Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on November 1, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Roadway Reconstruction and Pavement Design

Closed
State & Local
Submission Closed

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Federal
Consulting Services for Chino Basin Program Aquifer Replenishing Facilities Design
Solicitation # RFP-JV-26-013
The Inland Empire Utilities Agency (IEUA) is soliciting consulting services for the Chino Basin Program Aquifer Replenishing Facilities Design Project (RFP-JV-26-013). The scope of work encompasses project initiation, data gathering, basis of design, detailed design, and procurement support. The project must adhere to IEUA Engineering Design Guidelines, SCADA Standards, and Title 22 regulations for treated wastewater. This is a not-to-exceed contract paid on a time and material basis, with proposals due by January 26, 2027. The set-aside status is designated for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Selection is based on a ranking of proposals evaluating the project team, level of effort, and fee estimates, with potential interviews for critical project components. The top-ranked consultant will negotiate the final contract terms for approval by the IEUA Board of Directors. Because the project involves federal and state funding, the consultant must comply with the Davis-Bacon Act, the Endangered Species Act, and various equal opportunity and non-discrimination requirements. All payments are processed via ACH, and the agency retains full ownership and confidentiality of all reports, drawings, and data produced during the performance of the contract.
Inland Empire Utilities Agency

POSTED

about 3 hours ago

DEADLINE

in about 2 months
NAICS: 541330
New
Federal
RFP-JV-26-014 Consulting Services for Chino Basin Program Purified Water Conveyance Design Project
Solicitation # EN25022.03 AND EN28004
The Inland Empire Utilities Agency is soliciting professional engineering consulting services for the Chino Basin Program Purified Water Conveyance Design Project in California. The scope of work involves the design and bid period assistance for a purified water conveyance system that delivers water from the Advanced Water Purification Facility to injection wells. Key responsibilities include project initiation, data gathering, detailed design, providing opinions of probable construction cost, and supporting the bid award process. The project requires adherence to specific engineering design guidelines and compliance with 2 CFR Part 200, as well as various federal and state grant funding requirements, including the Davis-Bacon Act and Buy America preferences. This is a not-to-exceed contract with a required initial two-year firm pricing term. The solicitation is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Proposals are due by January 26, 2027, and will be evaluated on a 100-point scale focusing on technical challenges, risk mitigation, and project implementation. Selection involves a ranking process where the top three consultants will have their fee envelopes opened and may be interviewed before final approval by the IEUA Board of Directors.
Inland Empire Utilities Agency

POSTED

about 3 hours ago

DEADLINE

in about 2 months
NAICS: 541330
New
International
Transportation and Economic Corridors - Request for Proposal - CON0025985 & CON0026229 – Engineering Consultant Services for Hwy. 901:48, Intersection Improvements & Hwy. 5:06, Passing Lanes
Solicitation # CON0025985
Alberta Transportation and Economic Corridors is requesting proposals for engineering consultant services for two distinct projects in Alberta. Contract A (CON0025985) focuses on intersection improvements at seven locations within Siksika Nation on Highway 901:48, while Contract B (CON0026229) involves the design and implementation of passing lanes on Highway 5:06 between the Town of Magrath and the City of Lethbridge. The scope of work for both contracts encompasses the full project lifecycle, including preliminary engineering, detailed design, contract tendering, construction supervision, and post-construction warranty inspection. Construction is anticipated to be completed by October 2028, with overall service completion expected by December 31, 2029. This is a restricted RFP available only to short-listed prequalified consultants, specifically Eagle Engineering Corporation, ISL Engineering and Land Services Ltd., and McElhanney Ltd. Selection will be based on a value-based process considering both qualifications and price rather than the lowest cost. The contract utilizes a hybrid payment structure consisting of lump-sum payments for preliminary engineering, detailed design, contract tendering, and post-construction, while construction supervision and warranty inspections are paid via hourly rates plus disbursements. Proposals must be submitted as two separate PDF files—one for qualifications and one for fees—each under 10MB, with a submission deadline of January 11, 2027.
Transportation and Economic Corridors

POSTED

about 11 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

Lake County in California is seeking a subcontractor to provide comprehensive civil design services for a roadway reconstruction and pavement design project. The scope of work includes the development of roadway alignment, grading, and pavement structures, as well as the design of drainage systems and ADA-compliant curb ramps. The solicitation was posted on November 1, 2025, with a response deadline of December 1, 2025. This opportunity falls under NAICS code 541330 and is managed by Lake County, with further details and bidding information available through their official procurement portal.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 261483.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Request for Qualifictions Civil Design Engineering On-Call Services

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Consulting Services for Chino Basin Program Aquifer Replenishing Facilities DesignOpen now, due in 60 days
  • DBE Subconsultant Opportunity - Qualifications for E Wells PFAS Groundwater Treatment ImprovementsOpen now, due in 5 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Lake County
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Lake County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Civil design services for roadway reconstruction including alignment, grading, pavement structure, drainage, and ADA-compliant curb ramps.

More opportunities from California → Lake County

Same awarding agency

NAICS: 238910
SLED
Seigler Springs North
Solicitation # PL-26-115
The Seigler Springs North project, identified by Major Use Permit PL-26-115/UP 21-17, is an approved cannabis cultivation operation located at 11615 and 11625 Seigler Springs North Road in Kelseyville, California. Approved by the Lake County Board of Supervisors on August 4, 2026, the project includes three A-Type 3 outdoor cultivation licenses with a total canopy of 130,680 square feet and a total cultivation area of 196,020 square feet. The site infrastructure consists of twenty-two 40 by 100 foot temporary light deprivation hoop-houses secured by a six-foot fence, two 8 by 40 foot shipping containers, a 40 by 20 foot compost area, and a 5,000-gallon fire suppression system. Additional facilities include one ADA-compliant portable restroom, a 15 by 15 foot trash enclosure, and five parking spaces, one of which is dedicated to ADA access. The project also includes a Type 13 Distributor Transport Only license for self-distribution and a Complex Grading Permit. Environmental compliance is managed under CEQA, with a Mitigated Negative Declaration confirming no significant environmental effects. Key requirements include the removal of approximately 128,000 square feet of vegetation, strictly limited to dead, dying, or diseased trees as identified by a certified forester or arborist. To mitigate habitat disturbance, the project establishes a 20-acre No Development Zone and requires the planting and protection of over 327 black oak saplings for seven years. The operation must adhere to California Public Resources Code sections 4290 and 4291 for defensible space, California Building Code Chapter 7A, and Lake County Air Quality Management District regulations. Operational mandates include maintaining Material Safety Data Sheets for all hazardous materials, storing pesticides in original labeled containers, and submitting a Site Management Plan under Order No. WQ 2019-001-DWQ for water quality compliance.
Site Preparation Contractors

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 111419
SLED
East Side Farms Expansion
Solicitation # PL-25-243
East Side Farms, Inc. has obtained discretionary approval from the County of Lake for Major Use Permit PL-25-243 to operate a commercial cannabis cultivation project in Middletown, California. The project is located across multiple parcels on Jerusalem Grade and features a maximum outdoor canopy of 50,560 square feet along with a Type 13 self-transport only distribution license. The site infrastructure includes two groundwater wells for irrigation, a 2,100 square foot greenhouse for immature plants, a 3,000 square foot processing building, and existing facilities for drying and harvest storage. The project was approved on July 9, 2026, following a Negative Declaration under the California Environmental Quality Act, indicating no significant environmental impacts. Operational compliance is governed by several comprehensive plans, including a Property Management Plan, a Biological Resources Assessment, and a Hydrogeologic Assessment confirming sustainable groundwater use. A specialized Drought Management Plan mandates water conservation measures and a minimum 10 percent reduction in canopy area and water use during declared emergencies. Strict environmental and safety protocols are required, including the use of bear-proof waste containers, secondary containment for petroleum products, and the maintenance of Material Safety Data Sheets for all hazardous materials. Additionally, the project must adhere to an Air Quality Management Plan with a specific Odor Response Program and ensure ADA compliance through the installation of permeable paver parking.
Other Food Crops Grown Under Cover

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
Guenoc Valley Mixed-Use Planned Development Project
Solicitation # DA24-01
The Guenoc Valley Mixed-Use Planned Development Project, identified by solicitation number DA24-01, is a phased development in Middletown, Lake County, California, led by applicant Lotusland Investment Holdings Inc. The project encompasses the construction of resort facilities, including residential units, boutique hotels, neighborhood-serving retail, restaurants, open space, and off-site workforce housing. A key component of the development is the Anasu Farms Tentative Subdivision Map, which involves eight phases and the creation of 34 new parcels, including 30 resort residential, one commercial, and three facilities parcels, along with six peripheral parcels and a community clubhouse. Infrastructure work is a critical part of the project, specifically the Guenoc Ranch Tier 2 and 3 Roads, which involves widening and realigning existing roadways to meet safety standards, constructing new crossings, and repairing or installing 11 culverts. This work is governed by Lake and Streambed Alteration Agreement EPIMS Notification Number LAK-15321-R2 from the California Department of Fish and Wildlife. The project has undergone comprehensive environmental review under CEQA, with a certified Environmental Impact Report and adopted mitigation measures. Administrative approvals include a Development Agreement approved by the Lake County Board of Supervisors on October 21, 2025, and a Water Supply Assessment.
Land Subdivision

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
South Main Street and Soda Bay Road Widening and Bike Lanes ProjectThe South Main Street and Soda Bay Road Widening and Bike Lanes Project in Lake County, California, involves the rehabilitation and expansion of a roadway corridor located just south of Lakeport. The scope of work covers a 0.5-mile segment of South Main Street and approximately 0.8 miles of Soda Bay Road. Key infrastructure improvements include the construction of two 12-foot wide travel lanes, a continuous 12-foot wide center turning lane, and 8-foot wide paved shoulders designed as Class II bicycle facilities. Additional deliverables include the undergrounding of overhead utility lines, surface drainage improvements, and a safety correction to a horizontal curve on Soda Bay Road to increase its radius from 230 to 550 feet. The project is governed by CEQA and NEPA environmental standards, with recent addendums approved in November 2025 to allow for nighttime construction to maintain vehicle and business access. Environmental compliance includes a Streambed Alteration Agreement with the California Department of Fish and Wildlife and adherence to the Statewide NPDES General Construction Activity Permit. Construction is expected to span two seasons and may be implemented in two phases depending on funding. Critical scheduling constraints require that all in-channel and culvert work be performed during the dry season and outside the Clear Lake Hitch spawning season. The project is managed by Lake County, with oversight from the Lake County Department of Public Works and the Community Development Department.
Highway, Street, and Bridge Construction

POSTED

12 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Cobb Community Park General Plan of Conformity and Initial Study (PL-25-96)
Solicitation # PL-25-96
The Cobb Community Park Project (PL-25-96) is a phased development initiative by the County of Lake to establish a community park at 16540 State Highway 175 in Cobb, California. The project is designed to increase local access to open space and recreational facilities across four distinct phases. Phase 1 focuses on the western recreation area with a main parking lot, restrooms, picnic areas, and a dog run. Phase 2 involves the construction of a pedestrian bridge over Kelsey Creek, a retaining wall, and natural surface trails. Phase 3 centers on native species restoration and the removal of invasive species along the creek, while Phase 4 adds a secondary parking lot and concrete walk at the north corner along Golf Road. The project is governed by the California Environmental Quality Act (CEQA), with a Mitigated Negative Declaration confirming that the development will not have a significant environmental effect provided specific mitigation measures are followed. Key compliance requirements include adherence to Lake County's Oak Woodland Management Policy and the Municipal Code Grading Ordinance. Environmental protections are managed through a Mitigation Monitoring and Reporting Program, which includes botanical and nesting bird surveys, tree protection zones, and strict protocols for the discovery of archaeological resources. Operational and safety requirements are stringent, requiring the construction of emergency access routes capable of supporting 75,000-pound vehicles and maintaining a 15-foot vertical clearance. Fire safety is prioritized through the establishment of defensible space and the construction of emergency turnouts approved by the County Fire Marshal. Construction is restricted to Monday through Saturday, from 7:00 a.m. to 7:00 p.m., and is strictly prohibited on red flag warning days, Sundays, and federal holidays. The project is managed by the Lake County Community Development Department Planning Division, with Michelle Irace serving as the Senior Planner.
Environmental Consulting Services

POSTED

12 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS