Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

San Luis Canal (California Aqueduct Pools 20 and 21) Liner Raise Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves raising the concrete liner of Pools 20 and 21 along the California Aqueduct between Milepost 158.7 and Milepost 170.3 to ensure continued reliable water delivery to public water agencies, enhance operational flexibility, and improve safety. Work will occur in Fresno and Kings Counties near Huron, California, with construction scheduled to begin in 2027 and last approximately nine months. Activities include drainage installation, earthwork, and concrete placement along the aqueduct embankments, with stringent environmental controls to minimize impacts, such as dust suppression, erosion prevention, wildlife protection, and restrictions on nighttime work near sensitive habitats. All construction must comply with the California Environmental Quality Act, California Endangered Species Act, U.S. Army Corps of Engineers wetland delineation standards, and San Joaquin Valley Air Pollution Control District emissions guidelines. The California Department of Water Resources is the lead agency and contracting authority, with Marea Bell serving as the primary point of contact for environmental coordination. The project requires extensive environmental documentation, including biological, cultural, and tribal consultation reports, as well as air quality and greenhouse gas emissions analyses. While no formal contract value is specified, cost estimates are referenced across multiple years including $8.7 million in 2027 and $4.4 million in 2028, though these lack formal contract line identification. The place of performance is clearly defined at the aqueduct site with access via Gale and Quail Avenues, and inspections will be conducted on-site by DWR. Although the solicitation is listed as a forecast and lacks standardized federal acquisition clauses, payment, invoicing methods, accounting codes, or evaluation factors, the project adheres to state regulatory frameworks and requires coordination with tribal entities such as the Santa Rosa Rancheria Tachi Yokut Tribe. Proposals must be submitted by mail or email by the extended deadline of December 17, 2025, with electronic formats preferred and hard copies optionally provided.

General Info

Raise concrete liner in Pools 20–21, 2027–2028, with environmental compliance and tribal coordination along California Aqueduct.

Agency

California Water Resources, Department of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

W Clarkson Avenue; Quail Avenue, Huron, CA, 93234

Set-Aside

NONE

Documents

(7)

CDFW Comment Letter on San Luis Canal Liner Raise Projects MNDs

PDFcomment-letter

San Luis Canal Liner Raise Project Final IS/MND March 2026

PDFfinal-is-mnd

San Luis Canal Liner Raise Project Notice of Completion

PDFnotice-of-completion

San Luis Canal Pools 20 and 21 Liner Raise Project SCH Summary

PDFenvironmental-summary

San Luis Canal Pools 20 and 21 Liner Raise Project IS/MND October 2025

PDFinitial-study-mitigated-negative-declaration

Notice of Intent for San Luis Canal Pools 20 and 21 Liner Raise Project

PDFpresolicitation

San Luis Canal Pools 20 and 21 Liner Raise Project Notice of Completion

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Marea BellSenior Environmental Scientist, Specialist
Catherine McEfeeVice President

Interested Companies (2)

Show more
ESA
Sacramento, CA
Environmental Science Associates
Los Angeles, CA

Full Description

Show more
The proposed project would raise portions of the concrete liner of the California Aqueduct's Pools 20 and 21 between Milepost (MP) 158.7 and MP 170.3 to maintain functionality in Pools 20 and 21 to enable DWR to avoid future disruptions of water deliveries to the Public Water Agencies, thereby maintaining operational flexibility and improving safety and reliability. The existing concrete liner would be raised over approximately 18 miles, with varying raise heights: up to 1.5 feet over 5 miles, up to 2.5 feet over 3.5 miles, and up to 3 feet over 9.5 miles. Construction activities would be performed above the waterline and would not require dewatering of the Aqueduct. Work would include excavation and use of on-site borrow material, road drain rerouting, and the removal and reinstallation of guardrails, road delineators, and other existing features to accommodate the liner raise. Construction is anticipated to begin in 2027 and conclude within nine months.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
45th Ave SW Culvert Replacement and Habitat Restoration
Solicitation # 45th-ave-sw-culvert-replacement-habitat-restoration
The City of Seattle is seeking contractors for the replacement of a culvert along 45th Avenue SW and the associated restoration of surrounding habitat, with the project located in King County, Washington. The solicitation, identified as 2025-017, is open to Minority Business Enterprises certified by NMSDC and Woman Business Enterprises certified by WBENC, reflecting the city’s commitment to inclusive contracting practices. The work involves the removal of the existing infrastructure and installation of a new culvert system designed to improve water flow and structural integrity, while simultaneously restoring natural habitat features to support local ecosystems. The project is classified under NAICS code 237990, indicating it falls under other heavy and civil engineering construction, and the prime contractor is Shimmick Construction Company, Inc., which manages the solicitation process and serves as the point of contact for inquiries. The response deadline is August 12, 2026, with Jamie Miranda listed as the primary contact for all communications, reachable at 707-410-5070 or jmiranda@shimmick.com. While the physical location is in Seattle, no specific street address or zip code is provided in the data, and all performance is expected to occur within the state of Washington.
Shimmick Construction Company, Inc

POSTED

about 9 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237990
New
International
City of Calgary - Request for Proposal - RFP 26-1667 For Glenmore RWPS Penstock Crossover Piping and Valve Replacement
Solicitation # AB-2026-05612
The City of Calgary is seeking qualified contractors to perform construction services for the Glenmore Raw Water Pump Station Penstock Crossover Piping and Valve Replacement project, which involves the complete replacement of existing penstock crossover piping and associated valves, demolition of the current standpipe, and lead abatement on existing infrastructure. The scope includes the supply, installation, testing, and commissioning of new crossover and standpipe piping systems, along with all valves, fittings, supports, steelwork, platform structures, grating, and other miscellaneous metalwork required to restore and enhance system functionality. All work must comply with applicable safety and environmental standards, particularly regarding lead abatement procedures. This opportunity is exclusively available to contractors pre-qualified by the City of Calgary and is issued under solicitation number AB-2026-05612, posted on August 8, 2026, with responses due by September 1, 2026. Proposals must be submitted via SAP Ariba, where detailed technical and administrative requirements are outlined in the RFP documents. The project is located in Alberta, and all inquiries should be directed to Waris Khattana, the primary point of contact, via the provided email or phone number. Only firms meeting the City’s pre-qualification criteria will be considered for award.
City of Calgary

POSTED

about 12 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237990
New
SLED
27003-B Solids Removal
Solicitation # PE-65600-NONST-2027-000000250
Fayette County, Georgia is soliciting bids for the dredging and solids removal from lagoons under solicitation number PE-65600-NONST-2027-000000250, titled 27003-B Solids Removal. Interested contractors must submit their proposals by 3:00 p.m. on Tuesday, September 8, 2026, to the Purchasing Department located at 140 Stonewall Avenue West, Suite 204, Fayetteville, GA 30214. The opportunity is open to all qualified bidders without specific set-aside restrictions, and all bids must comply with the detailed requirements outlined in the attached Invitation to Bid document. The work will be performed within Fayette County, Georgia, and the county anticipates selecting a contractor capable of safely and efficiently removing accumulated solids to maintain lagoon functionality and regulatory compliance. All questions regarding the bid should be directed to Colette Cobb, the primary point of contact, via email at ccobb@fayettecountyga.gov or by phone at 770-305-5115. The solicitation was posted on August 7, 2026, and additional information, including full bid documents, can be accessed through the official state procurement portal using the provided UI link. Contractors are responsible for reviewing all documentation thoroughly prior to submission, as failure to meet specifications or deadlines may result in bid rejection. The county reserves the right to accept or reject any or all bids without explanation, and award decisions will be made based on compliance, competitive pricing, and demonstrated technical capability.
Fayette County Board of Commissioners

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Fern Ridge Wildlife Area Coyote Creek Boating Access
Solicitation # S-63500-00017424
The Oregon Department of Fish and Wildlife is soliciting bids for the construction of a boating access facility at Coyote Creek within the Fern Ridge Wildlife Area under solicitation number S-63500-00017424. The project involves a range of civil and infrastructure construction activities including earthwork, driving steel piles, installing a paddle craft launch dock, sheet piling, storm drain piping and conveyance systems, aggregate base placement, concrete curbing and sidewalk construction, and asphalt paving. All work must be completed in accordance with specifications to ensure safe and durable access for recreational boating users. The solicitation is open to qualified contractors with no specific set aside identified and is managed through the state agency’s procurement system. Responses are due by September 3, 2026, at 11:00 PM Pacific Time, with the request publicly posted on August 7, 2026. The contract will be managed by the Oregon Department of Fish and Wildlife based in Salem, Oregon, with Claire Duvall listed as the primary point of contact. The place of performance is located in Salem, Oregon, and all work must be carried out at the designated site within the Fern Ridge Wildlife Area. Contractors are expected to comply with all state and federal regulations governing construction in protected wildlife areas, and full details are accessible through the provided online portal.
ODFW

POSTED

about 17 hours ago

DEADLINE

in 26 days
View Details