Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Roofing System Replacement – Prime Trade Contractor

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract mandates the complete removal and replacement of roofing systems across six historic structures at Birch Creek CCC Camp, requiring full demolition of existing roofs followed by installation of new components including underlayment, sheathing, SBS modified bitumen rolled roofing, flashing, drip edge, trim, and comprehensive waterproofing measures to ensure long-term durability and structural integrity. All work must adhere to preservation standards appropriate for historic buildings while meeting modern performance and safety requirements. This is a total small business set-aside subcontract under NAICS code 238160, awarded by the U.S. Department of Agriculture through the USDA-FS Intermountain 8 office, with performance located in Dillon, Montana, zip code 59725. The solicitation was posted on July 23, 2026, and responses are due by August 17, 2026, with the expectation that only small businesses qualify to bid. The project emphasizes specialized expertise in historic preservation roofing techniques and strict compliance with material and installation standards specified in the scope.

General Info

Full roof replacement on six historic buildings in Dillon, Montana, for small business only, adhering to preservation and modern standards.

Agency

Department Of Agriculture → Csa Intermountain 8 Usda-FsView Agency

NAICS

238160 - Roofing ContractorsView NAICS

Place of Performance

Dillon, MT, 59725, USA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Intermountain 8 Usda-Fs
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Agriculture → Csa Intermountain 8 Usda-Fs
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Complete removal and replacement of roofing systems on six historic structures at Birch Creek CCC Camp, including demolition, underlayment, sheathing, SBS modified bitumen rolled roofing, flashing, drip edge, trim, and waterproofing.

Similar Contracts

Same NAICS industry code

NAICS: 238160
New
SLED
Fishermen's Terminal C-15 Building ImprovementThe Port of Seattle through its Waterfront Project Management division is preparing to undertake significant improvements to Building C-15 at Fishermen’s Terminal, with work scheduled to begin in 2026. The project will encompass a comprehensive rehabilitation of the building’s exterior and structural components, including the complete replacement of the existing roof gutters, installation of new roof top vents, replacement of 151 windows, repair or replacement of the building cladding, and structural integrity upgrades to the tower structure. This scope of work is designed to enhance the building’s durability, weather resistance, and long-term functionality while maintaining its operational role at the terminal. The North American Industry Classification System code for this undertaking is 238160, indicating it falls under roofing contractor services. The project is forecasted and not yet solicited, but interested contractors can expect a formal bidding process to follow. Valarie Jarvi serves as the primary point of contact for all inquiries related to the project and can be reached via email or phone, while Rod Jackson is listed as the Project Manager overseeing the initiative. All work will take place at Fishermen’s Terminal in Seattle, though specific street address details are not provided in the public forecast. The official portal for additional information and future solicitation documents is available through the Port of Seattle’s procurement website. This project represents a key infrastructure investment to sustain the operational safety and appearance of a critical component of the terminal’s facility.
Waterfront Project Management

POSTED

about 3 hours ago

DEADLINE

N/A
View Details
NAICS: 238160
New
SLED
Wyoming Boys School Roof Replacements - State Construction Dept.The Wyoming State Construction Department is soliciting bids for a roof replacement project at the Wyoming Boys School in Worland, Wyoming, with all submissions due by 1:00 p.m. Mountain Time on August 31, 2026, through the Public Purchase online bidding system. The project entails removing existing single-ply membrane roofing from four dormitory buildings and part of the maintenance building, repairing damaged decking as necessary, installing new roofing materials, flashing, and trim, and replacing any wet insulation. The total scope involves approximately 455 squares of roofing work. All bids must be submitted via the Public Purchase platform using official State of Wyoming forms; only submissions completed and fully uploaded by the deadline will be accepted, as the system locks precisely at the deadline and incomplete submissions will be disqualified. Bidders are required to register on Public Purchase in advance, noting that account activation may take up to 24 hours, and must access all project documents, addenda, and responses to questions exclusively through the website. Questions regarding the bid must be submitted via Public Purchase no later than 1:00 p.m. MT on August 17, 2026, with all answers provided to all prospective bidders by August 21, 2026, through official addenda or posted responses on the platform; no inquiries received after the cutoff date will be addressed, and communication via phone, email, or fax is not permitted. The solicitation number is 27-0674, and the bid documents, including specifications and plans, are available for download only to registered users on Public Purchase. The primary point of contact is Lenora Simpson, reachable at (307) 777-3558 or lenora.simpson1@wyo.gov, with further guidance on registration available through an official guide posted online. Bidders are responsible for monitoring the Public Purchase site regularly for updates, addenda, and clarifications throughout the bidding period.
Wyoming State Construction Department

