GEORGIANA SLOUGH EROSION CONTROL AND HABITAT ENHANCEMENT PROJECT

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Brannan-Andrus Levee Maintenance District is implementing the Georgiana Slough Erosion Control and Habitat Enhancement Project to address upper slope erosion and significant lower slope undercutting along the right bank levee of Georgiana Slough on Lower Andrus Island in Sacramento County. The project scope involves four primary phases: mobilization, site preparation, levee slope and bench construction, and site demobilization. Key technical requirements include the placement of quarry stone rip rap at the toe of the levee to serve as a foundational base for a habitat bench. All fill and aggregate base materials must be roller compacted to a relative compaction of at least 95 percent per ASTM D1557-91 standards. The project is supported by a 20-year General Lease for Public Agency Use issued by the State Lands Commission, effective through November 6, 2045. Environmental compliance is managed through a Mitigated Negative Declaration and a Mitigation Monitoring and Reporting Program, with a recent addendum confirming that modifications to construction sequencing and material handling do not create new significant environmental effects. The work is located on sovereign land near the confluence of the Mokelumne River, specifically adjacent to Assessor's Parcel Numbers 156-0080-042 and 156-0090-001.

General Info

Brannan-Andrus District project for Georgiana Slough levee erosion control and habitat enhancement.

Agency

California → Brannan-Andrus Levee Maintenance District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(2)

Georgiana Slough IS Addendum 07222025

PDFaddendum

Notice of Determination for Georgiana Slough Erosion Control Project A4896

PDFdetermination-and-findings

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Brannan-Andrus Levee Maintenance District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Brannan-Andrus Levee Maintenance District
Office AddressN/A
Contacts
Christopher HallEnvironmental Scientist
Emily PappalardoDistrict Engineer

Interested Companies (1)

Show more
Brannan-Andrus Levee Maintenance District
Walnut Grove, CA

Full Description

Show more
The Brannan-Andrus Levee Maintenance District (BALMD) is proposing the Georgiana Slough Erosion Control and Habitat Enhancement Project to resolve upper slope erosion problems and a major lower slope undercutting issue along the right bank levee of Georgiana Slough, on Lower Andrus Island. The Proposed Project would involve construction of proven erosion control methods involving placement of quarry stone rip rap (or rock slope protection) at the toe of the levee, which doubles as a foundational base for a habitat bench that will be constructed along the entire length. The State Lands Commission action is issuance of a 20-year General Lease – Public Agency Use through November 6, 2045

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The scope of work includes the dredging and ocean disposal of approximately 4,260 cubic yards of material, vegetation clearance, and stone rework for the revetted mole. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a price evaluation preference. Bidders must submit physical sealed envelopes by the deadline, as electronic submissions are prohibited. Required documentation includes SF 1442, the CLIN schedule, representations and certifications, and a bid guarantee. The contractor must provide key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Performance will be measured through pre- and post-dredge multi-beam surveys conducted by a third-party surveyor, and the contract includes liquidated damages of 2,297 dollars per calendar day of delay. Compliance with the Davis-Bacon Act and strict environmental and safety standards is required throughout the execution of the work.
Healy Tibbitts Builders, Inc.

POSTED

about 7 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 10 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price construction contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include demolition, clearing and grubbing, excavation, placing embankment, installing separator geotextiles, placing graded stone, and turf establishment and maintenance. Bids are due by October 19, 2026, at 10:00 a.m., with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on unit prices, provided they are reasonable and balanced. The contractor must adhere to EM 385-1-1 safety standards and the Davis-Bacon Act for prevailing wages. Performance requirements include submitting a preliminary project schedule within 15 days and an initial schedule within 42 days of the Notice to Proceed. The contract includes liquidated damages of $4,295.00 per calendar day of delay and requires the use of approved testing laboratories for quality control. A project labor agreement is not required for this acquisition.
W07V Endist New Orleans

POSTED

about 11 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS