Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Santiago Creek Dam Improvement Project, managed by the Irvine Ranch Water District, involves a comprehensive rehabilitation and replacement of the dam's outlet tower and spillway facilities to enhance long-term water resource benefits. Located at the northwest end of Irvine Lake in unincorporated Orange County, California, the project scope includes the construction of new inlet and outlet works, such as an inclined structure, intake riser pipelines, a bifurcation valve vault, and emergency outlet systems. The existing spillway will be replaced with a new side-channel spillway and raised by six feet to an elevation of approximately 797.9 feet. This elevation increase is designed to allow for year-round water impoundment, providing an additional storage capacity of approximately 1,600 acre-feet. Additional infrastructure improvements include the modification of the dam embankment through the installation of a filter drain system, widening and raising the dam crest by up to one foot, and the relocation and upsizing of a portion of the Irvine Lake pipeline to a below-ground position beneath the new spillway. Ancillary site developments will feature a new dam control building, a spillway bridge, an inlet/outlet access roadway, and emergency access walkways and stairs. The project received formal approval on November 10, 2025, following the preparation of an Environmental Impact Report, with the Notice of Determination filed with the Orange County Clerk-Recorder on November 12, 2025.

General Info

Irvine Ranch Water District project rehabilitating Santiago Creek Dam to increase water storage.

Agency

California → Irvine Ranch Water District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Irvine, CA

Set-Aside

NONE

Documents

(2)

Santiago Creek Dam Improvement Project Notice of Determination

PDFnotice-of-determination

Santiago Creek Dam Environmental Impact Report Receipt

PDFreceipt

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Irvine Ranch Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Irvine Ranch Water District
Office AddressN/A
Contacts
Fiona NyeDirector of Water Resources

Full Description

Show more
The Project proposes to rehabilitate and replace the Santiago Creek Dam outlet tower and spillway facilities and to modify the embankment to permit operation of the facilities for a long-term water resource benefit. The Project includes construction of a new inlet/outlet works, including an inclined inlet/outlet structure, intake riser pipelines and platforms, bifurcation valve vault, emergency outlet pipeline, and emergency outlet valve vault. The existing spillway would be replaced with a new side-channel spillway, and a portion of the Irvine Lake pipeline would be upsized and relocated to below ground beneath the proposed spillway structure. The Project includes improvements to the dam crest, removing the dam face, installing a filter drain system within new embankment shell material, widening the dam crest, raising the elevation of the dam crest by up to one foot, and installing protective railings. Ancillary site improvements are also proposed for the Project, including a new inlet/outlet access roadway, spillway bridge, dam control building, and emergency access walkway and stairs. The Project also includes raising the spillway by six feet to approximately 797.9 feet, which is two feet higher than the existing maximum water storage elevation with the flashboards installed. Raising the spillway would allow the dam to impound water up to the 797.9-foot elevation contour year-round, which would allow for storage of an additional approximately 1,600 acre-feet of water.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 10 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 23 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS