San Clemente Beach Replenishment Program

Forecast
A4919State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Clemente Beach Replenishment Program consists of a 10-year General Lease for Public Agency Use extending through 2035. Approved by the California State Lands Commission on November 7, 2025, the program authorizes the City of San Clemente to place up to 200,000 cubic yards of sand from upland sources annually onto sovereign land in the Pacific Ocean. This replenishment effort is divided between two primary receiver sites, with a maximum of 125,000 cubic yards allocated annually to North Beach and a maximum of 75,000 cubic yards allocated annually to Linda Lane Beach. The project is subject to the guidelines of a Mitigated Negative Declaration prepared under the California Environmental Quality Act, as well as a Mitigation Monitoring and Reporting Program adopted by the City of San Clemente on October 7, 2003. Performance takes place in San Clemente, Orange County, specifically adjacent to North Beach, Linda Lane Beach, and the North and South T-Street Beaches. The program is identified by solicitation number A4919 and is managed through the California State Lands Commission as the responsible agency.

General Info

City of San Clemente 10-year lease for annual beach sand replenishment through 2035.

Agency

California → City of San Clemente

Place of Performance

San Clemente, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Clemente
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of San Clemente
Office AddressN/A
Contacts
Christine DaySenior Environmental Scientist

Full Description

Show more
Placement of up to 200,000 cubic yards of sand per year from upland sources at two receiver sites: a maximum of 125,000 cubic yards of sand annually at North Beach, and a maximum of 75,000 cubic yards annually at Linda Lane Beach, City of San Clemente. The State Lands Commission action is approval of a 10-year General Lease – Public Agency Use through 2035.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 5 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, fence installation covering 500 meters, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. The work must adhere to specific standards, including the Agency Guide to Cave and Mine Gates 2009 and a Physical Mine Hazards Risk Assessment. The anticipated contract start date is January 7, 2026, with a primary term of two years and an option to extend for one additional year. The selection process is a three-stage evaluation. Stage 1 verifies mandatory requirements, while Stage 2 evaluates technical capabilities, requiring a minimum score of 70% to proceed. Technical evaluation focuses on project experience, roles and responsibilities, occupational health and safety, and a plan for Indigenous community beneficial participation. Stage 3 is a commercial evaluation based on the lowest bid price. Bidders must provide a detailed methodology, a Gantt chart schedule, and focused resumes for key personnel, including a Professional Engineer and various technical leads. Mandatory requirements include proof of W.S.I.B coverage, insurance, and tax compliance verification.
Energy and Mines

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 7 hours ago

DEADLINE

in about 1 year
View Details
NAICS: 237990
New
SLED
Carroll Creek Stream Restoration - CIP# 350007 (MWBE Goals)
Solicitation # IFB-27-11
The Carroll Creek Stream Restoration project (CIP# 350007), issued by the City of Frederick, Maryland under solicitation IFB-27-11, is a comprehensive construction effort located near Old Gas House Pike. The scope of work includes in-stream structure installation, floodplain bench grading, bank stabilization, and extensive planting. Key technical requirements involve the use of a Stream Restoration Plan, supplemental specifications, and the installation of reinforced soil lifts, riparian seed mixes, and various culverts. The project has an estimated value of approximately 6.88 million dollars and is expected to be completed within 180 days of the Notice to Proceed. Bidders must comply with strict submission requirements via the OpenGov Portal, including a detailed electronic project schedule and a list of three equivalent projects completed within the last four years. The contract emphasizes socioeconomic goals with participation targets of 31 percent for MBE, 11 percent for WBE, and 2 percent for SDVOSB. Financial security is mandated through a 5 percent bid bond, followed by 100 percent performance and materialmen bonds upon award, and a two-year maintenance bond upon final acceptance. Contract administration includes a two-year guarantee on all work and materials, with liquidated damages set at 500 dollars per calendar day for delays beyond the substantial completion date. The City of Frederick reserves the right to withhold payment if the required progress schedule is not submitted. Evaluation for award is based on the vendor's responsiveness to material requirements and their overall responsibility, including technical capability, integrity, and performance record.
Engineering

POSTED

about 8 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
SLED
Northside Park Site Improvements
Solicitation # RFP #27032
The County of Greenville is soliciting proposals from qualified general contractors for site improvements at Northside Park in Taylors, South Carolina. The scope of work includes comprehensive renovations involving demolition of existing pavement, fencing, and amenities, as well as the installation of new heavy-duty concrete paving, a 27'x40' pavilion shade structure, and expanded athletic courts including additional pickleball courts. The project also encompasses site work, grading, stormwater treatment, and landscaping, including the installation of sod and specific UltraSite branded park furniture. All work must adhere to building codes and the full intent of ADA Title II guidelines. The project is scheduled to begin with a Notice to Proceed on December 28, 2026, with construction starting January 1, 2027, and a desired completion date of May 15, 2027. Proposals are evaluated on a 25-point scale across five equally weighted categories: responsiveness, experience, references, pricing, and project-specific approach. Awarded contractors must provide a Performance and Payment Bond for the total contract price and maintain all required insurance. Payment is based on monthly invoicing with a 30-day term, and the County will withhold 10 percent of each payment until the project is satisfactorily completed. Liquidated damages of $250 per day apply if the work is not completed within 90 calendar days of the Notice to Proceed. All submissions must be received electronically via the County's procurement portal by November 25, 2026.
PARKS ADMINISTRATION

POSTED

about 9 hours ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS