Deferred Maintenance Project - Pipe Removal
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Reclamation District 536 is undertaking a deferred maintenance project to remove a deteriorating 24-inch steel discharge pipe and associated flap gate located within the district’s levee system. The pipe has been determined to be nonessential to current drainage operations and its continued existence poses a risk to the structural integrity of the levee. The removal effort is designed to eliminate this vulnerability and enhance the long-term reliability of the flood protection infrastructure. The project is forecasted with no solicitation number or set-aside classification, and the work is anticipated to occur in California. All inquiries should be directed to Jesse Barton, Legal Counsel, via email or phone provided. The project is publicly listed with a unique identifier on the CEQA Net system for transparency and compliance tracking.
General Info
Agency
Place of Performance
CASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Prepare for this forecast
Research this forecast and prepare for the solicitation
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