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 238160
New
SLED
RFP 2026-10b Courthouse Attic Remediation and Roof RepairWalker County Government is seeking qualified contractors to perform comprehensive attic remediation and roof repair at the Walker County Courthouse located at 103 S Duke Street in LaFayette, Georgia. The scope of work includes addressing moisture intrusion and mold remediation, repairing structural and masonry deficiencies, replacing the entire roof system, and restoring damaged interior and exterior components. Contractors must provide all labor, materials, equipment, and supervision necessary to complete the project to specified standards, ensuring the long-term integrity and safety of the historic building. The solicitation requires detailed proposals demonstrating experience with similar public infrastructure projects and adherence to applicable building codes and environmental regulations. The request for proposal is identified as RFP 2026-10b with solicitation number PE-74600-NONST-2027-000000030, posted on July 24, 2026, and responses are due by August 25, 2026, at 7:00 PM. All proposals must be submitted through the official state procurement portal, with inquiries directed to Jon Pursley, the primary point of contact, via phone at 706-638-4048 or email at j.pursley@walkerga.us. The project is administered by the Walker County Board of Commissioners under the state of Georgia and is classified under a SLED government entity, with no set-aside provisions specified. Performance will occur exclusively at the courthouse location in LaFayette, Georgia.
Walker County Board of Commissioners

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 238160
New
Federal
Building 1860 Roof RepairsOnly Roofing MACC Contractors listed on the General Requirements cover page are eligible to submit proposals for Building 1860 Roof Repairs at Camp Lejeune, North Carolina, under solicitation N4008526R9060. This is a Total Small Business Set-Aside under FAR 19.5, with the NAICS code 238160, and award will be made to the lowest priced responsive offer, subject to compliance with the Buy American statute, where foreign material costs will be adjusted upward for evaluation and preference given to offers not requesting exceptions. The project requires systematic demolition and new roofing work per the New Work Roof Plan and Demolition Roof Plan, including addressing High and Low Roof Fastening Zones, with demolition conducted from top to bottom under an approved plan. Hazardous materials such as lead, cadmium, and chromium at the roof ladder must be addressed, though encapsulation is permitted and full removal is not required. All work must comply with EM 385-1-1, OSHA standards including 29 CFR 1910, 1926, and 1915, and must include a Site Safety and Health Plan, confined space entry plan, and a Quality Control Plan accepted prior to any work beyond mobilization. Materials must be delivered in manufacturer’s sealed, undamaged containers with full labeling including specification, brand, batch, and environmental data where applicable; hazardous asbestos waste must be double-wrapped in 6-millimeter plastic, sealed with duct tape, labeled, and manifested. Paints must be in 5-gallon or smaller containers, and sealants must be clearly marked with type, class, grade, and use. Equipment must conform to MIL-STD-462 and MIL-STD-461. Bonding requirements depend on proposal value: no bonds for bids under $35,000, payment bond only for bids between $35,000 and $149,999, and bid, payment, and performance bonds for bids $150,000 and above, with the bid bond equal to 20% of the proposal amount. Insurance coverage per FAR 28.307-2 must be maintained throughout performance. All proposals must be emailed to the point of contact by 1:00 PM EST on August 3, 2026, with site visit held on July 8,
Navfacsyscom Mid-Atlantic

