Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Metro Mobility Hubs (Norwalk Station, and Harbor Gateway Transit Center, and Memorial Park Station) Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Los Angeles County Metropolitan Transportation Authority (Metro) is advancing a project to enhance three existing transit stations—Norwalk Station, Harbor Gateway Transit Center, and Memorial Park Station—by transforming them into integrated Mobility Hubs. The initiative focuses on minor, non-expansive improvements within existing rights-of-way to improve safety, accessibility, and seamless transfers between transportation modes, with particular emphasis on facilitating first- and last-mile connectivity. Work includes upgrades to pedestrian access, wayfinding signage, waiting areas, and overall station environments to encourage multimodal usage without increasing the physical footprint of the facilities. The project has been determined eligible for a categorical exemption under California Environmental Quality Act (CEQA) Section 15301 as it involves alterations to existing public infrastructure with no significant environmental impact, and complies with relevant provisions of the Public Resources Code. The initiative is currently in the pre-solicitation forecast phase, with no formal contract awarded, no cost estimates provided, and no detailed performance timeline or delivery schedule established. The lead agency contact is Meghna Khanna, Deputy Executive Officer, reachable via phone and email for inquiries. While the location of performance is clearly defined as Los Angeles County, California, no specifics are provided regarding payment procedures, invoicing methods, accounting codes, or contract administration details such as the designation of a Contracting Officer’s Representative or Procuring Contracting Officer. The project does not include requirements for packaging, labeling, technical inspections, or compliance with federal standards like MIL-STD, and no socioeconomic set-asides, certifications, or offeror representations are applicable or disclosed. The procurement process has not yet issued a solicitation number, amendment, or formal contract type, and no deadline or submission portal for bids has been announced.

General Info

Metro enhances three transit stations in LA County with minor upgrades for safety, accessibility, and multimodal connectivity.

Agency

California → Los Angeles County Metropolitan Transportation Authority

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

MCP Phase2 Mobility Hubs Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles County Metropolitan Transportation Authority
Contacts1 person available
OfficeN/A
Organization / Agency
California → Los Angeles County Metropolitan Transportation Authority
Office AddressN/A
Contacts
Meghna KhannaDeputy Executive Officer

Full Description

Show more
The Los Angeles County Metropolitan Transportation Authority (Metro) proposes improvements at existing stations to create Mobility Hubs (Project) to support safe and convenient transfers between transportation modes, support first/last mile connections to transit, and enhance the viability of travel options. The Project includes improvements within and in the immediate area surrounding the Mobility Hub stations within Metro and/or City-owned rights-of-way.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details