Replacement of Chillers and Pumps - FCC Oakdale, LA

Active
15BGCS26Q51800001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Federal Bureau of Prisons at FCC Oakdale in Louisiana is seeking market input for a potential future procurement to replace chillers and centrifugal pumps at its facility. This sources sought notice aims to identify qualified vendors capable of supplying new air-cooled chillers and associated pumps, with installation to be performed in-house by FCC Oakdale HVAC staff. The requirement includes nine Trane Sintesis RTAF115E chillers at 115 nominal tons and two Trane CGAM scroll chillers at 80 nominal tons, all must meet specific technical criteria including 460V/60Hz/3-phase power, use of R-513A or R-454B refrigerant, UL listing, ASME compliance, and adherence to ASHRAE 90.1 standards up to 2016. Additionally, ten and nine centrifugal pumps of the Bell & Gossett Series 1510 or equivalent are required, differing only in discharge and suction sizes while maintaining identical performance specs of 150 GPM, 100 ft head, and 5 HP. Manufacturer-certified start-up services for all chillers must be provided after installation. Vendors must submit a capability statement on company letterhead detailing their ability to meet all salient equipment requirements, estimated delivery timelines, past performance examples, GSA/FSS/GWAC contract numbers, employee count, and current business size and socio-economic status under NAICS code 333415. Nonmanufacturer small businesses must confirm they are primarily engaged in retail or wholesale, intend to take ownership of the equipment, identify the manufacturer they will source from, and attest to their understanding of the nonmanufacturer rule. Delivery of all new, undamaged equipment along with complete product data, installation guides, shop drawings, equipment schedules, and warranty documentation is required within 270 days of contract award. Responses are due by July 6, 2026, and are voluntary; they do not constitute an offer or create a binding contract but may influence the Government’s future acquisition strategy, including potential set-asides or competition structure. All correspondence should be directed to Jim Seratt at the provided email address.

General Info

Procurement for nine 115-ton and two 80-ton chillers, ten Pump Set A, nine Pump Set B units, delivery in 270 days, startup services required.

Agency

Department Of Justice → FaoView Agency

NAICS

333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing View NAICS

Place of Performance

Oakdale, LA, 71463, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

1 update
PhaseSources Sought
Posted

Sources Sought

Amendment 1

Contract was updated

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Justice → Fao
Contacts2 people available
OfficeGRAND PRAIRIE, TX, 75051, USA
Organization / Agency
Department Of Justice → Fao
View Agency Profile
Office AddressGRAND PRAIRIE, TX, 75051, USA
Contacts

Full Description

Show more

FCC Oakdale – B&F PROJECT 26Z5AW6
Replace Chillers and Pumps – Supply Only


This is a Sources Sought Notice issued for market research information and planning purposes only. It does not constitute a solicitation and responses to this notice are not offers and cannot be accepted by the Government to form a binding contract.

Participation is voluntary and a response is not required to compete in any potential future solicitation. However, responses to this notice may influence the Government’s development of a future requirement and future acquisition strategy (e.g. set-aside, full and open competition).

Respondents will not be notified of the results of this market research effort. No reimbursement will be made for any costs associated with responding to this Sources Sought Notice.


1. Agency and Location


Federal Bureau of Prisons (FBOP)
Federal Correctional Complex (FCC) Oakdale
1507 East Whatley Road, Oakdale, LA 71463


2. Purpose


FCC Oakdale seeks to identify capable contractors able to furnish and deliver air‑cooled chillers, centrifugal pumps, and provide manufacturer‑certified start‑up services. Installation will be performed by FCC Oakdale HVAC staff.


3. Required Equipment and Salient Characteristics


All equipment must be new, meet all Federal, State, and local codes, and conform to the salient characteristics below. Information is taken directly from the specification sheet.


A. Chillers


1. Trane Sintesis Air‑Cooled Chiller – Model RTAF115E (Brand Name or Equal)


Quantity: Nine (9)
Salient Characteristics:
• 115 nominal tons
• High‑efficiency unit
• Voltage: 460V / 60Hz / 3‑phase
• Refrigerant: R‑513A
• UL listed
• ASME pressure vessel code compliant
• Meets ASHRAE 90.1 (all versions up to 2016)


2. Trane CGAM Air‑Cooled Scroll Chiller (Brand Name or Equal)


Quantity: Two (2)
Salient Characteristics:
• 80 nominal tons
• High‑efficiency unit
• Voltage: 460V / 60Hz / 3‑phase
• Refrigerant: R‑454B
• UL listed
• ASME pressure vessel code compliant
• Meets ASHRAE 90.1 (all versions up to 2016)


B. Centrifugal Pumps


(All pumps Bell & Gossett Series 1510 or equal.)


1. Pump Set A


Quantity: Ten (10)
Salient Characteristics:
• 8" impeller
• 150 GPM
• 100 ft head
• 5 HP
• 230–460V
• 2½" discharge
• 3" suction


2. Pump Set B


Quantity: Nine (9)
Salient Characteristics:
• 8" impeller
• 150 GPM
• 100 ft head
• 5 HP
• 230–460V
• 2" discharge
• 2½" suction


C. Chiller Start‑Up Services


Following in‑house installation, the contractor shall provide a certified manufacturer’s representative to perform initial start‑up of all chillers.


4. Delivery Requirements


Contractor shall:
• Verify quantities prior to shipment
• Provide factory‑supplied components, controls, and accessories
• Deliver all equipment to FCC Oakdale
• Provide manufacturer product data, installation requirements, and warranty materials
• Coordinate delivery with the Government
• Deliver equipment new and free of damage
• Complete delivery within 270 days after contract award


5. Submittals Required Upon Delivery


• Product data sheets
• Manufacturer specifications
• Chiller shop drawings
• Equipment schedules
• Warranty documentation


6. Applicable NAICS Codes and Size Standards


333415 – Air‑Conditioning and Warm Air Heating Equipment and Commercial Refrigeration Manufacturing
• Small Business Size Standard: 1,350 employees


7. Requested Information from All Interested Vendors To Be Provided on Company Letterhead


  1. Company name, address, point of contact, phone, email
  2. UEI and CAGE code
  3. Capability statement showing ability to supply equipment meeting all salient characteristics
  4. Estimated delivery timeframes
  5. Past performance examples for similar HVAC equipment supply
  6. Any applicable GSA/FSS/GWAC contract numbers
  7. Current number of Employees
  8. Current business size/status for your organization for the NAICS code listed above
    1. List any socio-economic statuses applicable for the organization
       
    2. Are any stated socio-economic status(es) certified and active in the SBA’s Small Business Search (https://search.certifications.sba.gov)? (e.g. VOSB, SDVOSB, WOSB, EDWOSB)
       
  9. Required Information from Small Business Nonmanufacturers of the Equipment Being Procured To Be Provided on Company Letterhead
    1. Confirm that your company is primarily engaged in retail or wholesale and normally sells the type of equipment being procured
    2. Confirm that your company intends to take ownership or possession of the equipment being procured in a manner consistent with industry practice
    3. Identify the manufacturer from which you intend to obtain the equipment being procured
    4. Confirm your organization is aware and capable of meeting the requirements of clause 52.219-33, Nonmanufacturer Rule, should they be successful for a future award.

8. Response Deadline


Responses requested by:
July 6, 2026


9. Submission Contact


Jim D. Seratt
Contracting Specialist (Contractor)


Field Acquisition Office
Federal Bureau of Prisons
Email: jseratt1@bop.gov

Similar Contracts

NAICS: 333415
New
Federal
Environmental Chambers EquipmentThe Centers for Disease Control and Prevention, through its Office of Acquisition Services within the Department of Health and Human Services, plans to award a sole source firm fixed price contract to PARAMETER GENERATION AND CONTROL for the procurement of two environmental chambers to be used in the Tobacco Products Laboratory. The contract has an anticipated performance period from September 30, 2026, through August 31, 2027, and involves supplies classified under NAICS code 333415. This action is conducted under the authority of FAR 12.102 and 41 U.S.C. §§ 1901 and 1903, which permit non-competitive procurement under specific circumstances, and while the government intends to proceed without competition, it is accepting responses from interested parties prior to the deadline to assess potential alternatives. All quotations or responses must be submitted electronically to Contract Specialist Staci Boykin at zwh7@cdc.gov no later than 3:00 PM Eastern Time on July 3, 2026. The notice is a presolicitation and not a formal request for competitive bids; however, any submissions received by the deadline will be reviewed to determine whether a competitive process should be pursued. The government retains full discretion to proceed non-competitively regardless of responses received. The place of performance is Atlanta, Georgia, with the contracting office located in Atlanta at 30333. The solicitation number is 0000HCNB-2026-98716, and no set-aside provisions are applicable.
CDC Office Of Acquisition Services

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 333415
New
Federal
COOLER UNIT,AIRThis solicitation, issued under N0010426QTB51 by Navsup Weapon Systems Support Mech, seeks repair services for the COOLER UNIT,AIR with a mandatory Repair Turnaround Time (RTAT) of 240 days, measured from physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility (CAV) system. All repairs must comply with applicable military standards, including MIL-STD-130 Rev N for marking, and must adhere strictly to the original manufacturer’s technical documentation, drawings, and approved repair procedures. The contract requires Government Source Inspection, and the Contractor is responsible for maintaining complete inspection records for 365 days after final delivery. Freight is FOB Origin, and the Navy handles all logistics through CAV. The quote must include unit and total pricing, the proposed RTAT, and a breakdown of any delay penalties, with a specified per-unit-per-month reduction for unexcused delays up to a maximum cap. The offer must also compare the repair cost against the new unit’s price and lead time. Contractors must comply with mandatory clauses including cybersecurity maturity model certification, Small Business Subcontracting Plan, and the Navy’s requirement to use Workflow Pro for payment instructions. The contract permits an option for increased quantity at original unit pricing, exercisable within FAR 52.217-6 timelines. All repairs must meet CAGE 38450 and reference number 5806C008D specifications, with no substitutions allowed without prior written approval from the contracting officer, and any design changes require proper coding and documentation. Pricing and performance locations must be clearly identified, including CAGE codes for the awardee, inspection, and subcontractor facilities if different. Only firm-fixed-price quotes are accepted, and failure to meet RTAT may lead to price reductions, contract termination for default, or other remedies. All technical documents referenced must be obtained through DODSSP or designated Navy channels, with strict adherence to distribution statements for controlled data, including NOFORN restrictions. Responses are due July 10, 2026, and the award will be bilateral pending contractor acceptance.
Navsup Weapon Systems Support Mech

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 333415
New
Federal
Columbus HD UpgradeThe contract pertains to the procurement and installation of advanced HVAC components and corresponding electrical distribution upgrades at a data center in Columbus, Ohio, aimed at supporting high-density IT equipment loads. The project requires the design and implementation of a new redundant liquid cooling system alongside enhanced power distribution infrastructure, ensuring full integration with the existing Building Automation System. The contractor is responsible for all phases of work including engineering, installation, system programming, documentation submittals, and delivery of as-built records. The scope is defined through detailed drawings, specifications, and appendices provided as part of the solicitation. Two optional line items are included for pricing purposes, one covering additional Rear Door Heat Exchangers and the other covering additional Power Distribution Units, allowing for flexible bid structures based on extended requirements. The solicitation, identified as HC102826R0036 and titled Columbus HD Upgrade, is issued by the Department of Defense’s It Contracting Division under a Total Small Business Set-Aside, with NAICS code 333415 mandatory for eligible respondents. Proposals must be submitted by July 28, 2026, and access to protected documents requires a valid SAM.gov registration with the correct organizational representation and point of contact status. Access requests are subject to processing delays of up to five days for updates and up to two weeks for new registrations. All inquiries and correspondence should be directed to the designated points of contact at Scott Air Force Base, Illinois, while the physical work location is specified as Columbus, Ohio. The contract does not provide administrative support for SAM registration issues, requiring proposers to resolve access barriers independently through official SAM.gov channels.
It Contracting Division - PL83

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 333415
New
Federal
HEAT INTERCHANGER,RThis contract solicitation, identified by N0010426QTB52, seeks repair services for a HEAT INTERCHANGER,R under a firm-fixed-price structure, with a mandatory Repair Turnaround Time (RTAT) of 240 days measured from the physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility (CAV) system. All repairs must adhere to the original manufacturer’s specifications, drawings, and technical orders, and the completed item must be marked in compliance with MIL-STD-130, Rev N. The Government requires Government Source Inspection (GSI), and the contractor is responsible for all inspection, testing, quality assurance, and recordkeeping, with records retained for 365 days after final delivery. Freight is FOB Origin and handled by the Navy per the CAV Statement of Work, with quotes required to include unit and total pricing, RTAT, and a comparison to the cost and lead time of purchasing a new unit. Any failure to meet the 240-day RTAT will trigger a predetermined monthly price reduction per unit, capped at a specified maximum, without limiting the Government’s other remedies such as termination for default. The contract includes several mandatory clauses and deviations, including the Navy’s use of AbilityOne support contractors, cybersecurity maturity model certification requirements, and a Small Business Subcontracting Plan under Deviation 2026-O0037. Contractors must affirm compliance with the Alternate A Annual Representations and Certifications, and the contract incorporates provisions for an option to increase quantities, exercisable within the timeframe specified in FAR 52.217-6. Only authorized distributors of the original manufacturer may submit offers, requiring official proof on company letterhead. The solicitation also enforces strict controls on design, material, or part number substitutions, requiring formal approval via written change order and classification by Code 1 through Code 6. Distribution of technical documents provided by the Navy is governed by specific distribution statements, with NOFORN and Official Use Only documents subject to additional certification processes. All responses must be submitted by the deadline of July 10, 2026, and the award will be bilateral, requiring written contractor acceptance before execution.
Navsup Weapon Systems Support Mech

POSTED

1 day ago

DEADLINE

in 13 days
View Details