POSTED

about 19 hours ago

DEADLINE

in 9 days
View Details
NAICS: 238160
New
Federal
Office Roof Replacement Deer Creek LakeThe contract for the Office Roof Replacement at Deer Creek Lake and Dam Office involves the complete removal of the existing Duro-Last roofing system and the installation of a new, fully warranted membrane roofing system that must meet a minimum 20-year warranty, be installed with quality craftsmanship, and be leak-free upon Government acceptance. Work is to be performed at 21897 Deer Creek Road, Mt. Sterling, Ohio, with a mandatory performance period of 60 calendar days beginning no later than 14 days after notice to proceed, targeting completion by October 16, 2026. The new system must include a minimum 60-mil thick white thermoplastic (PVC) membrane, R-30 insulation, and all components must conform strictly to manufacturer specifications with no used or recycled materials permitted. The Government retains full inspection and acceptance authority at the site, enforcing compliance with FAR 52.246-12, USACE EM 385-1-1 safety standards, and applicable federal, state, and local codes, with the contractor responsible for all corrections at no additional cost. This is a Firm-Fixed-Price contract awarded through a Total Small Business Set-Aside under NAICS code 238160, with the solicitation number W9123726QA064 and a response deadline of August 3, 2026. Offerors must be certified small businesses in SAM and maintain compliance with CMMC Level requirements, as failure to meet the CMMC standard renders them ineligible for award. Additional requirements include HSPD-12 security clearances for all personnel accessing federal facilities, mandatory Antiterrorism and Suspicious Activity Reporting training, E-Verify compliance, and adherence to Force Protection Conditions. Contractors must submit electronic proposals via the PIEE system in approved formats, and all invoicing must be conducted electronically through Wide Area WorkFlow per DFARS requirements. The Contracting Officer is Danielle Roar, and the Contract Specialist is Bradley Adkins, with the DoDAAC 9655AT assigned to the U.S. Army Corps of Engineers. No contract value is stated, and pricing details remain absent from the solicitation, though only one line item is listed covering all labor, materials, and disposal responsibilities. All attachments including the Statement of Work, Drawings, and Wage Determination are required for full compliance.
W072 Endist Huntington

POSTED

about 19 hours ago

DEADLINE

in 9 days
View Details
NAICS: 238160
New
Federal
Installation of roof sealantThe contract requires the coating and sealing of the entire roof of Building 6017 at USDA Moore Air Base in Edinburg, Texas, using a heavy-duty elastomeric reflective roof coating, along with the repair of all existing leaks that cannot be addressed by the coating alone. The roof measures approximately 115 feet in length by 75 feet in width, and all work must include power soft washing of the metal surface to ensure proper adhesion. The coating must be applied in two uniform coats, with the first coat specifically covering all seams and joints and allowed to cure for at least one hour before applying the second coat perpendicular to the first. Application is restricted to clear, sunny days with ambient temperatures between 55°F and 110°F, and must be performed using a 3/4” nap exterior paint roller or a professional airless sprayer. Contractors are obligated to attend a mandatory site visit to accurately measure and assess conditions, and must provide names of attendees to the designated point of contact. The project is issued as a Request for Quotations under solicitation number 12639526Q0209, with responses due by August 6, 2026, at noon CT, and is a Total Small Business Set-Aside under NAICS code 238160, with a size standard of $19 million in annual revenue. The estimated contract value ranges between $25,000 and $100,000. The award will be made using the Lowest Price Technically Acceptable (LPTA) method, evaluating quotes for technical acceptability and price reasonableness, with past performance reviewed subjectively based on reputation, adherence to schedules, and conformance to specifications. All work must commence within five calendar days of receiving the notice to proceed and be fully completed, including final cleanup, within 30 days of award. The contract incorporates numerous Federal Acquisition Regulation clauses including Prompt Payment, Construction Wage Rate Requirements, Material and Workmanship, Inspection of Construction, and Performance and Payment Bonds, and requires compliance with Buy American standards, trafficking in persons prohibitions, civil rights laws, and safeguarding requirements for information systems. A payment bond is mandatory, along with various additional security provisions, while a bid bond is not required. Contractors must be registered in SAM, provide Material Safety Data Sheets, maintain a satisfactory safety record, and ensure work is supervised by a qualified superintendent. Progress payments may be requested monthly and
Mrpbs Minneapolis Mn

POSTED

about 19 hours ago

DEADLINE

in 12 days
View Details

More opportunities from Department Of Agriculture → Csa Intermountain 8 Usda-Fs

Same awarding agency

NAICS: 423930
New
Federal
Fire Safety Equipment Supply & Compliance SupportThe contract requires the supply of on-site fire safety equipment tailored for use with powered equipment and power saws, including 2.5-pound dry chemical extinguishers, one-gallon water containers, and one-pound extinguishers specifically for power saws, all of which must meet OSHA standards and the contract’s compliance specifications. The equipment must be delivered and made available at the designated place of performance in Dillon, Montana, with ZIP code 59725, ensuring immediate accessibility for operational safety protocols. All items must be sourced, tested, and certified to ensure full regulatory adherence and suitability for the intended environments. This is a total small business set-aside subcontract under SBA guidelines, with the NAICS code 423930 indicating distribution of hardware, plumbing, and heating equipment, reflecting the nature of the supply chain involved. The solicitation was posted on July 23, 2026, with a response deadline of August 17, 2026, at 6:00 PM, providing a four-week window for qualified small businesses to submit proposals. The contracting agency is the Csa Intermountain 8 USDA-FS under the Department of Agriculture, and the effort supports federal operational safety requirements in a remote location, emphasizing timely delivery and strict compliance with safety and regulatory benchmarks.
Recyclable Material Merchant Wholesalers

POSTED

2 days ago

DEADLINE

in 23 days
View Details
NAICS: 321991
New
Federal
Treated Lumber and Wood Preservative SupplyThe contract seeks the supply of AWPA-compliant treated wood products for roof sheathing and structural repair applications, specifically requiring C9-treated plywood, C31 boron-treated lumber, C20/C27 fire-retardant-treated wood, and M4-compliant field treatment preservatives to meet designated durability and safety standards. All materials must conform to applicable American Wood Protection Association specifications and be suitable for use in USDA Forest Service facilities, with performance required at a designated location in Dillon, Montana, identified by zip code 59725. The solicitation is structured as a subcontract under a Total Small Business Set-Aside, meaning only small businesses certified by the Small Business Administration are eligible to respond, ensuring opportunities for small business participation. The NAICS code 321991 classifies this as other wood product manufacturing, aligning with the production and supply of specialty treated lumber. The opportunity was posted on July 23, 2026, with a firm response deadline of August 17, 2026, at 6:00 PM Eastern Time, giving interested vendors approximately four weeks to prepare and submit proposals. While no point of contact is listed, the contracting entity is the USDA Forest Service’s Csa Intermountain 8 office under the Department of Agriculture. All products must be delivered in compliance with federal procurement standards and field-applied preservatives must be compatible with established repair protocols. Failure to meet AWPA criteria, deliver on time, or conform to small business set-aside requirements will disqualify submissions. The contract aims to secure reliable, high-quality wood products that ensure long-term structural integrity in federal facilities under demanding environmental conditions.
Manufactured Home (Mobile Home) Manufacturing

POSTED

2 days ago

DEADLINE

in 23 days
View Details
NAICS: 238160
New
Federal
Birch Creek Roofing ReplacementThis solicitation, numbered 1240LT26Q0117, is a Request for Quotation under FAR Part 12 for the complete replacement of roofing systems across six structures at the Birch Creek CCC Camp in Dillon, Montana. The work encompasses demolition of existing roofs, installation of underlayment, roof sheathing, SBS modified bitumen rolled roofing, all associated trim, flashing, drip edge, waterproofing, and incidental tasks necessary for full project completion. The acquisition is exclusively set aside for small businesses, with the North American Industry Classification System code 238160 and a size standard of $19 million, making it a Total Small Business Set-Aside. All responsible small businesses may submit quotations, which will be evaluated using a Lowest Price Technically Acceptable methodology. Technical acceptability is determined based on the offeror’s approach to meeting the statement of work, including adherence to FM 4474 wind uplift and ASTM D3746 impact resistance standards, as well as compliance with SMACNA and NRCA installation guidelines. Past performance is assessed using adjectival ratings and is a disqualifying factor if rated unacceptable. Performance must commence within ten calendar days after notice to proceed and be completed within 365 calendar days, with the contract period running from August 24, 2026, to September 24, 2027. The place of performance is the Birch Creek CCC Camp, accessible via I-15 Exit 74 and Birch Creek Road. All submissions must be delivered electronically as four separate Adobe PDF files—signed SF1442, Price Proposal, Technical Proposal including schedule and past performance, and a scanned bid guarantee—to christopher.malley@usda.gov and pps.proposals@usda.gov by August 17, 2026, at 12:00 PM Mountain Time. Questions are due by August 11, 2026. An organized site visit is scheduled for August 6, 2026. Contract administration is handled by the USDA Forest Service, with payments remitted to Ogden, Utah. Compliance with federal labor standards, including wage rate requirements under the Copeland Act, equal opportunity provisions, and trafficking in persons prohibitions, is mandatory. Additionally, special requirements enforce strict fire safety protocols, archaeological preservation procedures, environmental protection rules, and a prohibition on DEI initiatives that conflict with federal anti-discrimination laws. All
Roofing Contractors

POSTED

2 days ago

DEADLINE

in 23 days
View Details
NAICS: 237310
New
Federal
GAOA Red Canyon Corridor Paving, Ashley National ForestThis is a combined synopsis and solicitation for commercial construction under FAR Part 12, issued as a Request for Quotation for the Red Canyon Corridor Paving project on the Ashley National Forest in Daggett County, Utah. The work involves re-paving Forest Road 095 Red Canyon with full depth reclamation, installation of 3-inch asphalt pavement, and 6-inch aggregate base replacement, along with optional work for the Greens Lake Campground Reconstruction, which includes demolition of existing spurs, new asphalt construction, box culvert installation, sign and dumpster pad installation, line striping, and temporary traffic control. All work must conform to the FP24 Forest Service Supplemental Specifications, CSI Specifications for Water Distribution Systems and Earthwork, and approved plans and drawings. The solicitation is a total small business set-aside under NAICS code 237310, with a small business size standard of $45 million, and all offerors must be actively registered in SAM.gov with a valid UEI number to be eligible. The contract is subject to prevailing wage requirements under Executive Order 14026 and the Davis-Bacon Act, with compliance certifications required for labor standards, hazardous material handling, sustainable products, pollution prevention, and anti-discrimination and DEI practices. Proposals must be submitted electronically by 11:00 p.m. MDT on July 31, 2026, to Judith Martin at PPS.proposals@usda.gov, with the solicitation number included in the subject line. Each submission must include a fully completed SF-1442, technical and project management approach addressing scheduling and key personnel resumes, a time-scaled CPM or Gantt schedule showing the critical path, and pricing for all items in Schedule of Items Attachment 2, with unit prices governing in case of arithmetic errors. A bid guarantee of 20% is required if the quote exceeds $150,000, and performance and payment bonds are mandatory upon award. Contractors must demonstrate experience in similar projects and past performance compliance with federal regulations. Evaluation will be based on technical and project management capability, experience, past performance, and price, with technical responsiveness being a pass/fail gate—any missing technical response eliminates consideration. Awards will be made to the offeror providing best value without formal tradeoffs. Performance begins within 10 calendar days of award and must be completed within 120 calendar days, with the contract period running from August
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in 7 days
View Details