Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Schauer Pond Outlet Spillway Project (Notification of Lake or Streambed Alteration, No. EPIMS-MEN-51960-R1C)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS-MEN-51960-R1C with Terry Schauer, pursuant to Section 1602 of the Fish and Game Code. Located in the Big River watershed in Mendocino County, California, the Schauer Pond Outlet Spillway Project is limited to one encroachment. The scope of work involves the removal of an existing spillway culvert and outlet chute from an on-stream pond and the installation of a new, appropriately sized culvert and downspout. The new installation must align with the outlet stream channel, discharge past the toe of the pond embankment, and create two feet of freeboard in the pond. To address ongoing erosion, the project requires the outlet stream channel and banks to be armored with appropriately sized riprap rock. Construction activities include excavation, culvert replacement, backfilling, compaction of fill, and rock armoring. All work must be completed according to the notification submitted on August 15, 2025. The project has been granted a Notice of Exemption based on categorical exemptions for minor alterations with no significant environmental impact. Administration of the project is managed by John Herrera, Senior Environmental Scientist Specialist with the California Department of Fish and Wildlife.

General Info

CDFW agreement for Terry Schauer to replace pond spillway and armor stream banks.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

approximately 9.7 miles west of the City of Ukiah, Ukiah, CA

Set-Aside

NONE

Documents

(1)

EPIMS-MEN-51960-R1C Schauer Pond Outlet Spillway Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
John HerreraSenior Environmental Scientist Specialist
Terry SchauerPlease contact John Herrera of CDFW

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-MEN-51960-R1C, pursuant to Section 1602 of the Fish and Game Code to Terry Schauer. The Project is limited to one encroachment. The proposed encroachment is to remove a spillway culvert and outlet chute from an on-stream pond and install a new spillway culvert. The new spillway will have an appropriately sized culvert and downspout that will 1) be in line with the outlet stream channel, 2) will discharge past the toe of the pond embankment, and 3) create 2 feet of freeboard in the on-stream pond. The outlet stream channel and banks will be armored with appropriately sized riprap rock to address ongoing erosion. Work for this encroachment will include excavation, removal of the existing culverts, replacement with new properly sized culvert, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. All work will be completed as specified in the most recent version of the Notification submitted on August 15, 2025.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 22 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS