install temporary compressor suction strainer felt inserts. 15. With assistance of Ship's Force, inspect compressor crankcases for cleanliness and excessive connecting rod play. Charge oil and inject initial dose of Ritchie Leak Scanner dye. 16. With assistance of Ship's Force, conduct a 225 psig Nitrogen pressure leak test. Submit an as found condition report with recommendations to correct leaks and additional deficiencies. Conduct additional corrective work as directed by the MSFSC Port Engineer. 17. Charge each refrigeration Unit to proper liquid level. 18. With assistance of Ship's Force, prepare each Refrigeration Unit for operational testing. Check and adjust as required the following Compressor and Refrigerant System Controls as per specifications in the Technical Manual. a. HP Switch b. LP Switch c. Oil Pressure Differential Switch d. Oil Cooler Temperature Control Valve e. Sea Water Flow Switch f. Capacity Control g. Water Regulation Valve h. Thermal Expansion Valves i. Box Thermostatic Switches 19. On Compressors not overhauled, test Compressor Discharge Valves and Compressor Suction Valves IAW Paragraph 5-3 and 5-4 of the Technical manual. 20. Remove and inspect compressor suction strainer felt inserts until clear of contamination IAW paragraph 6.9.c to the Technical Manual. 21. With assistance of Ship's Force, conduct a minimum 48 hour operational test, including demonstration of Hot Gas defrosting Prove all box temperatures and all system operating parameters are at proper operating levels to the satisfaction of the Chief Engineer. 22. Ship's Force will pre-clean condensers and provide labor assist with such tasks as cleaning crankcases, changing out oil, filters, dehydrator cartridges and transferring/recovering refrigerant. 23. The ship lacks the York special tools such as the simple valve retaining clips, unloading sleeve clips, mechanical seal puller and the York bearing puller. The ship also lacks consumables like thermal insulation tape used when installing TXV thermal bulbs. Due to the limited availability of material on Guam, it is recommended that the Contractor bring everything and anything required to complete this work. 24. The Ship will furnish the new type compressor lube oil, SHELL CLAVUS R68, well as Dry Nitrogen and Refrigerant R134A. 25. If funding permits, the addition of a Class B overhaul for No.1 Compressor should be considered. 26. The Statement of Work is not in any specific order. Evacuations, transfer of refrigerant, and system charging will be performed as required. 27. During initial operation with compressor suction felt inserts, inserts need to be checked every two hours and then every four hours as contamination lessens. The compressors cannot be left unattended during this process. Ship's Force will assist. 28. All work to meet the satisfaction of the MSFSC Port or Chief Engineer. Conduct a nitrogen pressure leak test. Verify all system control operating set points. Conduct a complete system operational test and pull boxes down to required temperatures. B. MATERIAL REQUIREMENTS: Contractor Furnished 1. Class B Overhaul Parts for No.3 YORK RN44B-12 Compressor 2. YORK RN44B-12 Compressor Suction Strainer Felt Inserts 12 Each 3. Shaft Seal YORK P/N 364-43740A (for No.2 Compressor) QTY: 01 Each 4. SPECIAL TOOLS: a. Shaft Seal Puller YORK P/N 364-37059B (turn over to ship) b. Bearing Puller YORK P/N 364-37051B (turn over to ship) c. Unloading Sleeve Clips YORK P/N: 064-37002A (turn over to ship) d. Valve Clips YORK P/N 064-03447K (turn over to ship) 5. Valve, Water Regulating, 2 inch, PENN P/N V43B5-3, QTY: 03 Each 6. Thermal Expansion Valve Components: a. ALCO Valve Model TCLN-1-1/2-MW35: 1. Cage: ALCO XC709-A00B QTY: 10 Each 2. Power Head Assembly: ALCO XB1024-MW35-4C QTY: 17 Each, (20 FT long thermal bulb sensing line) b. ALCO Valve Model TCLN-3/4-MW35 1. Cage: ALCO X22440-B1B QTY: 10Each 2. Power Head Assembly: Same as for valve above 7. Regulator, Evap Suction Pressure, 1-1/2 ODF, ALCO P/N EPR-13 QTY: 02Ea 8. Valve, Solenoid, KING, 7/8, ASCO P/N AV198-481-2 QTY: 01 Each 9. Valve, Solenoid, 3/8, Evaps & Oil Coolers, ASCO P/N AV198-480-1 QTY: 02 10. Valve, Temp Control, Oil Cooler, ALCO P/N 935-106B QTY: 01 Each 11. Packing, Valve, Globe, 3 Inch, Comp Suction, HENRY 28-1074PK, QTY: 03 Set 12. Kit, Overhaul, Valve, Globe, 5/8, Hand Expansion HENRY 6295N, QTY: 16 13. HENRY Packless Globe Valve Overhaul Kits: - Inch Valve: 02 Kits HENRY 6261N (7 valves installed) 3/8 Inch Valve: 10 Kits HENRY 6263N (30 Valves installed) 5/8 Inch Valve: 05 Kits HENRY 6265N, (16 Valves installed) - Inch Valve: 01 Kit HENRY 6266N (3 Valves installed) 7/8 Inch Valve: 06 Kits HENRY 6267N (19 Valves installed) 1-1/8 Inch Valve: 03 Kits HENRY 6268N (09 Valves installed) 14. Switch, Thermostatic, (-10'F-60'F), DETROIT 222-10NN 2221458 QTY: 01 15 Indicator, Liquid Level, Receiver, YORK 367-679978013 QTY: 03 Each 16. Ritchie Yellow Jacket Fluorescent Leak Scanning Solution UV Lamp Kit and Solution for three R134A compressors with four gallon sumps (turn over to ship) 17. Valve, Solenoid, Capacity Control, YORK 025-16162-C002 02 Each 18. Valve gaskets, o-rings, adhesives, insulation, and seals as required. C. MATERIAL REQUIREMENTS: Government Furnished 1. SHELL CLAVUS R68 OIL, 12 Gallons 2. Compressor Oil Filters 3. Dehydrator Cores 4. Compressor Crankcase cover gaskets 5. 100 Ohm Platinum RTD's D. REFERENCES: 1. Machinery Readiness Evaluation Detailed Report of 11 October 2009 2. Technical Manual NAVSEA S9516-AA-MMO-000 Change E SHIP'S STORES REFRIGERATION PLANT 3. Naval Ship's Technical Manual Ch. 516 REFRIGERATION (All references are avaliblie onboard) E. EQUIPMENT INSTALLATION NOTES: 2. Compressors (3): YORK Model RN44B-12, Type W 4 Cylinder, 3-3/4 x 4-1/2, 1254 RPM, Converted from R12 to R134A, SERIAL Numbers: #1) EM065723 #2) N/A #3) EM065722, Oil Sump Capacity: 4 Gallons, Oil Type: To be changed to SHELL CLAVUS R68. 3. Compressor Capacity Control: United Electric 240, 20'HgVac-80 psig 4. Receiver Capacity: 515# R134A 5. Heat Exchanger: WEDJ Model NHSH-15, 7/8 IDF Liquid, 2-1/2 IDF Suction, 4-1/8 OD x 33-1/4 Long 6. Water Regulating Valves (3): PENN V43B5-3 2 inch 7. Thermal Expansion Valves: ALCO TCLN-1-1/2-MW35 and TCLN-3/4-MW35 (with 20ft bulb tubing) 8. Evap Suction Pressure Regulator: ALCO EPR-13 1-1/2 ODF 9. This system does not have any oil traps installed. Floodbacks dilute crankcase oil and contribute to oil leaving the compressor and settling in the Evaporator coils. The decision to add Oil Traps should be made after judging system performance once all required repairs, maintenance, adjustments, and operational testing have been completed. 10. The insulation on the refrigerant lines has mostly failed, allowing much condensation and mold accumulation. 11. This Domestic Refrigeration System uses Hot Gas Defrosting. 12. The adjustable foundation frame of No.2 Compressor, which uses screw tightening for adjusting belt tension, has collapsed inward. Ship's Force will need to crop out and replace this portion of the foundation frame before operational testing of No.2 Compressor can begin. . F. Work Schedule: 1 March 2010 through 31 May 2010 G. VR Location: Guam Shipyard, Guam The following FAR provisions and clauses apply to this solicitation and are incorporated by reference: 52.204-7 Central Contractor Registration; 52.211-6 Brand Name or Equal 52.212-1 Instructions to Offerors-Commercial Items; 52.212-3 Offeror Representations and Certifications-Commercial Items Alternate I The offeror has completed the annual representations and certification electronically via the ORCA website at http://orca.bpn.gov . After reviewing the ORCA database information, the offeror verifies by submission of this offer that the representation and certifications currently posted electronically at FAR 52.212-3, Offeror Representations and certifications'Commercial Items, have been entered or updated in the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference); 52.212-4 Contract Terms and Conditions-Commercial Items; Addendum to 52.212-4 (q) Other Compliances applies: Federal Law and regulation require Government contractors to possess appropriate insurance coverage for their employees. The Government reserves the right to request evidence of appropriate insurance, including Longshoreman's and Harbor Workers' Compensation Act (LHWCA) coverage required to perform work on or near ships. (33 U.S.C. S903(a). All policies shall contain an endorsement stating that any cancellation or material change in the coverage adversely affecting the Government's interest shall not be effective unless the Contractor provides written notice of the same to the Contracting Officer. Within 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders the following clauses apply and are incorporated by reference: 52.219-28 Post-Award Small Business Program Representation. 52.222-3 Convict Labor, 52.222-19 Child Labor - Cooperation with Authorities and Remedies, 52.222-21 Prohibition of Segregated Facilities, 52.222-26 Equal Opportunity, 52.222-36 Affirmative Action for Workers with Disabilities, 52.222-50 Combating Trafficking in Persons 52.225-13 Restrictions on Certain Foreign Purchases, and 52.232-33 Payment by Electronic Funds Transfer --Central Contractor Registration; and The following Defense FAR Supplement (DFARS) provisions and clauses apply to this solicitation and are incorporated by reference: 252.204-7004 Required Central Contractor Registration. Alternate A; 252.211-7003 or 252.211-7003 Alternate I Item Identification and Valuation; Within DFARS 252.212-7001 Contract Terms and Conditions Required To Implement Statutes or Executive Orders Applicable to Defense Acquisitions of Commercial Items the following clauses apply and are incorporated by reference: 252.225-7001 Buy American Act and Balance of Payment Program, 252.225-7000 Buy American Act--Balance of Payments Program Certificate, 252.232-7003 Electronic Submission of Payment Requests; and 252.247-7023 Transportation of Supplies by Sea Alternate III. The following additional clauses apply: 52.215-5 Facsimile Proposals: +1 (555) 000-0000. The following numbered notes apply to this requirement: N/A At a minimum, responsible sources shall provide the following: a price proposal which identifies the requested item, with its unit price, extended price, total price, prompt payment terms, remittance address, Tax I.D. #, Duns #, and Cage Code. Responses to this solicitation are due by 12 February 2010 @ 0900 A.M. Offers can be emailed to contact@example.gov or faxed to the above number. Reference the solicitation number with your quote.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS