Reservoir 1 Water Treatment Plant Filter Valve Replacement Project
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → El Dorado Irrigation District
NAICS
237990 - Other Heavy and Civil Engineering ConstructionView NAICS
Place of Performance
Gilmore Road and Shady Lane, CA, 95726Set-Aside
NONE
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → El Dorado Irrigation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → El Dorado Irrigation District
Office AddressN/A
Contacts
Full Description
Show more
The El Dorado Irrigation District (District) proposes to replace the existing filtration valves and actuators that operate the filter effluent, filter-to-waste, and backwash air processes at the Reservoir 1 Water Treatment Plant (Res 1 WTP). The valves and actuators have reached the end of their useful life and require replacement to maintain service and water treatment reliability. Project activities will involve the removal of the existing valves and actuators, installation of the new valves and actuators, and associated mechanical and electrical work. All construction activities will occur within the existing Res 1 WTP facility and involve no new ground disturbing activities. The new valves and actuators are an in-kind replacement and will not increase or expand drinking water treatment capacity. The lead time for purchasing the valves and actuators is estimated to be up to 37 weeks and installation is planned to be performed during the annual outage in the fall 2026 and completed by spring 2027.
Similar Contracts
Same NAICS industry code
