Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

San Clemente Beach Replenishment Program

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Clemente Beach Replenishment Program is a 10-year initiative approved through a General Lease – Public Agency Use extending through 2035, authorizing the annual placement of up to 200,000 cubic yards of sand from upland sources onto two designated beach areas: North Beach, with a maximum of 125,000 cubic yards per year, and Linda Lane Beach, with a maximum of 75,000 cubic yards annually. The project, led by the City of San Clemente and overseen by the California State Lands Commission, is designed to sustain beach width and protect coastal infrastructure by replenishing eroded shorelines. Environmental compliance is governed by the California Environmental Quality Act (CEQA), as confirmed by the adoption of a Mitigated Negative Declaration and a Mitigation Monitoring and Reporting Program, which outline required environmental protections and performance oversight without specifying technical material standards such as sand gradation or equipment specifications. The place of performance is limited to the coastal areas of San Clemente, California, with no formal delivery terms, FOB conditions, or invoicing protocols detailed in the available documentation. No pricing data, contract value estimates, or financial clauses are provided, and while the lease term spans a decade, no explicit start or end dates for performance periods are given. There is no indication of federal procurement structure, including Federal Acquisition Regulation clauses, contracting officer appointments, evaluation factors, or contractor certifications, and the project operates as a public agency environmental management effort rather than a competitive federal contract. The City of San Clemente serves as the lead applicant and managing entity, with the State Lands Commission providing regulatory approval, and all activities are constrained by the approved annual sand volume caps and environmental mitigation requirements.

General Info

10-year beach replenishment program authorizing up to 200,000 cubic yards of sand annually to North and Linda Lane Beaches.

Agency

California → City of San Clemente

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

San Clemente, CA

Set-Aside

NONE

Documents

(1)

Notice of Determination for San Clemente Beach Replenishment Program A4919

PDFdetermination-and-findings

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Clemente
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of San Clemente
Office AddressN/A
Contacts
Christine DaySenior Environmental Scientist

Full Description

Show more
Placement of up to 200,000 cubic yards of sand per year from upland sources at two receiver sites: a maximum of 125,000 cubic yards of sand annually at North Beach, and a maximum of 75,000 cubic yards annually at Linda Lane Beach, City of San Clemente. The State Lands Commission action is approval of a 10-year General Lease – Public Agency Use through 2035.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details